PRIMARY SCHOOL VIA FOGAZZARO/PIAZZA ROMA (SUBIACO) (Q2035162): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): EXISTING BOILER REPLACEMENT WITH MODULAR CONDENSING BOILERS, INSTALLATION OF THERMOSTATIC HEADS AND REPLACING RADIATORS, REPLACEMENT OF LIGHTING WITH LED LIGHTS, THERMAL INSULATION OF EIGHT, INSTALLATION OF PHOTOVOLTAIC SYSTEMS., Adding English summary)
(‎Changed an Item)
Property / programme
 
Property / programme: Lazio - ERDF / rank
 
Normal rank

Revision as of 05:46, 24 March 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
PRIMARY SCHOOL VIA FOGAZZARO/PIAZZA ROMA (SUBIACO)
Project in Italy financed by DG Regio

    Statements

    0 references
    182,026.0 Euro
    0 references
    364,052.0 Euro
    0 references
    50.0 percent
    0 references
    2 October 2017
    0 references
    13 December 2018
    0 references
    COMUNE DI SUBIACO
    0 references
    0 references
    0 references

    41°55'36.19"N, 13°5'39.95"E
    0 references
    SOSTITUZIONE CALDAIA ESISTENTE CON CALDAIE MODULARI A CONDENSAZIONE,INSTALLAZIONE TESTE TERMOSTATICHE E SOSTITUZIONE RADIATORI,SOSTITUZIONE CORPI ILLUMINANTI CON CORPI ILLUMINANTI LED,ISOLAMENTO TERMICO A CAPPOTTO,INSTALLAZIONE IMPIANTO FOTOVOLTAICO. (Italian)
    0 references
    EXISTING BOILER REPLACEMENT WITH MODULAR CONDENSING BOILERS, INSTALLATION OF THERMOSTATIC HEADS AND REPLACING RADIATORS, REPLACEMENT OF LIGHTING WITH LED LIGHTS, THERMAL INSULATION OF EIGHT, INSTALLATION OF PHOTOVOLTAIC SYSTEMS. (English)
    0 references

    Identifiers

    J25C16000230009
    0 references