LEONARDO DA VINCI SCHOOL (Q2035140): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): BOILER REPLACEMENT WITH MODULAR CONDENSING BOILERS, INSTALLATION OF CONDENSING HEADS, INSTALLATION AND ADJUSTMENT BODIES, REPLACING LED LIGHTING, THERMAL INSULATION OF CLADDING, REPLACEMENT OF FRAMES, INSTALLATION OF PHOTOVOLTAIC EQUIPMENT, Adding English summary)
(‎Changed an Item)
Property / programme
 
Property / programme: Lazio - ERDF / rank
 
Normal rank

Revision as of 05:46, 24 March 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
LEONARDO DA VINCI SCHOOL
Project in Italy financed by DG Regio

    Statements

    0 references
    332,352.0 Euro
    0 references
    664,704.0 Euro
    0 references
    50.0 percent
    0 references
    18 October 2017
    0 references
    7 January 2019
    0 references
    COMUNE DI COLLEFERRO
    0 references
    0 references
    0 references

    41°43'37.31"N, 13°0'14.98"E
    0 references
    SOSTITUZIONE CALDAIA CON CALDAIE MODULARI A CONDENSAZIONE,INSTALLAZIONE TESTE TERMOSTATICHE E ADEGUAMENTO CORPI RADIANTI,SOSTITUZIONE CORPI ILLUMINANTI CON LED,ISOLAMENTO TERMICO A CAPPOTTO,SOSTITUZIONE INFISSI,INSTALLAZIONE DI IMPIANTO FOTOVOLTAICO (Italian)
    0 references
    BOILER REPLACEMENT WITH MODULAR CONDENSING BOILERS, INSTALLATION OF CONDENSING HEADS, INSTALLATION AND ADJUSTMENT BODIES, REPLACING LED LIGHTING, THERMAL INSULATION OF CLADDING, REPLACEMENT OF FRAMES, INSTALLATION OF PHOTOVOLTAIC EQUIPMENT (English)
    0 references

    Identifiers

    D56J17005020002
    0 references