PRIMARY AND SECONDARY SCHOOL “OTTAVIANO BOTINI” (MUNICIPALITY OF PILIO) (Q2035089): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): INSTALLATION OF THERMOSTATICALLY CONTROLLED HEADS AND RADIATION BODY UPGRADING, REPLACEMENT OF EXISTING ILLUMINATES WITH LED LIGHTS, THERMAL INSULATION OF CLADDING, RENOVATION OF FIXTURES, Adding English summary)
(‎Changed an Item)
Property / programme
 
Property / programme: Lazio - ERDF / rank
 
Normal rank

Revision as of 05:46, 24 March 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
PRIMARY AND SECONDARY SCHOOL “OTTAVIANO BOTINI” (MUNICIPALITY OF PILIO)
Project in Italy financed by DG Regio

    Statements

    0 references
    305,764.0 Euro
    0 references
    611,528.0 Euro
    0 references
    50.0 percent
    0 references
    27 September 2017
    0 references
    13 December 2018
    0 references
    COMUNE DI PIGLIO
    0 references
    0 references
    0 references

    41°49'51.06"N, 13°8'47.04"E
    0 references
    INSTALLAZIONE DI TESTE TERMOSTATICHE E ADEGUAMENTO CORPI RADIANTI,SOSTITUZIONE DEI CORPI ILLUMINANTI ESISTENTI CON CORPI ILLUMINANTI LED,ISOLAMENTO TERMICO A CAPPOTTO,SOSTITUZIONE INFISSI (Italian)
    0 references
    INSTALLATION OF THERMOSTATICALLY CONTROLLED HEADS AND RADIATION BODY UPGRADING, REPLACEMENT OF EXISTING ILLUMINATES WITH LED LIGHTS, THERMAL INSULATION OF CLADDING, RENOVATION OF FIXTURES (English)
    0 references

    Identifiers

    H15I17000060006
    0 references