MEASURES RELATING TO ENERGY EFFICIENCY AND IMPROVEMENT OF THE SUPPLY OF INSTALLATIONS IN THE BUILDING’S PREMISES OF THE MUNICIPALITY OF ROFRANO (Q2023502): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): THE MEASURES ENVISAGED IN THE FINAL DRAFT CAN BE BROKEN DOWN INTO TWO CATEGORIES: THE FIRST STEP IS TO REDUCE THE CURRENT DEMAND FOR ENERGY, WITH THE EFFICIENCY OF PASSIVE BUILDING BLOCKS, WHICH CAN BE DEFINED IN: THERMAL INSULATION OF THE ROOF FLOOR, INSULATION OF VERTICAL EXTERIOR CLOSURES, THERMAL INSULATION OF THE FIRST FLOOR LINE (INSULATING TO NON-HEATED/COOLED VOLUMES) AND THE REPLACEMENT OF EXTERNAL WINDOWS BY EFFICIENT SYSTEMS WHICH ARE...) |
(Changed an Item) |
||
Property / programme | |||
Property / programme: Campania - ERDF / rank | |||
Normal rank |
Revision as of 04:23, 24 March 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | MEASURES RELATING TO ENERGY EFFICIENCY AND IMPROVEMENT OF THE SUPPLY OF INSTALLATIONS IN THE BUILDING’S PREMISES OF THE MUNICIPALITY OF ROFRANO |
Project in Italy financed by DG Regio |
Statements
521,245.99 Euro
0 references
694,994.65 Euro
0 references
75.0 percent
0 references
24 March 2015
0 references
30 April 2019
0 references
COMUNE DI ROFRANO
0 references
GLI INTERVENTI PREVISTI NEL PROGETTO DEFINITIVO SONO DIFFERENZIABILI IN DUE CATEGORIE:-INTERVENTI DI ADEGUAMENTO DELL'INVOLUCRO EDILIZIO-INTERVENTI DI MIGLIORAMENTO ADEGUAMENTO SOSTITUZIONE DEGLI IMPIANTI ESISTENTI E REALIZZAZIONE DI IMPIANTO FOTOVOLTAICO SIA PER LA PRODUZIONE DI ACS E SIA PER LA PRODUZIONE DI ENERGIA ELETTRICA NECESSARIA AL FABBISOGNO DELL'INVOLUCRO EDILIZIO. PER IL PRIMO SI SONO PREVISTI INTERVENTI CHE RIDUCONO LA RICHIESTA ATTUALE DI ENERGIA, CON EFFICIENTAMENTO DEGLI ELEMENTI EDILIZI PASSIVI, DEFINIBILI IN: ISOLAMENTO TERMICO DEL SOLAIO DI COPERTURA, ISOLAMENTO A CAPPOTTO DELLE CHIUSURE ESTERNE VERTICALI, ISOLAMENTO TERMICO DEL PRIMO SOLAIO DI CALPESTIO (ELEMENTO ISOLANTE VERSO VOLUMI NON RISCALDATI/RAFFRESCATI) E SOSTITUZIONE DEI SERRAMENTI ESTERNI CON SISTEMI TRASPARENTI PIù EFFICIENTI. PER QUANTO RIGUARDA GLI INTERVENTI DI MIGLIORAMENTO DEGLI IMPIANTI SI SONO PREVISTI L'UTILIZZO DI SISTEMI ALTERNATIVI CHE PREVEDONO IL RISCALDAMENTO/RAFFRESCAMENTO DEI VOLUMI DEL (Italian)
0 references
THE MEASURES ENVISAGED IN THE FINAL DRAFT CAN BE BROKEN DOWN INTO TWO CATEGORIES: THE FIRST STEP IS TO REDUCE THE CURRENT DEMAND FOR ENERGY, WITH THE EFFICIENCY OF PASSIVE BUILDING BLOCKS, WHICH CAN BE DEFINED IN: THERMAL INSULATION OF THE ROOF FLOOR, INSULATION OF VERTICAL EXTERIOR CLOSURES, THERMAL INSULATION OF THE FIRST FLOOR LINE (INSULATING TO NON-HEATED/COOLED VOLUMES) AND THE REPLACEMENT OF EXTERNAL WINDOWS BY EFFICIENT SYSTEMS WHICH ARE EFFICIENT. AS REGARDS PLANT IMPROVEMENT MEASURES, THE USE OF ALTERNATIVE HEATING/COOLING OF THE VOLUMES OF THE (English)