‘COMPLETION OF CONSOLIDATION OF SMOKE TOWERS AND DAM BAY’ FOR ‘HAZARD ELIMINATION’ — BENEFICIARY: MUNICIPALITY OF MONTE DI PROCIDA (Q2023235): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): THE INTERVENTIONS, AS PLANNED IN THE PROJECT BASED ON THE TENDER, MAINLY CONCERN BRAIDING WITH ANCHOR BARS AND RODS, AIMED AT SECURING THE RIBS THROUGH STABILISATION OF ROCKY FRONTS BY PROTECTING THEM AGAINST ATMOSPHERIC AGENTS. THE IMPROVEMENT MEASURES PROPOSED AT THE STAGE OF THE TENDER CAN BE CONSIDERED COMPLEMENTARY TO THOSE ENVISAGED IN THE PROJECT BY IMPROVING THE FRAMEWORK OF POSSIBLE INTERVENTIONS BY REFERENCE TO THE DIFFERENT STARTING P...)
(‎Changed an Item)
Property / programme
 
Property / programme: Campania - ERDF / rank
 
Normal rank

Revision as of 04:21, 24 March 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
‘COMPLETION OF CONSOLIDATION OF SMOKE TOWERS AND DAM BAY’ FOR ‘HAZARD ELIMINATION’ — BENEFICIARY: MUNICIPALITY OF MONTE DI PROCIDA
Project in Italy financed by DG Regio

    Statements

    0 references
    6,621,516.93 Euro
    0 references
    8,828,689.24 Euro
    0 references
    75.0 percent
    0 references
    30 November 2013
    0 references
    7 February 2019
    0 references
    COMUNE DI MONTE DI PROCIDA
    0 references
    0 references

    40°48'3.28"N, 14°3'6.59"E
    0 references
    GLI INTERVENTI, PREVISTI NEL PROGETTO A BASE DI GARA, RIGUARDANO ESSENZIALMENTE INTERVENTI DI CHIODATURA CON RETI E BARRE DI ANCORAGGIO, VOLTI A METTERE IN SICUREZZA I COSTONI MEDIANTE STABILIZZAZIONE DEI FRONTI ROCCIOSI PROTEGGENDOLI DAGLI AGENTI ATMOSFERICI. GLI INTERVENTI MIGLIORATIVI PROPOSTI IN FASE DI GARA POSSONO RITENERSI COMPLEMENTARI A QUELLI PREVISTI IN PROGETTO PERFEZIONANDO IL QUADRO DEGLI INTERVENTI POSSIBILI IN RIFERIMENTO ALLE DIVERSE DINAMICHE DI INNESCO. LA FILOSOFIA DI INTERVENTO PERSEGUITA, CONTEMPLA: 1. LA CORRETTA REGIMENTAZIONE DELLE ACQUE METEORICHE A MONTE DEI COSTONI (SIA IN AREA URBANIZZATA CHE LIBERA DA EDIFICAZIONI), 2. DRENAGGI SUB SUPERFICIALI PER L'INTERCETTAZIONE DEL FLUSSO PARALLELO AL VERSANTE, 3. RAFFORZAMENTO CORTICALE DEI TERRENI DI COPERTURA, 4. MIGLIORAMENTI QUALITATIVI DEI SISTEMI DI ANCORAGGIO E DELLE RETI DI PROGETTO, PROTEZIONE AL PIEDE DELLE SCARPATE MEDIANTE LA REALIZZAZIONE DI TERRE RINFORZATE. (Italian)
    0 references
    THE INTERVENTIONS, AS PLANNED IN THE PROJECT BASED ON THE TENDER, MAINLY CONCERN BRAIDING WITH ANCHOR BARS AND RODS, AIMED AT SECURING THE RIBS THROUGH STABILISATION OF ROCKY FRONTS BY PROTECTING THEM AGAINST ATMOSPHERIC AGENTS. THE IMPROVEMENT MEASURES PROPOSED AT THE STAGE OF THE TENDER CAN BE CONSIDERED COMPLEMENTARY TO THOSE ENVISAGED IN THE PROJECT BY IMPROVING THE FRAMEWORK OF POSSIBLE INTERVENTIONS BY REFERENCE TO THE DIFFERENT STARTING POINTS. THE COURSE OF ACTION PURSUED INCLUDES: 1 THE CORRECT MANAGEMENT OF THE RAINWATER UPSTREAM OF THE RIBS (IN BOTH THE URBANISED AREA AND FREE OF CONSTRUCTION), 2. SUBSURFACE DRAINAGE FOR THE INTERCEPTION OF PARALLEL FLOW, 3. CORTICAL INCREASE OF COVER PLOTS, 4. QUALITY IMPROVEMENTS OF ANCHORING SYSTEMS AND DESIGN NETWORKS, PROTECTING THE FOOT OF THE SLOPES THROUGH THE REALISATION OF REINFORCED LAND. (English)
    0 references

    Identifiers

    F49D14000190006
    0 references