GIOIA TAURO: COMPLETION OF NORTHERN OPERATIONS (Q2017469): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): THE PURPOSE OF THIS ASSIGNMENT IS TO ENABLE THE MOVEMENT OF TRANSPORT WITHIN THE PORT AREA WITH ADEQUATE SAFETY MARGINS, AVOIDING THE USE OF QUAYS AS TRANSIT ROUTES AND ADAPTING EXISTING INFRASTRUCTURE TO THE NEW EUROPEAN RULES., Adding English summary)
(‎Changed an Item)
Property / programme
 
Property / programme: Infrastructures and Networks - IT - ERDF / rank
 
Normal rank

Revision as of 03:48, 24 March 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
GIOIA TAURO: COMPLETION OF NORTHERN OPERATIONS
Project in Italy financed by DG Regio

    Statements

    0 references
    13,632,624.75 Euro
    0 references
    18,176,833.0 Euro
    0 references
    75.0 percent
    0 references
    1 July 2008
    0 references
    20 November 2019
    0 references
    AUTORITA' PORTUALE DI GIOIA TAURO
    0 references
    0 references

    38°25'26.29"N, 15°53'56.40"E
    0 references
    LA FINALITà DELL¿INTERVENTO Ê CONSENTIRE LA CIRCOLAZIONE VEICOLARE ALL'INTERNO DELL'AREA PORTUALE CON MARGINI DI SICUREZZA ADEGUATI, EVITANDO DI UTILIZZARE LE BANCHINE COME ARTERIE DI TRANSITO E ADEGUANDO LE INFRASTRUTTURE ESISTENTI ALLE NUOVE NORMATIVE EUROPEE (Italian)
    0 references
    THE PURPOSE OF THIS ASSIGNMENT IS TO ENABLE THE MOVEMENT OF TRANSPORT WITHIN THE PORT AREA WITH ADEQUATE SAFETY MARGINS, AVOIDING THE USE OF QUAYS AS TRANSIT ROUTES AND ADAPTING EXISTING INFRASTRUCTURE TO THE NEW EUROPEAN RULES. (English)
    0 references

    Identifiers

    F51B13000280002
    0 references