Linking TEN through better connection between tertiary nodes Turnu Magurele and Levski for sustainable development of the area (Q4301772): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Change because item Q4373720 was merged with Q4370415)
(‎Changed an Item: Change because item Q4373720 was merged with Q4370415)
Property / beneficiaryProperty / beneficiary
Q4373720 (Deleted Item)

Revision as of 22:25, 24 June 2022

Project Q4301772 in Romania, Bulgaria
Language Label Description Also known as
English
Linking TEN through better connection between tertiary nodes Turnu Magurele and Levski for sustainable development of the area
Project Q4301772 in Romania, Bulgaria

    Statements

    0 references
    0 references
    0 references
    0 references
    3,852,690.76 Euro
    0 references
    4,532,577.37 Euro
    0 references
    85.0 percent
    0 references
    15 February 2017
    0 references
    30 August 2020
    0 references
    Turnu Magurele Town
    0 references
    0 references
    0 references
    Q4373720 (Deleted Item)
    0 references

    43°24'14.69"N, 24°38'6.76"E
    0 references

    43°44'44.84"N, 24°52'8.26"E
    0 references
    The challenges addressed by L-TeN project are: under-developed road infrastructure with a high risk of accidents and, as a consequence, to increased travelling times, vehicle operating costs, accidents and damage to the environment. Turnu Magurele is crossed by five NRs and the traffic is increasing. When the beltway (which is collecting traffic from 3 NRs) is overcrowded in order to optimize the time, the five roads targeted by L-TeN project are used to avoid it and to go to Pleven via Nikopole and Levski which is a crossing point for 7 NRs connected with TENT network and E83. The road targeted by L-TeN project is in a poor condition too. General objective is to improve the connection among core and comprehensive TEN-T networks using the tertiary nodes Turnu Magurele and Levski as „bridgeheads” for connection and joint transport system. The specific objectives are: to improve the transport infrastructure; to develop a joint traffic management system and to capitalize the local expertise on traffic safety measures. The main activities are: elaboration of technical documents, works execution, set-up traffic management system and safety traffic measures and awareness campaign. The total budget is 4,676,286.31 euro. The expected result is: 23,427 population will be served. 2 joint mechanisms will be created. L-TeN will improve the connection of Levski with E83, Danube as European corridor VII and future Hemus with E70 and secondary nodes Craiova and Giurgiu via Turnu Magurele. (English)
    0 references

    Identifiers

    0 references