Flood control in the LYS cross-border basin (Q4299647): Difference between revisions
Jump to navigation
Jump to search
(Created a new Item: Import item from Belgium, France) |
(Changed label, description and/or aliases in en: Setting new description) |
||
description / en | description / en | ||
Project Q4299647 in Belgium, France |
Revision as of 20:30, 10 June 2022
Project Q4299647 in Belgium, France
Language | Label | Description | Also known as |
---|---|---|---|
English | Flood control in the LYS cross-border basin |
Project Q4299647 in Belgium, France |
Statements
1,609,616.45 Euro
0 references
3,219,232.9 Euro
0 references
50.0 percent
0 references
10 January 2016
0 references
30 September 2020
0 references
Ville de Comines-Warneton / Stad Komen-Waasten
0 references
The cross-border territory is particularly prone to flooding due to its geological characteristics, aggravated by other stakeholders such as global warming, changes in agricultural practices or the development of urban areas. The territories are joining forces to manage this increasingly recurrent problem and thus protect the exposed populations and properties in the area of the cross-border Lys basin. LINBATYS is a coordinated cross-border action plan to better manage surface waters on small tributaries of the Lys catchment area. The project also proposes a series of hydraulic installations that have a further ecological added value (installations favourable to the development of biodiversity and the preservation of groundwater). The works allow for the temporary storage of rainwater, the increase in the storage capacity of rivers on the Lys plain and existing basins, the limitation of flow velocities, the control of erosion problems and mudflows and improved water drainage. Because water does not stop at the border and because the way water is managed on one side inevitably impacts the neighbouring side(s), the cross-border approach is essential to adapt the hydraulic capacities on the Lys river basin through concerted management and thus improve the situation on the 3 sides of the project area. Local residents and stakeholders are made aware of the dangers associated with flooding. (English)
0 references