(10360.14072017.115000115) ENERGY UPGRADING OF AVERAGE SCHOOLS (Q2155742): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): ACTION 1: REPLACEMENT OF EXTERNAL WINDOW FRAMES AND INSTALLATION OF SUNSCREENS, INTERVENTION 2: REPLACEMENT OF THE THERMAL GENERATOR TO BE OPERATED BY SPOGLIENCY 3: INSTALLATION OF SOLAR THERMAL PANELS FOR THE PRODUCTION OF ACSINTERVENTO 4: INSULATION OF SUB-FLOOR INTERVENTION 5: INSULATION OF PIANAINTERVENTION ROOF 6: INSTALLATION OF THERMOSTATIC CONTROL VALVES AND REPLACEMENT OF THE CIRCULAR PUMP INTERVENTO 7: INSTALLATION OF THE SOLAR PLANT P...) |
||
Property / summary | |||
ACTION 1: REPLACEMENT OF EXTERNAL WINDOW FRAMES AND INSTALLATION OF SUNSCREENS, INTERVENTION 2: REPLACEMENT OF THE THERMAL GENERATOR TO BE OPERATED BY SPOGLIENCY 3: INSTALLATION OF SOLAR THERMAL PANELS FOR THE PRODUCTION OF ACSINTERVENTO 4: INSULATION OF SUB-FLOOR INTERVENTION 5: INSULATION OF PIANAINTERVENTION ROOF 6: INSTALLATION OF THERMOSTATIC CONTROL VALVES AND REPLACEMENT OF THE CIRCULAR PUMP INTERVENTO 7: INSTALLATION OF THE SOLAR PLANT PHOTOVOLTAIINTERVENTO 8: REPLACEMENT OF THE HEATING GENERATOR IN THE SERVICE OF THE SCHOOL (English) | |||
Property / summary: ACTION 1: REPLACEMENT OF EXTERNAL WINDOW FRAMES AND INSTALLATION OF SUNSCREENS, INTERVENTION 2: REPLACEMENT OF THE THERMAL GENERATOR TO BE OPERATED BY SPOGLIENCY 3: INSTALLATION OF SOLAR THERMAL PANELS FOR THE PRODUCTION OF ACSINTERVENTO 4: INSULATION OF SUB-FLOOR INTERVENTION 5: INSULATION OF PIANAINTERVENTION ROOF 6: INSTALLATION OF THERMOSTATIC CONTROL VALVES AND REPLACEMENT OF THE CIRCULAR PUMP INTERVENTO 7: INSTALLATION OF THE SOLAR PLANT PHOTOVOLTAIINTERVENTO 8: REPLACEMENT OF THE HEATING GENERATOR IN THE SERVICE OF THE SCHOOL (English) / rank | |||
Normal rank |
Revision as of 11:40, 23 March 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | (10360.14072017.115000115) ENERGY UPGRADING OF AVERAGE SCHOOLS |
Project in Italy financed by DG Regio |
Statements
118,076.4 Euro
0 references
393,587.99 Euro
0 references
30.0 percent
0 references
30 March 2018
0 references
30 March 2020
0 references
16 November 2020
0 references
COMUNE DI SAN VINCENZO
0 references
INTERVENTO 1: SOSTITUZIONE DEI SERRAMENTI ESTERNI ED INSTALLAZIONE DI SCHERMATURE SOLARI INTERVENTO 2: SOSTITUZIONE DEL GENERATORE TERMICO A SERVIZIO DEGLI SPOGLIATOIINTERVENTO 3: INSTALLAZIONE DI PANNELLI SOLARI TERMICI PER LA PRODUZIONE DI ACSINTERVENTO 4: COIBENTAZIONE DEL SOLAIO SOTTOTETTO INTERVENTO 5: COIBENTAZIONE DEL SOLAIO DI COPERTURA PIANAINTERVENTO 6: INSTALLAZIONE DI VALVOLE TERMOSTATICHE E SOSTITUZIONE DELLA POMPA DI CIRCOLAZIONEINTERVENTO 7: INSTALLAZIONE DI IMPIANTO SOLARE FOTOVOLTAICOINTERVENTO 8: SOSTITUZIONE DEL GENERATORE TERMICO A SERVIZIO DELLA SCUOLA (Italian)
0 references
ACTION 1: REPLACEMENT OF EXTERNAL WINDOW FRAMES AND INSTALLATION OF SUNSCREENS, INTERVENTION 2: REPLACEMENT OF THE THERMAL GENERATOR TO BE OPERATED BY SPOGLIENCY 3: INSTALLATION OF SOLAR THERMAL PANELS FOR THE PRODUCTION OF ACSINTERVENTO 4: INSULATION OF SUB-FLOOR INTERVENTION 5: INSULATION OF PIANAINTERVENTION ROOF 6: INSTALLATION OF THERMOSTATIC CONTROL VALVES AND REPLACEMENT OF THE CIRCULAR PUMP INTERVENTO 7: INSTALLATION OF THE SOLAR PLANT PHOTOVOLTAIINTERVENTO 8: REPLACEMENT OF THE HEATING GENERATOR IN THE SERVICE OF THE SCHOOL (English)
0 references
Identifiers
D47F18000420006
0 references