(Created claim: summary (P836): DOES THE PROJECT PROVIDE, THROUGH THE CALCULATION OF THE STRUCTURE’S ENERGY BALANCE, TO REPLACE THE AIR-CONDITIONING INSTALLATIONS IN THE FIRST PLANE WITH OTHER PLANTS WITH ENERGY EFFICIENT HEAT PUMP SYSTEMS, WHICH ARE ALSO DISTRIBUTED ON THE GROUND FLOOR IN AREAS WHERE? IM? HEATING USING RADIATORS. DOES THE CALCULATION TAKE ACCOUNT OF THE WHOLE STRUCTURE (FIRST AND GROUND) AND THE REQUIREMENT OF SAVING? ? STATE ANALYSED ON THE TWO PLANS BY PROV...) |
||
Property / summary | |||
DOES THE PROJECT PROVIDE, THROUGH THE CALCULATION OF THE STRUCTURE’S ENERGY BALANCE, TO REPLACE THE AIR-CONDITIONING INSTALLATIONS IN THE FIRST PLANE WITH OTHER PLANTS WITH ENERGY EFFICIENT HEAT PUMP SYSTEMS, WHICH ARE ALSO DISTRIBUTED ON THE GROUND FLOOR IN AREAS WHERE? IM? HEATING USING RADIATORS. DOES THE CALCULATION TAKE ACCOUNT OF THE WHOLE STRUCTURE (FIRST AND GROUND) AND THE REQUIREMENT OF SAVING? ? STATE ANALYSED ON THE TWO PLANS BY PROVIDING FOR THE CONTRIBUTION OF THE GROUND FLOOR THROUGH THE CONSTRUCTION OF ALUMINIUM OR PVC WINDOWS WITH LOW EMISSIONS EMISSIONS ON ORIGINAL DESIGN, AS? THIS IS DONE IN THE RECENT REPLACEMENTS, WHICH CAN SUPPORT THE HEAVINESS OF THE WINDOWS AND BALANCING THE REQUIREMENTS OF MAINTENANCE AND CONTAINMENT OF ENERGY COSTS WITH THE REQUIREMENTS OF PROTECTING THE HISTORICAL GOOD. THE TYPE OF INFIXED FIXED? SET OUT IN THE DETAILS OF THE ATTACHED DRAFT AND THE FIRST PLAN, (English) | |||
Property / summary: DOES THE PROJECT PROVIDE, THROUGH THE CALCULATION OF THE STRUCTURE’S ENERGY BALANCE, TO REPLACE THE AIR-CONDITIONING INSTALLATIONS IN THE FIRST PLANE WITH OTHER PLANTS WITH ENERGY EFFICIENT HEAT PUMP SYSTEMS, WHICH ARE ALSO DISTRIBUTED ON THE GROUND FLOOR IN AREAS WHERE? IM? HEATING USING RADIATORS. DOES THE CALCULATION TAKE ACCOUNT OF THE WHOLE STRUCTURE (FIRST AND GROUND) AND THE REQUIREMENT OF SAVING? ? STATE ANALYSED ON THE TWO PLANS BY PROVIDING FOR THE CONTRIBUTION OF THE GROUND FLOOR THROUGH THE CONSTRUCTION OF ALUMINIUM OR PVC WINDOWS WITH LOW EMISSIONS EMISSIONS ON ORIGINAL DESIGN, AS? THIS IS DONE IN THE RECENT REPLACEMENTS, WHICH CAN SUPPORT THE HEAVINESS OF THE WINDOWS AND BALANCING THE REQUIREMENTS OF MAINTENANCE AND CONTAINMENT OF ENERGY COSTS WITH THE REQUIREMENTS OF PROTECTING THE HISTORICAL GOOD. THE TYPE OF INFIXED FIXED? SET OUT IN THE DETAILS OF THE ATTACHED DRAFT AND THE FIRST PLAN, (English) / rank | |||
Normal rank |
Revision as of 10:07, 23 March 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | (10360.14072017.115000315) LIVORNO HOSPITAL RECEPTION |
Project in Italy financed by DG Regio |
Statements
1,112,365.37 Euro
0 references
2,471,923.03 Euro
0 references
45.0 percent
0 references
3 April 2018
0 references
3 April 2020
0 references
16 November 2020
0 references
AZIENDA USL TOSCANA NORD OVEST
0 references
IL PROGETTO PREVEDE, ATTRAVERSO IL CALCOLO DEL BILANCIO ENERGETICO DELLA STRUTTURA, DI SOSTITUIRE GLI IMPIANTI DI CLIMATIZZAZIONE DEI CAMMINAMENTI AL PIANO PRIMO CON ALTRI CON SISTEMI ALIMENTATI DA POMPA DI CALORE ELETTRICA AD ALTA EFFICIENZA ENERGETICA, DISTRIBUITI ANCHE AL PIANO TERRA NELLE ZONE DOVE ? GI? PRESENTE IL RISCALDAMENTO MEDIANTE RADIATORI. IL CALCOLO PRENDE IN CONSIDERAZIONE L?INTERA STRUTTURA (PIANO PRIMO E TERRA) ED IL REQUISITO DI ?RISPARMIO? ? STATO ANALIZZATO SUI DUE PIANI PREVEDENDO IL CONTRIBUTO DEL PIANO TERRA ATTRAVERSO LA REALIZZAZIONE DI INFISSI IN ALLUMINIO O PVC CON VETRO-CAMERA BASSO EMISSIVI SU DISEGNO ORIGINARIO, COME ? STATO FATTO NELLE RECENTI SOSTITUZIONI, CHE POSSANO SOSTENERE LA PESANTEZZA DEI VETRI CAMERA E CONTEMPERARE LE ESIGENZE DI MANUTENZIONE E CONTENIMENTO DEI COSTI ENERGETICI CON QUELLE DI TUTELA DEL BENE STORICO. IL TIPO DI INFISSO PREVISTO ? RIPORTATO NEI PARTICOLARI DEL PROGETTO ALLEGATO E NEGLI ELABORATI TECNICODESCRITTIVI.AL PRIMO PIANO, (Italian)
0 references
DOES THE PROJECT PROVIDE, THROUGH THE CALCULATION OF THE STRUCTURE’S ENERGY BALANCE, TO REPLACE THE AIR-CONDITIONING INSTALLATIONS IN THE FIRST PLANE WITH OTHER PLANTS WITH ENERGY EFFICIENT HEAT PUMP SYSTEMS, WHICH ARE ALSO DISTRIBUTED ON THE GROUND FLOOR IN AREAS WHERE? IM? HEATING USING RADIATORS. DOES THE CALCULATION TAKE ACCOUNT OF THE WHOLE STRUCTURE (FIRST AND GROUND) AND THE REQUIREMENT OF SAVING? ? STATE ANALYSED ON THE TWO PLANS BY PROVIDING FOR THE CONTRIBUTION OF THE GROUND FLOOR THROUGH THE CONSTRUCTION OF ALUMINIUM OR PVC WINDOWS WITH LOW EMISSIONS EMISSIONS ON ORIGINAL DESIGN, AS? THIS IS DONE IN THE RECENT REPLACEMENTS, WHICH CAN SUPPORT THE HEAVINESS OF THE WINDOWS AND BALANCING THE REQUIREMENTS OF MAINTENANCE AND CONTAINMENT OF ENERGY COSTS WITH THE REQUIREMENTS OF PROTECTING THE HISTORICAL GOOD. THE TYPE OF INFIXED FIXED? SET OUT IN THE DETAILS OF THE ATTACHED DRAFT AND THE FIRST PLAN, (English)
0 references
Identifiers
J46G18000220002
0 references