(‎Created claim: summary (P836): THE PROJECT PROVIDES FOR AN EXTENSION OF THE PROPERTY TO BE EXTENDED UPSTREAM OF THE BUILDING TO THE NORTH FOR THE PURPOSE OF CARRYING OUT A SEPARATE WORKS OF CONSTRUCTION WORKS IN ITS OWN RIGHT BUT ATTACHED TO THE EXISTING ZONE TO BE USED BY CHAMBERS FOR STAFF ON THE GROUND FLOOR, WELLNESS WITH A SWIMMING POOL AT THE FIRST FLOOR AND CONFERENCE ROOM ON THE SECOND FLOOR., Adding English summary)
Property / summary
 
THE PROJECT PROVIDES FOR AN EXTENSION OF THE PROPERTY TO BE EXTENDED UPSTREAM OF THE BUILDING TO THE NORTH FOR THE PURPOSE OF CARRYING OUT A SEPARATE WORKS OF CONSTRUCTION WORKS IN ITS OWN RIGHT BUT ATTACHED TO THE EXISTING ZONE TO BE USED BY CHAMBERS FOR STAFF ON THE GROUND FLOOR, WELLNESS WITH A SWIMMING POOL AT THE FIRST FLOOR AND CONFERENCE ROOM ON THE SECOND FLOOR. (English)
Property / summary: THE PROJECT PROVIDES FOR AN EXTENSION OF THE PROPERTY TO BE EXTENDED UPSTREAM OF THE BUILDING TO THE NORTH FOR THE PURPOSE OF CARRYING OUT A SEPARATE WORKS OF CONSTRUCTION WORKS IN ITS OWN RIGHT BUT ATTACHED TO THE EXISTING ZONE TO BE USED BY CHAMBERS FOR STAFF ON THE GROUND FLOOR, WELLNESS WITH A SWIMMING POOL AT THE FIRST FLOOR AND CONFERENCE ROOM ON THE SECOND FLOOR. (English) / rank
 
Normal rank

Revision as of 10:06, 23 March 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
EXTENSION WORKS HOTEL CHERZ
Project in Italy financed by DG Regio

    Statements

    0 references
    129,931.19 Euro
    0 references
    259,862.38 Euro
    0 references
    50.0 percent
    0 references
    31 May 2019
    0 references
    1 April 2021
    0 references
    HOTEL MONTE CHERZ DI DE DORIGO GIORGIO AND C. SNC
    0 references
    0 references

    46°30'23.87"N, 11°56'12.52"E
    0 references
    IL PROGETTO PREVEDE UN AMPLIAMENTO DELL¿IMMOBILE A MONTE DELL¿EDIFICIO VERSO NORD PER LA REALIZZAZIONE DI UN CORPO DI FABBRICA A SE STANTE MA COLLEGATO ALL¿ESISTENTE DA ADIBIRE A CAMERE PER IL PERSONALE AL PIANO TERRA, CENTRO BENESSERE CON PISCINA AL PRIMO PIANO E SALA CONGRESSI AL SECONDO PIANO. (Italian)
    0 references
    THE PROJECT PROVIDES FOR AN EXTENSION OF THE PROPERTY TO BE EXTENDED UPSTREAM OF THE BUILDING TO THE NORTH FOR THE PURPOSE OF CARRYING OUT A SEPARATE WORKS OF CONSTRUCTION WORKS IN ITS OWN RIGHT BUT ATTACHED TO THE EXISTING ZONE TO BE USED BY CHAMBERS FOR STAFF ON THE GROUND FLOOR, WELLNESS WITH A SWIMMING POOL AT THE FIRST FLOOR AND CONFERENCE ROOM ON THE SECOND FLOOR. (English)