(Created claim: summary (P836): IN ORDER TO PURSUE THE OBJECTIVES OF IMPROVING THE ENERGY EFFICIENCY OF THE BUILDING IN QUESTION? SET UP A SPECIFIC PROJECT BASED ON THE FOLLOWING CONTENT OF THE FIXTURES: ? PROVISION IS MADE FOR THE REMOVAL OF ANY EXISTING WINDOW FRAMES WHICH DO NOT MEET THE PERFORMANCE REQUIREMENTS LAID DOWN IN MINIMUM REQUIREMENTS 26/06/2015; IN PARALLEL, DO YOU PROCEED? THE INSTALLATION OF NEW ALUMINIUM, THERMAL CUT WINDOWS, WITH VETRO-CAMERA BASO-LOW-EMISSI...) |
||
Property / summary | |||
IN ORDER TO PURSUE THE OBJECTIVES OF IMPROVING THE ENERGY EFFICIENCY OF THE BUILDING IN QUESTION? SET UP A SPECIFIC PROJECT BASED ON THE FOLLOWING CONTENT OF THE FIXTURES: ? PROVISION IS MADE FOR THE REMOVAL OF ANY EXISTING WINDOW FRAMES WHICH DO NOT MEET THE PERFORMANCE REQUIREMENTS LAID DOWN IN MINIMUM REQUIREMENTS 26/06/2015; IN PARALLEL, DO YOU PROCEED? THE INSTALLATION OF NEW ALUMINIUM, THERMAL CUT WINDOWS, WITH VETRO-CAMERA BASO-LOW-EMISSION (BE), MEETING THE PERFORMANCE REQUIREMENTS OF MINISTERIAL DECREE NO 16.02.2016 (THERMAL ACCOUNT 2.0) WITH HEW ELT; 1,67 W7M.K. THE AVTRR INSTALLATION? WITH PARTICULAR ATTENTION TO THE CORRECTION OF C.D.? FOR THERMAL BRIDGES? IT THEREFORE ALSO PROVIDES FOR THE REPLACEMENT OF EXISTING THRESHOLDS WITH NEW HEAT CUT THRESHOLDS. SUD-EXD-SUD-OVEST GLAZING WILL BE EQUIPPED WITH A SELECTIVE COATING (SOLAR CONTROLLED GLASS) OF GLASS G, GL, N ELT; 0,35-THERMAL INSULATION OF HORIZONTAL AND VERTICAL STRUCTURES: LONG (English) | |||
Property / summary: IN ORDER TO PURSUE THE OBJECTIVES OF IMPROVING THE ENERGY EFFICIENCY OF THE BUILDING IN QUESTION? SET UP A SPECIFIC PROJECT BASED ON THE FOLLOWING CONTENT OF THE FIXTURES: ? PROVISION IS MADE FOR THE REMOVAL OF ANY EXISTING WINDOW FRAMES WHICH DO NOT MEET THE PERFORMANCE REQUIREMENTS LAID DOWN IN MINIMUM REQUIREMENTS 26/06/2015; IN PARALLEL, DO YOU PROCEED? THE INSTALLATION OF NEW ALUMINIUM, THERMAL CUT WINDOWS, WITH VETRO-CAMERA BASO-LOW-EMISSION (BE), MEETING THE PERFORMANCE REQUIREMENTS OF MINISTERIAL DECREE NO 16.02.2016 (THERMAL ACCOUNT 2.0) WITH HEW ELT; 1,67 W7M.K. THE AVTRR INSTALLATION? WITH PARTICULAR ATTENTION TO THE CORRECTION OF C.D.? FOR THERMAL BRIDGES? IT THEREFORE ALSO PROVIDES FOR THE REPLACEMENT OF EXISTING THRESHOLDS WITH NEW HEAT CUT THRESHOLDS. SUD-EXD-SUD-OVEST GLAZING WILL BE EQUIPPED WITH A SELECTIVE COATING (SOLAR CONTROLLED GLASS) OF GLASS G, GL, N ELT; 0,35-THERMAL INSULATION OF HORIZONTAL AND VERTICAL STRUCTURES: LONG (English) / rank | |||
Normal rank |
Revision as of 09:58, 23 March 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | (10360.14072017.115000071) 05.18_3053_ILBORO |
Project in Italy financed by DG Regio |
Statements
107,143.82 Euro
0 references
310,561.79 Euro
0 references
34.5 percent
0 references
1 January 2018
0 references
23 March 2020
0 references
31 March 2020
0 references
COMUNE DI PRATO
0 references
ALLO SCOPO DI PERSEGUIRE GLI OBIETTIVI DI EFFICIENTAMENTO ENERGETICO DELL?EDIFICIO IN ESAME, SI ? PREDISPOSTO UNO SPECIFICO PROGETTO CHE SI ARTICOLA SECONDO I SEGUENTI CONTENUTI.- INFISSI: ? PREVISTA LA RIMOZIONE DI TUTTI QUEGLI INFISSI ESISTENTI CHE NON RISPONDONO AI REQUISITI PRESTAZIONALI DI CUI AL DECRETO REQUISITI MINIMI 26/06/2015; PARALLELAMENTE, SI PROCEDER? ALLA POSA IN OPERA DI NUOVI SERRAMENTI IN ALLUMINIO, A TAGLIO TERMICO, CON VETRO-CAMERA BASSO-EMISSIVO (BE), RISPONDENTI AI REQUISITI PRESTAZIONALI DEL D.M. 16.02.2016 (CONTO TERMICO 2.0) CON UW ELT; 1,67 W7MQ.K. L'INSTALLAZIONE AVVERR? CON PARTICOLARE ATTENZIONE ALLA CORREZIONE DEI C.D. ?PONTI TERMICI? PREVEDENDO QUINDI ANCHE LA SOSTITUZIONE DELLE ATTUALI SOGLIE CON NUOVE SOGLIE A TAGLIO TERMICO. LE VETRATE CON ORIENTAMENTO SUD-EST-SUD-SUD-OVEST SARANNO DOTATE DI RIVESTIMENTO SELETTIVO (VETRO A CONTROLLO SOLARE) CON FATTORE SOLARE DEL VETRO G, GL,N ELT; 0,35.- ISOLAMENTO TERMICO STRUTTURE ORIZZONTALI E VERTICALI: LUNGO GLI (Italian)
0 references
IN ORDER TO PURSUE THE OBJECTIVES OF IMPROVING THE ENERGY EFFICIENCY OF THE BUILDING IN QUESTION? SET UP A SPECIFIC PROJECT BASED ON THE FOLLOWING CONTENT OF THE FIXTURES: ? PROVISION IS MADE FOR THE REMOVAL OF ANY EXISTING WINDOW FRAMES WHICH DO NOT MEET THE PERFORMANCE REQUIREMENTS LAID DOWN IN MINIMUM REQUIREMENTS 26/06/2015; IN PARALLEL, DO YOU PROCEED? THE INSTALLATION OF NEW ALUMINIUM, THERMAL CUT WINDOWS, WITH VETRO-CAMERA BASO-LOW-EMISSION (BE), MEETING THE PERFORMANCE REQUIREMENTS OF MINISTERIAL DECREE NO 16.02.2016 (THERMAL ACCOUNT 2.0) WITH HEW ELT; 1,67 W7M.K. THE AVTRR INSTALLATION? WITH PARTICULAR ATTENTION TO THE CORRECTION OF C.D.? FOR THERMAL BRIDGES? IT THEREFORE ALSO PROVIDES FOR THE REPLACEMENT OF EXISTING THRESHOLDS WITH NEW HEAT CUT THRESHOLDS. SUD-EXD-SUD-OVEST GLAZING WILL BE EQUIPPED WITH A SELECTIVE COATING (SOLAR CONTROLLED GLASS) OF GLASS G, GL, N ELT; 0,35-THERMAL INSULATION OF HORIZONTAL AND VERTICAL STRUCTURES: LONG (English)
0 references
Identifiers
C38G18000070007
0 references