EFFICIENCY (10360.14072017.115000058) (Q2056982): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): THE SCHOOL ENERGY EFFICIENCY PROJECT INCLUDES THE FOLLOWING INTERVENTIONS: 1A) THERMAL INSULATION OF HORIZONTAL AND VERTICAL STRUCTURES, 2A) REPLACEMENT OF WINDOW FRAMES AND FRAMES; 3A) REPLACING AIR-CONDITIONING SYSTEMS WITH SYSTEMS FUELLED BY CONDENSING GAS BOILERS OR HEAT PUMPS AT THE TOP OF THE PRIORITY OF THE STUDY ON FATTIELILIT? TECHNICAL AND ECONOMIC? MAXIMISING ENERGY EFFICIENCY AND HOUSING COMFORT OF CHILDREN BY REDUCING ENERGY CONSUMP...) |
||
Property / summary | |||
THE SCHOOL ENERGY EFFICIENCY PROJECT INCLUDES THE FOLLOWING INTERVENTIONS: 1A) THERMAL INSULATION OF HORIZONTAL AND VERTICAL STRUCTURES, 2A) REPLACEMENT OF WINDOW FRAMES AND FRAMES; 3A) REPLACING AIR-CONDITIONING SYSTEMS WITH SYSTEMS FUELLED BY CONDENSING GAS BOILERS OR HEAT PUMPS AT THE TOP OF THE PRIORITY OF THE STUDY ON FATTIELILIT? TECHNICAL AND ECONOMIC? MAXIMISING ENERGY EFFICIENCY AND HOUSING COMFORT OF CHILDREN BY REDUCING ENERGY CONSUMPTION BY CUTTING ENERGY USE ON THE STRUCTURE, THE INTERVENTION, IN ACCORDANCE WITH THE LEGISLATION IN FORCE (MINISTERIAL DECREE 26/06/2015) AND TAKING INTO ACCOUNT THE INTENDED USE OF THE BUILDING, AIMS TO ENERGY EFFICIENCY OF THE BUILDING SYSTEM THROUGH L? THERMAL INSULATION OF THE OPAQUE STRUCTURES AND THE REPLACEMENT OF TRANSPARENTICON BUILDINGS THE HIGH EFFICIENCY EXTERIOR WINDOWS IN PVAC, WITH A VIEW TO REDUCING ENERGY AND SECURITY CONSUMPTION (English) | |||
Property / summary: THE SCHOOL ENERGY EFFICIENCY PROJECT INCLUDES THE FOLLOWING INTERVENTIONS: 1A) THERMAL INSULATION OF HORIZONTAL AND VERTICAL STRUCTURES, 2A) REPLACEMENT OF WINDOW FRAMES AND FRAMES; 3A) REPLACING AIR-CONDITIONING SYSTEMS WITH SYSTEMS FUELLED BY CONDENSING GAS BOILERS OR HEAT PUMPS AT THE TOP OF THE PRIORITY OF THE STUDY ON FATTIELILIT? TECHNICAL AND ECONOMIC? MAXIMISING ENERGY EFFICIENCY AND HOUSING COMFORT OF CHILDREN BY REDUCING ENERGY CONSUMPTION BY CUTTING ENERGY USE ON THE STRUCTURE, THE INTERVENTION, IN ACCORDANCE WITH THE LEGISLATION IN FORCE (MINISTERIAL DECREE 26/06/2015) AND TAKING INTO ACCOUNT THE INTENDED USE OF THE BUILDING, AIMS TO ENERGY EFFICIENCY OF THE BUILDING SYSTEM THROUGH L? THERMAL INSULATION OF THE OPAQUE STRUCTURES AND THE REPLACEMENT OF TRANSPARENTICON BUILDINGS THE HIGH EFFICIENCY EXTERIOR WINDOWS IN PVAC, WITH A VIEW TO REDUCING ENERGY AND SECURITY CONSUMPTION (English) / rank | |||
Normal rank |
Revision as of 09:58, 23 March 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | EFFICIENCY (10360.14072017.115000058) |
Project in Italy financed by DG Regio |
Statements
46,135.87 Euro
0 references
102,524.14 Euro
0 references
45.0 percent
0 references
30 March 2018
0 references
30 March 2020
0 references
16 November 2020
0 references
COMUNE DI LAMPORECCHIO
0 references
IL PROGETTO DI EFFICIENTAMENTO ENERGETICO DELLA SCUOLA PREVEDE I SEGUENTI INTERVENTI:1A) ISOLAMENTO TERMICO DI STRUTTURE ORIZZONTALI E VERTICALI;2A) SOSTITUZIONE DI SERRAMENTI E INFISSI;3A) SOSTITUZIONE DI IMPIANTI DI CLIMATIZZAZIONE CON IMPIANTI ALIMENTATI DA CALDAIE A GAS A CONDENSAZIONE O DA POMPE DI CALORE AD ALTA EFFICIENZA.OBIETTIVO PRIORITARIO DELLO STUDIO DI FATTIBILIT? TECNICO ED ECONOMICA ? LA MASSIMIZZAZIONE DELL'EFFICIENZA ENERGETICA E DEL COMFORT ABITATIVO DELLA SCUOLA DELL'INFANZIA ATTRAVERSO LA RIDUZIONE DEI CONSUMI ENERGETICI CON INTERVENTI DI COIBENTAZIONE SULLA STRUTTURA,L?INTERVENTO, IN ACCORDO CON LA NORMATIVA VIGENTE (DM 26/06/2015) ED IN CONSIDERAZIONE DELLA DESTINAZIONE D?USO DELL?EDIFICIO, MIRA ALL?EFFICIENTAMENTO ENERGETICO DEL SISTEMA EDIFICIO-IMPIANTO ATTRAVERSO L?ISOLAMENTO TERMICO DELLE STRUTTURE OPACHE E LA SOSTITUZIONE DELLE CHIUSURE TRASPARENTICON LA PREVISIONE DI INFISSI ESTERNI AD ALTA EFFICIENZA IN PVC.AL FINE DI RIDURRE I CONSUMI ENERGETICI E GARANTI (Italian)
0 references
THE SCHOOL ENERGY EFFICIENCY PROJECT INCLUDES THE FOLLOWING INTERVENTIONS: 1A) THERMAL INSULATION OF HORIZONTAL AND VERTICAL STRUCTURES, 2A) REPLACEMENT OF WINDOW FRAMES AND FRAMES; 3A) REPLACING AIR-CONDITIONING SYSTEMS WITH SYSTEMS FUELLED BY CONDENSING GAS BOILERS OR HEAT PUMPS AT THE TOP OF THE PRIORITY OF THE STUDY ON FATTIELILIT? TECHNICAL AND ECONOMIC? MAXIMISING ENERGY EFFICIENCY AND HOUSING COMFORT OF CHILDREN BY REDUCING ENERGY CONSUMPTION BY CUTTING ENERGY USE ON THE STRUCTURE, THE INTERVENTION, IN ACCORDANCE WITH THE LEGISLATION IN FORCE (MINISTERIAL DECREE 26/06/2015) AND TAKING INTO ACCOUNT THE INTENDED USE OF THE BUILDING, AIMS TO ENERGY EFFICIENCY OF THE BUILDING SYSTEM THROUGH L? THERMAL INSULATION OF THE OPAQUE STRUCTURES AND THE REPLACEMENT OF TRANSPARENTICON BUILDINGS THE HIGH EFFICIENCY EXTERIOR WINDOWS IN PVAC, WITH A VIEW TO REDUCING ENERGY AND SECURITY CONSUMPTION (English)
0 references
Identifiers
H58G18000040006
0 references