FITTING OUT OF NATURAL ENGINEERING AND HYDRAULIC SYSTEM OF THE WATERS COMING FROM CERQUES AND THE ROUTE TAKEN INTO ACCOUNT FOR THE CARRIAGE OF WATER FOR THE PROTECTION OF THE PUBLIC (Q2036675): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Label in wikidata changed) |
(Created claim: summary (P836): FITTING OUT OF NATURAL ENGINEERING AND HYDRAULIC SYSTEM OF THE WATERS COMING FROM CERQUES AND THE ROUTE TAKEN INTO ACCOUNT FOR THE CARRIAGE OF WATER FOR THE PROTECTION OF THE PUBLIC, Adding English summary) |
||
Property / summary | |||
FITTING OUT OF NATURAL ENGINEERING AND HYDRAULIC SYSTEM OF THE WATERS COMING FROM CERQUES AND THE ROUTE TAKEN INTO ACCOUNT FOR THE CARRIAGE OF WATER FOR THE PROTECTION OF THE PUBLIC (English) | |||
Property / summary: FITTING OUT OF NATURAL ENGINEERING AND HYDRAULIC SYSTEM OF THE WATERS COMING FROM CERQUES AND THE ROUTE TAKEN INTO ACCOUNT FOR THE CARRIAGE OF WATER FOR THE PROTECTION OF THE PUBLIC (English) / rank | |||
Normal rank |
Revision as of 09:56, 23 March 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | FITTING OUT OF NATURAL ENGINEERING AND HYDRAULIC SYSTEM OF THE WATERS COMING FROM CERQUES AND THE ROUTE TAKEN INTO ACCOUNT FOR THE CARRIAGE OF WATER FOR THE PROTECTION OF THE PUBLIC |
Project in Italy financed by DG Regio |
Statements
122,072.02 Euro
0 references
244,144.04 Euro
0 references
50.0 percent
0 references
14 October 2016
0 references
31 December 2019
0 references
COMUNE DI ARICCIA
0 references
INTERVENTI DI SISTEMAZIONE CON OPERE DI INGEGNERIA NATURALISTICA E REGIMENTAZIONE IDRAULICA DELLE ACQUE PROVENIENTI DA VIA DELLE CERQUETTE E VIA DELL'UCCELLIERA A TUTELA DELL'INCOLUMITÃ PUBBLICA (Italian)
0 references
FITTING OUT OF NATURAL ENGINEERING AND HYDRAULIC SYSTEM OF THE WATERS COMING FROM CERQUES AND THE ROUTE TAKEN INTO ACCOUNT FOR THE CARRIAGE OF WATER FOR THE PROTECTION OF THE PUBLIC (English)
0 references
Identifiers
D76J17000090006
0 references