DEVELOPMENT OF THE REGIONAL MONITORING SYSTEM (Q2050928): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Label in wikidata changed)
(‎Created claim: summary (P836): DISTRIBUTION SYSTEMS OPERATED BY ABBANOA SPA HAVE BEEN THE SUBJECT OF RECENT LOANS GRANTED BY THE COMPANY ABBANOA. CIPE 27/2015 AND DC N.8 OF 10.04.2014, AIMED AT UPGRADING THE WATER NETWORKS BY REPLACING OLD ONES. THE COMPLETION OF ACTIONS TO CONTAIN WATER LOSSES REQUIRES REPLICATION OF THE ACTIVATION OF AN EXTENSIVE NETWORK OF ACTIVE MONITORING AND CONTROL OF THE OPERATION OF NETWORKS AND INSTALLATIONS, WITH THE AIM OF OPTIMISING THE MANAGEMEN...)
Property / summary
 
DISTRIBUTION SYSTEMS OPERATED BY ABBANOA SPA HAVE BEEN THE SUBJECT OF RECENT LOANS GRANTED BY THE COMPANY ABBANOA. CIPE 27/2015 AND DC N.8 OF 10.04.2014, AIMED AT UPGRADING THE WATER NETWORKS BY REPLACING OLD ONES. THE COMPLETION OF ACTIONS TO CONTAIN WATER LOSSES REQUIRES REPLICATION OF THE ACTIVATION OF AN EXTENSIVE NETWORK OF ACTIVE MONITORING AND CONTROL OF THE OPERATION OF NETWORKS AND INSTALLATIONS, WITH THE AIM OF OPTIMISING THE MANAGEMENT ACTIVITIES AND PRESERVING THE RESULTS ACHIEVED OVER TIME. IT IS PLANNED TO POSITION AT LEAST 1500 REMOTE OUTLYING REGIONS ON A REGIONAL SCALE, EQUIPPED WITH METERS AND TRANSMISSION SYSTEMS CONNECTED WITH THE CENTRAL SUPERVISOR IN USE WITH ABBANOA (ABBANOA), IN ORDER TO CARRY OUT THE MONITORING OF HYDRAULIC QUANTITIES AND REAL-TIME REGULATION OF NETWORK FACILITIES AND EQUIPMENT. (English)
Property / summary: DISTRIBUTION SYSTEMS OPERATED BY ABBANOA SPA HAVE BEEN THE SUBJECT OF RECENT LOANS GRANTED BY THE COMPANY ABBANOA. CIPE 27/2015 AND DC N.8 OF 10.04.2014, AIMED AT UPGRADING THE WATER NETWORKS BY REPLACING OLD ONES. THE COMPLETION OF ACTIONS TO CONTAIN WATER LOSSES REQUIRES REPLICATION OF THE ACTIVATION OF AN EXTENSIVE NETWORK OF ACTIVE MONITORING AND CONTROL OF THE OPERATION OF NETWORKS AND INSTALLATIONS, WITH THE AIM OF OPTIMISING THE MANAGEMENT ACTIVITIES AND PRESERVING THE RESULTS ACHIEVED OVER TIME. IT IS PLANNED TO POSITION AT LEAST 1500 REMOTE OUTLYING REGIONS ON A REGIONAL SCALE, EQUIPPED WITH METERS AND TRANSMISSION SYSTEMS CONNECTED WITH THE CENTRAL SUPERVISOR IN USE WITH ABBANOA (ABBANOA), IN ORDER TO CARRY OUT THE MONITORING OF HYDRAULIC QUANTITIES AND REAL-TIME REGULATION OF NETWORK FACILITIES AND EQUIPMENT. (English) / rank
 
Normal rank

Revision as of 09:48, 23 March 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
DEVELOPMENT OF THE REGIONAL MONITORING SYSTEM
Project in Italy financed by DG Regio

    Statements

    0 references
    2,485,000.0 Euro
    0 references
    4,970,000.0 Euro
    0 references
    50.0 percent
    0 references
    23 March 2017
    0 references
    19 February 2020
    0 references
    ENTE DI GOVERNO DELL'AMBITO DELLA SARDEGNA
    0 references
    0 references
    SISTEMI DI DISTRIBUZIONE GESTITI DA ABBANOA SPA SONO STATI OGGETTO DI RECENTI FINANZIAMENTI ACCORDATI DA DEL. CIPE 27/2015 E DC N.8 DEL 10.04.2014, MIRATI ALLA RIQUALIFICAZIONE DELLE RETI IDRICHE MEDIANTE LA SOSTITUZIONE DELLE CONDOTTE VETUSTE. IL COMPLETAMENTO DELLE AZIONI DI CONTENIMENTO DELLE PERDITE IDRICHE RICHIEDE L¿ATTIVAZIONE DI UNA ESTESA RETE DI MONITORAGGIO E CONTROLLO ATTIVO DEL FUNZIONAMENTO DELLE RETI E DEGLI IMPIANTI, FINALIZZATA ALLA OTTIMIZZAZIONE DELLE ATTIVITà DI GESTIONE E ALLA PRESERVAZIONE NEL TEMPO DEI RISULTATI RAGGIUNTI. SI PREVEDE IL POSIZIONAMENTO DI ALMENO 1500 PERIFERICHE REMOTE SU SCALA REGIONALE, DOTATE DI MISURATORI E SISTEMI DI TRASMISSIONE COLLEGATI CON IL SUPERVISORE CENTRALE GIà IN USO PRESSO ABBANOA SPA, PER LE ATTIVITà DI TELEMISURA DELLE GRANDEZZE IDRAULICHE E REGOLAZIONE IN TEMPO REALE DELLE PRESTAZIONI DEGLI IMPIANTI E DELLE APPARECCHIATURE DISLOCATE IN RETE. (Italian)
    0 references
    DISTRIBUTION SYSTEMS OPERATED BY ABBANOA SPA HAVE BEEN THE SUBJECT OF RECENT LOANS GRANTED BY THE COMPANY ABBANOA. CIPE 27/2015 AND DC N.8 OF 10.04.2014, AIMED AT UPGRADING THE WATER NETWORKS BY REPLACING OLD ONES. THE COMPLETION OF ACTIONS TO CONTAIN WATER LOSSES REQUIRES REPLICATION OF THE ACTIVATION OF AN EXTENSIVE NETWORK OF ACTIVE MONITORING AND CONTROL OF THE OPERATION OF NETWORKS AND INSTALLATIONS, WITH THE AIM OF OPTIMISING THE MANAGEMENT ACTIVITIES AND PRESERVING THE RESULTS ACHIEVED OVER TIME. IT IS PLANNED TO POSITION AT LEAST 1500 REMOTE OUTLYING REGIONS ON A REGIONAL SCALE, EQUIPPED WITH METERS AND TRANSMISSION SYSTEMS CONNECTED WITH THE CENTRAL SUPERVISOR IN USE WITH ABBANOA (ABBANOA), IN ORDER TO CARRY OUT THE MONITORING OF HYDRAULIC QUANTITIES AND REAL-TIME REGULATION OF NETWORK FACILITIES AND EQUIPMENT. (English)
    0 references

    Identifiers