Energy modernisation of the Town Hall of Kőszeg (Q3951345): Difference between revisions
Jump to navigation
Jump to search
(Removed claims) |
(Changed an Item: fix budget) |
||||||||||||||
Property / co-financing rate | |||||||||||||||
48.88 percent
| |||||||||||||||
Property / co-financing rate: 48.88 percent / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
135,348,745.0 forint
| |||||||||||||||
Property / budget: 135,348,745.0 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
382,630.9 Euro
| |||||||||||||||
Property / budget: 382,630.9 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / budget: 382,630.9 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / budget: 382,630.9 Euro / qualifier | |||||||||||||||
point in time: 15 February 2022
| |||||||||||||||
Property / EU contribution | |||||||||||||||
66,158,466.56 forint
| |||||||||||||||
Property / EU contribution: 66,158,466.56 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
187,029.98 Euro
| |||||||||||||||
Property / EU contribution: 187,029.98 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 187,029.98 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / EU contribution: 187,029.98 Euro / qualifier | |||||||||||||||
point in time: 15 February 2022
|
Revision as of 04:13, 15 February 2022
Project Q3951345 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy modernisation of the Town Hall of Kőszeg |
Project Q3951345 in Hungary |
Statements
66,158,466.56 forint
0 references
135,348,745.0 forint
0 references
48.88 percent
0 references
1 April 2019
0 references
31 January 2022
0 references
KŐSZEG VÁROS ÖNKORMÁNYZATA
0 references
A Kőszegi Polgármesteri hivatal épülete több száz éves műemlék épület. Állapota a mai energetikai elvárásoktól messze alulmarad. Az épület falazatai hőszigetelés nélkül, padlószerkezete szintén, valamint födémszerkezete hőszigetelés nélkül épült. A fűtését gázkazán látja el, melyeknek az állapota és kora mindenképpen cserére szorul. HMV villanybojler, probléma mentes, de nagyon drága. A nyílászárók már cserélve lettek. A pályázati kiírás Önkormányzati épületek energetikai korszerűsítése, melynek célja az önkormányzati intézmények hatékonyabb energiahasználatának, racionálisabb energiagazdálkodásának elősegítése. A Kőszegi Polgármesteri Hivatal épület önkormányzati tulajdonban lévő épület, amely korszerűsítésével a fosszilis energiahordozókból származó üvegházhatású gázok (ÜHG) kibocsátásának csökkentését is elérjük. A projekt megvalósítása után az épület korszerű, a mai követelményeknek megfelelő energetikai besorolást kap, a szén-dioxid kibocsátás jelentősen csökken, az épület fenntartási költségei szintén jelentősen csökkennek, valamint nem utolsósorban a gyerekek és a dolgozók komfortérzete jelentősen javul. Az épület Önkormányzati Hivatal 9730, Kőszeg, Jurisich tér 8. hrsz.: 1858. ingatlanon helyezkedik el. Az épület kétszintes, magastetővel épült. Az épület dél nyugati oldalán található a fűtőhelyiség. A használati meleg-vizet villany bojlerekkel állítják elő. A nyílászárók fából készültek. A projekt tervezett eredményei között szerepel a jelentős mértékű tüzelőanyag és energia megtakarítás realizálása, melyből kiindulva releváns költségmegtakarítás elérése, ezáltal az üzemeltetés során az intézmény fenntartási költségeinek optimalizálása. Az új technológia beépítéséből és az épület állagjavításából adódóan üzemeltetési és karbantartási költségek optimalizálása várható, mellyel elérjük az ingatlan élettartamának növelése, az ingatlan esztétikai megjelenésének javulását és a településkép pozitív változását. A projekt keretében létrehozandó infrastruktúra, a fejlesztéssel lehetővé tett tevékenységek/szolgáltatások leírása és a projekt által megvalósítandó fejlesztések műszaki tartalmának rövid összefoglalása. Az épület akadálymentes megközelíthetősége, valamint az épületen belüli akadálymentes közlekedés már megoldott. A fejlesztés egyik lépcsője az épület hőszigetelésének kivitelezése, homlokzat, födémszerkezet tekintetében. A fűtési rendszer korszerűsítése is megtörténik, hőszivattyú telepítéssel radiátor szelepek cseréjével. A használati meleg-víz ellátás berendezései nem változnak, viszont működésük napelemmel racionalizálódik. A projekt műszaki-tartalmi előkészítése keretében, az 1. mérföldkő során 2018.02.02-ig elkészül a műszaki tervdokumentáció véglegesítése. A 2. számú mérföldkő eléréséig megkezdődik a közbeszerzési dokumentációk előkészítése és a közbeszerzési eljárások lebonyolítása. A 3-4. számú mérföldkő teljesítése során megfelelő műszaki ellenőrzés mellett elindul a hivatal épületének több rétű energetikai korszerűsítése, majd a 4. mérföldkő végére eléri 100%-os készültségi fokot. A 5. számú mérföldkő a projekt zárása a szükséges adminisztrációs teendők elvégzésével. A projekt végrehajtásánál 3 különböző szervezet kerül bemutatásra 2 tevékenység alapján. A menedzsment feladatokat a Vas Megyei Önkormányzati Hivatal munkatársain keresztül látja el. A projekt fizikai megvalósulását a projekt és konzorciumvezető szervezet, mely tulajdonosa a fejlesztéssel érintett épületnek és koordinálja a projekt fizikai megvalósulását, kiemelve az infrastruktúra fejlesztést. A fejlesztendő épület üzemeltetését a tulajdonos látja el. A felújított épület új feladatot nem kap, az eddig ott folytatott tevékenységeknek biztosít továbbra is helyszínt. A fejlesztéssel elért megtakarítás jelentősen megkönnyíti a fenntartóra rótt eddigi költségvetési kötelezettségeket, de az továbbra is saját költségvetéséből biztosítja, mely normatív támogatásból és egyéb bevételekből áll. A fejlesztés költsége 118 233 260 Ft,-, amely 100%-os Európai uniós társfinanszírozással valósul meg. Az előleg-igénylésére a projektgazda a támogatási szerződés megkötése után benyújtja a szükséges dokumentumokat a Közreműködő Szervezet részére. A tervezett hőszivattyús rendszer megfelel az „Önkormányzati épületek energetikai korszerűsítése” című, TOP-3.2.1-16 számú felhívás, 3.4.1.1 „Műszaki elvárások” 51-es pontjában található műszaki feltételrendszernek. Tájékoztatási, képzési anyag kidolgozása, képzés tartása: Az energetikai beruházással érintett épület(ek) állandó használóit oktatásban részesítjük az alkalmazott megoldásokról, a helyes üzemeltetés szabályairól, valamint a beruházás környezeti hozadékairól, melyet a kivitelező által biztosított az épületüzemeltetésben vagy épületenergetikában illetve energiamenedzsmentben jártas szakértő fog elvégezni. A pályázatban külön költségként nem jelenik meg. A képzési anyagot, későbbi, önálló tanulásra alkalmas formában, legalább az adott intézményen belül elérhetővé tesszük. (Hungarian)
0 references
The building of the Mayor’s Office of Kőszeg is a monumental building that is hundreds of years old. His condition is far below today’s energy expectations. The masonry of the building was built without thermal insulation, the floor structure and the slab structure were built without thermal insulation. The heating is supplied by a gas boiler, the condition and age of which must be changed. HMV electric boiler, problem-free, but very expensive. Doors and windows have already been changed. The invitation to tender is the energy modernisation of municipal buildings, which aims to promote the more efficient use of energy and rational energy management of municipal institutions. The Mayor’s Office of Kőszeg is a building owned by the municipality, the modernisation of which also achieves the reduction of greenhouse gas (GHG) emissions from fossil fuels. After the implementation of the project, the building will receive a state-of-the-art energy classification in line with today’s requirements, CO2 emissions will be significantly reduced, the maintenance costs of the building will also be significantly reduced and, not least, the comfort of children and workers will be significantly improved. Building Municipality Office 9730, Kőszeg, Jurisich tér 8. Hr.: The property is located in 1858. The building was built on two floors with a high roof. The heating room is located on the south west side of the building. Domestic hot water is produced with electric boilers. Doors and windows are made of wood. The planned results of the project include the realisation of significant fuel and energy savings, from which to achieve relevant cost savings, thereby optimising the maintenance costs of the institution during operation. Due to the integration of the new technology and the renovation of the building, it is expected to optimise the operating and maintenance costs, thereby increasing the lifespan of the property, improving the aesthetic appearance of the property and the positive change in the settlement landscape. A description of the infrastructure to be created under the project, the activities/services enabled by the development and a brief summary of the technical content of the developments to be carried out by the project. The accessibility of the building and the accessibility within the building are already provided. One of the steps of the development is the construction of the thermal insulation of the building, facade and slab structure. The heating system is also upgraded with heat pump installation by replacing radiator valves. The domestic hot-water supply facilities do not change, but their operation is rationalised by solar element. As part of the technical-content preparation of the project, during milestone 1, the finalisation of the technical design documentation will be completed by 02/02/2018. By the time milestone 2 is reached, the preparation of the procurement documents and the implementation of the procurement procedures will begin. During the completion of milestone 3-4, the building of the office will be upgraded with a number of meadows and 100 % of the state of preparedness at the end of the 4th milestone, subject to proper technical control. Milestone 5 is the closing of the project by carrying out the necessary administrative tasks. During the implementation of the project 3 different organisations will be presented on the basis of 2 activities. It performs management tasks through the employees of the Vas County Local Government Office. The physical realisation of the project is the project and consortium management organisation, which owns the building concerned by the development and coordinates the physical realisation of the project, highlighting the infrastructure development. The owner is responsible for the operation of the building to be developed. The refurbished building will not be given a new task and will continue to accommodate the activities carried out there so far. The savings achieved by the development significantly facilitate the budgetary obligations imposed on the maintainer so far, but it will continue to be provided by its own budget, which consists of normative support and other revenue. The cost of the development is 118 233 260 HUF, which is realised with 100 % EU co-financing. In order to apply for an advance, the project promoter shall submit the necessary documents to the Intermediate Body after the conclusion of the grant contract. The planned heat pump system complies with the technical conditionality set out in point 51 “Technical requirements” of call TOP-3.2.1-16 “Energy modernisation of self-government buildings”. Development of information and training material and training: The permanent users of the building(s) affected by the energy investment will be trained on the solutions applied, the rules of proper operation and the environmental benefits of the investment, which will be carried out by an expert experienced in building management or energy ... (English)
9 February 2022
0 references
Le bâtiment du bureau du maire de Kőszeg est un bâtiment monumental qui a des centaines d’années. Son état est bien en deçà des attentes énergétiques d’aujourd’hui. La maçonnerie du bâtiment a été construite sans isolation thermique, la structure du sol et la structure de dalle ont été construites sans isolation thermique. Le chauffage est alimenté par une chaudière à gaz dont l’état et l’âge doivent être modifiés. Chaudière électrique HMV, sans problème, mais très cher. Les portes et les fenêtres ont déjà été changées. L’appel d’offres est la modernisation énergétique des bâtiments municipaux, qui vise à promouvoir une utilisation plus efficace de l’énergie et une gestion rationnelle de l’énergie des institutions municipales. Le bureau du maire de Kőszeg est un bâtiment appartenant à la municipalité, dont la modernisation permet également de réduire les émissions de gaz à effet de serre (GES) provenant des combustibles fossiles. Après la mise en œuvre du projet, le bâtiment recevra une classification énergétique de pointe conforme aux exigences actuelles, les émissions de CO2 seront considérablement réduites, les coûts d’entretien du bâtiment seront également considérablement réduits et, surtout, le confort des enfants et des travailleurs sera considérablement amélioré. Bâtiment Bureau municipal 9730, Kőszeg, Jurisich tér 8. Hr.: La propriété est située en 1858. Le bâtiment a été construit sur deux étages avec un toit haut. La salle de chauffage est située sur le côté sud-ouest du bâtiment. L’eau chaude domestique est produite avec des chaudières électriques. Les portes et les fenêtres sont en bois. Les résultats prévus du projet comprennent la réalisation d’importantes économies de carburant et d’énergie, ce qui permettra de réaliser des économies de coûts pertinentes, optimisant ainsi les coûts d’entretien de l’établissement pendant l’exploitation. En raison de l’intégration de la nouvelle technologie et de la rénovation du bâtiment, il est prévu d’optimiser les coûts d’exploitation et d’entretien, augmentant ainsi la durée de vie de la propriété, améliorant l’aspect esthétique de la propriété et le changement positif dans le paysage des colonies. Une description de l’infrastructure à créer dans le cadre du projet, les activités/services rendus possibles par le développement et un bref résumé du contenu technique des développements à réaliser par le projet. L’accessibilité du bâtiment et l’accessibilité à l’intérieur du bâtiment sont déjà prévues. L’une des étapes du développement est la construction de l’isolation thermique du bâtiment, de la façade et de la structure de dalle. Le système de chauffage est également modernisé avec l’installation d’une pompe à chaleur en remplaçant les vannes de radiateur. Les installations domestiques d’alimentation en eau chaude ne changent pas, mais leur fonctionnement est rationalisé par l’élément solaire. Dans le cadre de la préparation du contenu technique du projet, au cours de l’étape 1, la finalisation de la documentation de conception technique sera achevée d’ici le 02/02/2018. D’ici à ce que l’étape 2 soit atteinte, la préparation des documents de marché et la mise en œuvre des procédures de passation de marchés commenceront. Au cours de l’étape 3-4, le bâtiment du bureau sera rénové avec un certain nombre de prairies et 100 % de l’état de préparation à la fin de la 4e étape, sous réserve d’un contrôle technique approprié. L’étape 5 est la clôture du projet par l’exécution des tâches administratives nécessaires. Au cours de la mise en œuvre du projet, trois organisations différentes seront présentées sur la base de 2 activités. Il effectue des tâches de gestion par l’intermédiaire des employés du bureau local du comté de Vas. La réalisation physique du projet est l’organisation de gestion du projet et du consortium, qui possède le bâtiment concerné par le développement et coordonne la réalisation physique du projet, en mettant en évidence le développement de l’infrastructure. Le propriétaire est responsable de l’exploitation du bâtiment à développer. Le bâtiment rénové ne sera pas chargé d’une nouvelle tâche et continuera à accueillir les activités qui y ont été menées jusqu’à présent. Les économies réalisées grâce au développement facilitent considérablement les obligations budgétaires imposées jusqu’à présent au responsable du maintien, mais elles continueront d’être financées par son propre budget, qui consiste en un soutien normatif et d’autres recettes. Le coût du développement s’élève à 118 233 260 HUF, qui est réalisé avec un cofinancement de 100 % par l’UE. Afin de demander une avance, le promoteur de projet soumet les documents nécessaires à l’organisme intermédiaire après la conclusion du contrat de subvention. Le système de pompe à chaleur prévu est conforme aux conditions techniques énoncées au point 51 «Exigences techniques» de l’appel TOP-3.2.1-16 «Modification énergétique des bâtiments autonomes». Élaboration de matériel d’information et de fo... (French)
10 February 2022
0 references
Kőszeg, Vas
0 references
Identifiers
TOP-3.2.1-16-VS1-2017-00007
0 references