Energy development of the Mayor’s Office of Sarkadkeresztúr (Q3951022): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: fix budget) |
(Removed claims) |
||||||||||||||
Property / co-financing rate | |||||||||||||||
| |||||||||||||||
Property / co-financing rate: 100.0 percent / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 21,091,328.0 forint / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 59,625.18 Euro / rank | |||||||||||||||
Property / budget: 59,625.18 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 59,625.18 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 21,091,328.0 forint / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 59,625.18 Euro / rank | |||||||||||||||
Property / EU contribution: 59,625.18 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 59,625.18 Euro / qualifier | |||||||||||||||
|
Revision as of 04:07, 15 February 2022
Project Q3951022 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy development of the Mayor’s Office of Sarkadkeresztúr |
Project Q3951022 in Hungary |
Statements
1 February 2018
0 references
28 February 2021
0 references
SARKADKERESZTÚR KÖZSÉG ÖNKORMÁNYZATA
0 references
A projekt keretében a Sarkadkeresztúri Polgármesteri Hivatal épülete kerül energetikai megújításra. Megvalósuló tevékenységek: - Homlokzati falak szigetelése: 254,2m2 - 15cm EPS, - Födémszigetelés: 314,05m2 - 20cm Kőzetgyapot, - Nyílászárók elhelyezése: 41,6m2 - 3rtg üveg+7kamra PVC , - Fűtési és/vagy HMV rendszerek korszerűsítése, - Mozgáskorlátozott WC és feljáró. A megvalósítás helyszíne, az 1509 lakosú Sarkadkeresztúr , a 290/2014. (XI. 26.) Korm. rendelet szerinti Komplex programmal fejlesztendő Sarkadi járásban helyezkedik el. A projektgazda, mint az épület 100%-os tulajdonosának, feladata és kötelessége pénzügyi lehetőségeihez mérten a tulajdonába tartozó ingatlanok fejlesztése. A tervezett fejlesztési projekt hozzájárul a megyei területfejlesztési programban "Természeti és épített értékek, a szellemi és kulturális örökség megóvása, alkotó innovatív fenntartható továbbfejlesztése” stratégiai cél alábbi részcéljainak teljesüléséhez: • energiafelhasználás hatékonyságának javítása, • energiafogyasztás csökkentése, • széndioxid kibocsátás csökkenése. (Hungarian)
0 references
As part of the project, the building of the Mayor’s Office of Sarkadkeresztúr will be refurbished. Activities carried out: — Insulation of facade walls: 254.2 m² — 15 cm EPS, — Slab insulation: 314.05 m² — 20 cm Shoot wool, — Placement of opening closures: 41.6 m² — 3rtg glass+ 7chamber PVC, — Modernisation of heating and/or HMV systems, — Toilets and hoods with reduced mobility. The site of implementation, the 1509 inhabitants of Sarkadkeresztúr, 290/2014. (XI. 26.) is located in the district of Sarkadi, which is to be developed with a complex programme in accordance with Government Decree No 26/2001. The project promoter, as the 100 % owner of the building, has the task and duty to develop the properties he owns in accordance with his financial capacity. The planned development project will contribute to the following sub-targets of the strategic goal “Conservation of natural and built values, preservation of intangible and cultural heritage, creative sustainable development” in the county regional development programme: • improving the efficiency of energy use, • reducing energy consumption, • reducing CO2 emissions. (English)
9 February 2022
0 references
Dans le cadre du projet, le bâtiment du bureau du maire de Sarkadkeresztúr sera rénové. Activités réalisées: — Isolation des murs de façade: 254,2 m² — 15 cm EPS, — Isolation de dalles: 314,05 m² — 20 cm Laine de tir, — Placement des fermetures d’ouverture: 41,6 m² — 3rtg verre + 7 chambres PVC, — Modernisation des systèmes de chauffage et/ou HMV, — Toilettes et hottes à mobilité réduite. Le site de mise en œuvre, les 1509 habitants de Sarkadkeresztúr, 290/2014. (XI. 26.) est situé dans le district de Sarkadi, qui doit être développé avec un programme complexe conformément au décret gouvernemental no 26/2001. Le promoteur du projet, en tant que propriétaire à 100 % du bâtiment, a la tâche et le devoir de développer les propriétés qu’il possède en fonction de sa capacité financière. Le projet de développement prévu contribuera aux sous-objectifs suivants de l’objectif stratégique «Conservation des valeurs naturelles et bâties, préservation du patrimoine immatériel et culturel, développement créatif durable» du programme de développement régional du comté: • améliorer l’efficacité de la consommation d’énergie, • réduire la consommation d’énergie, • réduire les émissions de CO2. (French)
10 February 2022
0 references
Sarkadkeresztúr, Békés
0 references
Identifiers
TOP-3.2.1-16-BS1-2017-00065
0 references