Heves Urban Kindergarten and Bölcsőde Public Education Institution Development of Arany János út Kindergarten and Bölcsőde infrastructural development (Q3947696): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: fix budget) |
(Removed claims) |
||||||||||||||
Property / co-financing rate | |||||||||||||||
| |||||||||||||||
Property / co-financing rate: 100.0 percent / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 147,829,890.0 forint / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 417,915.1 Euro / rank | |||||||||||||||
Property / budget: 417,915.1 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 417,915.1 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 147,829,890.0 forint / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 417,915.1 Euro / rank | |||||||||||||||
Property / EU contribution: 417,915.1 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 417,915.1 Euro / qualifier | |||||||||||||||
|
Revision as of 02:55, 15 February 2022
Project Q3947696 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Heves Urban Kindergarten and Bölcsőde Public Education Institution Development of Arany János út Kindergarten and Bölcsőde infrastructural development |
Project Q3947696 in Hungary |
Statements
1 July 2017
0 references
31 May 2019
0 references
HEVES VÁROS ÖNKORMÁNYZATA
0 references
a) projekt célja A fejlesztés konkrét célja: Arany János úti Tagóvodának és a Bölcsőde Tagintézménynek helyet adó épületrész (cím: 3360 Heves, Arany János út 36/B.) belső korszerűsítése, felújítása, valamint az elhasználódott eszközök cseréje és új korszerű játékok beszerzése. b) a projekt szakmai-műszaki tartalma a választott önállóan támogatható és önállóan nem támogatható tevékenységek körének a bemutatásával együtt Önállóan támogatható tevékenységek: • Intézmény/szolgáltatás infrastrukturális fejlesztése, ezen belül az Arany János úti Tagóvodának és a Bölcsőde Tagintézménynek helyet adó épületrész belső korszerűsítése, felújítása. • Eszközbeszerzéshezhez kapcsolódóan udvari játékok beszerzése, az elhasználódott eszközök cseréje és új korszerű játékok beszerzése. Önállóan nem támogatható, kötelezően megvalósítandó tevékenységek: • akadálymentesítés • nyilvánosság biztosítása (kedvezményezet honlapján tájékoztatás megjelenítése, C típusú tájékoztató tábla kihelyezése mely a fenntartási időszak alatt is a megvalósítás helyszínén marad, fotódokumentáció készítése, záró sajtóközlemény kiküldése és TÉRKÉPTÉR feltöltése) • A szórt azbeszt mentesítése és az energiahatékonysági intézkedés nem releváns. A tervezett beruházás elsődleges célja, hogy a 2015-ben homlokzati felületeiben, és homlokzati nyílászáróiban megújult épület belső helyiségei is felújításra kerüljenek. Az épület valamennyi belső helyisége felújításra kerül a csoportszobák, öltözőik és mosdók, az irodai helyiségek, valamint raktárhelyiségek a főzőkonyha helyiségeinek kivételével. Az épületben többféle kerámia és cementlap burkolat is megtalálhatók, melyek nagy része gyakorlatilag az épület építése óta nem is került felújításra. Ezek a burkolatok az idők során több helyen megsérültek, elszíneződtek. A tervezett felújítás során valamennyi helyiségben ezek a burkolatok az aljzatbeton felbontásával együtt eltávolításra kerülnek. Új aljzat készítése és felületkiegyenlítés útján egységes megjelenésű új csúszásmentes kerámia burkolat készül. A PVC burkolatok feltételezhetően szintén az épülettel egykorú szerkezetek. Több helyen sérülések felpúposodások, bemélyedések figyelhetők meg. Ezeket a burkolatokat fel kel szedni, majd a megfelelő felületkiegyenlítést követően új linóleum burkolatot kell leteríteni. A vizes helyiségekben lévő csempeburkolatot is lebontjuk, és új burkolat készül a vonatkozó jogszabályoknak, szabványoknak megfelelő magasságig. Valamennyi helyiség falai és mennyezete új festést kap a sérülések gletteléssel kerülnek kijavításra. Azokban a helyiségekben ahol csempeburkolat nem készül a falra, mosható festés készül 1,50 m magasságig. A mosdókban, WC-kben új szaniterek kerülnek elhelyezésre. Ehhez kapcsolódóan az intézmény ivóvíz hálózata és csatornahálózata is felújításra, lecserélésre kerül. Az udvaron jelenleg hiányosak a telepített játékok, mellyel a gyermekek és a szülők számára is egy színesebb, izgalmasabb és játékos tevékenységekre serkentő ingergazdagabb környezetet szeretnénk teremteni, így a játszótér is a mai elvárásoknak megfelelő játékokkal és esésvédő burkolatokkal megújításra kerül. Az épület akadálymentes megközelítése jelenleg nem biztosított. Az épület földszinti padlóvonala a környező terepszinthez képest 0,45-0,55 m magasságban van. Jelenleg ezt a szintkülönbséget bordázott felületű rámpák hidalják át, azonban ezek lejtése meghaladja az akadálymentes közlekedést biztosító 5%-ot. Az épületnek az óvoda-bölcsőde funkcióhoz kapcsolódóan a dél-keleti homlokzatánál lévő főbejárata előtt a meglévő rámpa teljesen, a bejárat előtti pihenő részlegesen visszabontásra kerül, és max. 5% -os lejtéssel új rámpa készül az épület hossztengelyére merőlegesen 1,20 m szabad szélességgel. c) a felhívás 3.2 pontjában előírt feltételek teljesülése A projekt műszaki-szakmai tartalmával és a megvalósítással kapcsolatos elvárások: a) A projektre vonatkozó környezetvédelmi és esélyegyenlőségi jogszabályokat betartásra fognak kerülni, a projekt által érintett területen a védett természeti és kulturális értékeket megőrzésre, a fennálló vagy a beruházás során keletkezett környezeti károk és az esélyegyenlőség szempontjából jogszabályba ütköző nem-megfelelőségek legkésőbb a projekt megvalósítása során megszüntetésre kerülnek. b) A támogatást igénylő vállalja, hogy a fejlesztéshez kapcsolódó nyilvános eseményeken, kommunikációjában és viselkedésében esélytudatosságot fejez ki. c) Támogatást igénylő nyilatkozik, hogy a projekt valamennyi környezeti, esélyegyenlőségi jogszabálynak megfelel, és az energiafelhasználásra, a projekt környezetének ökológiai állapotára, a vizek állapotára és a klímaváltozásra hatása nincs. d) A támogatást igénylő figyelembe veszi és érvényesíti az egyetemes tervezés elveit, azaz a nők és férfiak igényeit, az idősek, a fogyatékosok és a gyermekek igényeit. e) Projekt keretében megvalósul a projektarányos akadálymentesítés. f) Támogatást igénylő rendelkezik helyi esélyegyenlőségi programmal. g) Ha a támogatás (Hungarian)
0 references
a) Purpose of the project The specific objective of the development is: Part of the building that hosts the member school of Arany János út and the member institution of Bölcsőde (address: 3360 Heves, Arany János út 36/B.) internal modernisation, renovation, replacement of end-of-life equipment and acquisition of new modern toys. B) the technical and technical content of the project, together with the presentation of the selected self-eligible and non-eligible activities, are self-eligible activities: • The infrastructural development of an institution/service, including the internal modernisation and renovation of the building section hosting the Arany János street Membership and the Bölcsőde member institution. • Acquisition of court games, replacement of end-of-life equipment and the purchase of new modern toys in connection with the purchase of equipment. Activities that are not eligible independently and are to be carried out on a mandatory basis: • accessibility • publicity (distribution of information on the beneficiary’s website, displaying a type C information board which remains at the site of implementation during the maintenance period, preparation of photo documentation, sending a final press release and uploading TREKÉPTÉR) • Exemption of scattered asbestos and the energy efficiency measure are not relevant. The primary objective of the planned investment is to renovate the interiors of the building, which was renewed in 2015 in its facade surfaces and facade doors. All interiors of the building are refurbished with the exception of group rooms, dressing rooms and toilets, office rooms and storage rooms, with the exception of the rooms in the kitchen. The building has several ceramic and cement tiles coverings, most of which have not been renovated since the building was built. These hulls have been damaged and discoloured in several places over time. During the planned renovation, these coverings are removed in all rooms together with the concrete resolution of the substrate. A new non-slip ceramic casing is made by making a new substrate and levelling the surface. PVC casings are also assumed to be of the same age as the building. In several places, lesions and recesses can be observed. These coverings should be picked up and a new linoleum linoleum covering must be rolled down once the surface has been properly levelled. The tile coverings in wet rooms are also demolished and new tiles are made up to a height in accordance with the relevant legislation and standards. The walls and ceilings of each room will be painted with new staining, the injuries will be repaired by gletting. In rooms where tile cladding is not made on the wall, washable painting is made up to 1.50 m height. New sanitary facilities are installed in the toilets and toilets. In connection with this, the drinking water and sewerage network of the institution will be refurbished and replaced. The installed games in the yard are currently incomplete, with which we want to create a richer environment for children and parents to create a more colourful, exciting and playful environment, so the playground will be renewed with toys and fall protection coverings that meet today’s expectations. The barrier-free access to the building is currently not ensured. The ground floor of the building is 0.45-0.55 m above the surrounding terrain. At present, this level difference is bridged by ramps with ribbed surfaces, but their slope exceeds 5 % for barrier-free traffic. In front of the main entrance to the south-east facade of the building, in connection with the kindergarten-cradle function, the existing ramp is partially retracted, and with a slope of up to 5 %, a new ramp is prepared at right angles to the longitudinal axis of the building with a free width of 1.20 m. C) Compliance with the conditions set out in point 3.2 of the call The technical-professional content of the project and its implementation: a) The environmental and equal opportunities legislation relating to the project will be complied with, the protected natural and cultural values shall be preserved in the area affected by the project, and any non-conformities that are in breach of the legislation from the point of view of the environmental damage existing or resulting from the investment and the non-compliance with the law will be eliminated at the latest during the implementation of the project. b) The applicant undertakes to express a sense of opportunity in the public events, communication and behaviour related to the development. c) The applicant shall declare a statement, that the project complies with all environmental and equal opportunities legislation and that it has no impact on energy use, environmental status of the project environment, water status and climate change. d) The applicant for support takes into account and enforces the principles of universal planning, i.e. the needs of women and men, the needs of the elderly, the disabled and... (English)
9 February 2022
0 references
a) Objet du projet L’objectif spécifique du développement est: Partie du bâtiment qui accueille l’école membre d’Arany János út et l’institution membre de bölcsőde (adresse: 3360 Heves, Arany János út 36/B.) modernisation interne, rénovation, remplacement du matériel en fin de vie et acquisition de nouveaux jouets modernes. B) le contenu technique et technique du projet, ainsi que la présentation des activités auto-éligibles et non éligibles sélectionnées, sont des activités auto-éligibles: • Le développement des infrastructures d’une institution/service, y compris la modernisation et la rénovation internes de la section du bâtiment abritant l’adhésion de la rue Arany János et l’institution membre de la bölcsőde. • Acquisition de jeux de terrain, remplacement d’équipements en fin de vie et achat de nouveaux jouets modernes en relation avec l’achat d’équipements. Les activités qui ne sont pas éligibles de manière indépendante et qui doivent être exercées sur une base obligatoire: • accessibilité • publicité (distribution d’informations sur le site web du bénéficiaire, affichage d’un tableau d’information de type C qui reste sur le site de mise en œuvre pendant la période de maintenance, préparation de la documentation photographique, envoi d’un communiqué de presse final et téléchargement de TREKÉPTÉR) • L’exemption de l’amiante dispersé et de la mesure d’efficacité énergétique n’est pas pertinente. L’objectif premier de l’investissement prévu est de rénover l’intérieur du bâtiment, qui a été renouvelé en 2015 dans ses façades et portes de façade. Tous les intérieurs du bâtiment sont rénovés à l’exception des chambres de groupe, des vestiaires et des toilettes, des bureaux et des salles de stockage, à l’exception des pièces de la cuisine. Le bâtiment comporte plusieurs revêtements de céramique et de ciment, dont la plupart n’ont pas été rénovés depuis la construction du bâtiment. Ces coques ont été endommagées et décolorées à plusieurs endroits au fil du temps. Lors de la rénovation prévue, ces revêtements sont enlevés dans toutes les pièces ainsi que la résolution concrète du substrat. Un nouveau boîtier en céramique antidérapante est fabriqué en faisant un nouveau substrat et en nivisant la surface. Les boyaux en PVC sont également supposés avoir le même âge que le bâtiment. À plusieurs endroits, on peut observer des lésions et des recoins. Ces revêtements doivent être ramassés et un nouveau revêtement linoléum linoléum doit être roulé une fois que la surface a été correctement nivelée. Les revêtements de tuiles dans les salles humides sont également démolis et les carreaux neufs sont confectionnés jusqu’à une hauteur conforme à la législation et aux normes applicables. Les murs et les plafonds de chaque pièce seront peints avec de nouvelles taches, les blessures seront réparées par Gletting. Dans les chambres où le revêtement de carrelage n’est pas fait sur le mur, la peinture lavable est faite jusqu’à 1,50 m de hauteur. De nouvelles installations sanitaires sont installées dans les toilettes et les toilettes. À cet égard, le réseau d’eau potable et d’assainissement de l’institution sera remis en état et remplacé. Les jeux installés dans la cour sont actuellement incomplets, avec lesquels nous voulons créer un environnement plus riche pour les enfants et les parents afin de créer un environnement plus coloré, excitant et ludique, de sorte que le terrain de jeu sera renouvelé avec des jouets et des couvertures de protection contre les chutes qui répondent aux attentes d’aujourd’hui. L’accès sans obstacles au bâtiment n’est actuellement pas assuré. Le rez-de-chaussée du bâtiment se trouve à 0,45-0,55 m au-dessus du terrain environnant. À l’heure actuelle, cette différence de niveau est comblée par des rampes à surfaces nervurées, mais leur pente dépasse 5 % pour la circulation sans obstacle. En face de l’entrée principale de la façade sud-est du bâtiment, en liaison avec la fonction de jardin d’enfants, la rampe existante est partiellement rentrée, et avec une pente allant jusqu’à 5 %, une nouvelle rampe est préparée à angle droit par rapport à l’axe longitudinal du bâtiment avec une largeur libre de 1,20 m. C) Respect des conditions énoncées au point 3.2 de l’appel Le contenu technique et professionnel du projet et sa mise en œuvre: a) La législation relative à l’environnement et à l’égalité des chances relative au projet sera respectée, les valeurs naturelles et culturelles protégées seront préservées dans la zone touchée par le projet, et toute non-conformité contraire à la législation du point de vue des dommages environnementaux existants ou résultant de l’investissement et le non-respect de la loi seront éliminés au plus tard lors de la mise en œuvre du projet. b) Le demandeur s’engage à exprimer un sentiment d’opportunité dans les manifestations publiques, communication et comportement liés au développement. c) Le demandeur déclare que le projet est conforme à la législation sur l’enviro... (French)
10 February 2022
0 references
Heves, Heves
0 references
Identifiers
TOP-1.4.1-15-HE1-2016-00018
0 references