Building energy development of resting houses at SZSZBMK’s Fehérgyarmat site (Q3943746): Difference between revisions
Jump to navigation
Jump to search
(Removed claims) |
(Changed an Item: fix budget) |
||||||||||||||
Property / co-financing rate | |||||||||||||||
89.0 percent
| |||||||||||||||
Property / co-financing rate: 89.0 percent / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
126,295,048.0 forint
| |||||||||||||||
Property / budget: 126,295,048.0 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
357,036.1 Euro
| |||||||||||||||
Property / budget: 357,036.1 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / budget: 357,036.1 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / budget: 357,036.1 Euro / qualifier | |||||||||||||||
point in time: 15 February 2022
| |||||||||||||||
Property / EU contribution | |||||||||||||||
112,402,592.72 forint
| |||||||||||||||
Property / EU contribution: 112,402,592.72 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
317,762.13 Euro
| |||||||||||||||
Property / EU contribution: 317,762.13 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 317,762.13 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / EU contribution: 317,762.13 Euro / qualifier | |||||||||||||||
point in time: 15 February 2022
|
Revision as of 02:07, 15 February 2022
Project Q3943746 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Building energy development of resting houses at SZSZBMK’s Fehérgyarmat site |
Project Q3943746 in Hungary |
Statements
112,402,592.72 forint
0 references
126,295,048.0 forint
0 references
89.0 percent
0 references
1 August 2018
0 references
31 March 2019
0 references
Szabolcs-Szatmár-Bereg Megyei Kórházak és Egyetemi Oktatókórház
0 references
A „Pihenőházak épületenergetikai fejlesztése az SZSZBMK Fehérgyarmati telephelyén” című projektjavaslat keretében, a támogatást igénylő a vonatkozó KEHOP-5.2.10 kódszámú konstrukcióhoz készült Felhívás 3.6.2. pontjában foglaltakkal összhangban, 1 telephelyen, 3 db, a 173/2003. (X. 28.) Korm. rendelet 2.számú melléklet VI. A pihenőház minősítési követelményei szakaszában foglalt előírásoknak megfelelő épületen valósít meg épületenergetikai fejlesztéseket. Az épületek elavult hőtechnikai adottságainak javítása és az energiafelhasználás csökkentése érdekében megvalósuló épített infrastruktúra beruházási fejlesztések a következők: - 1. sz. projektelem (PE1): Nővérszálló I. (4900 Fehérgyarmat, Kossuth tér 43. szám alatti nővérszálló épület. [Hrsz.: 804/2 ]) - c.ca.: 450 m2 fűtött alapterületű, földszint + 2 szintes - 2. sz. projektelem (PE2): Nővérszálló II. (4900 Fehérgyarmat, Kossuth tér 45. szám alatti nővérszálló épület. [Hrsz.: 804/2 ]) - c.ca.: 429 m2 fűtött alapterületű, földszint + 2 szintes - 3. sz. projektelem (PE3): Nővérszálló III: (4900 Fehérgyarmat, Kossuth tér 47. szám alatti nővérszálló épület. [Hrsz.: 804/2 ]) - c.ca.: 466 m2 fűtött alapterületű, földszint + 2 szintes. Az említett épületeken külső hőszigetelés és külső nyílászáró cserére kerül sor, a TNM. rendelet szerint elvárt minőségben. A beruházást követően jelentős energia megtakarítást eredményez az intézmény számára. A fenti kivitelezési projektelemek előkészítéseként - a 3 db létesítmény épületenergetikai célú felújításához szükséges műszaki előkészítési tevékenység (műszaki tervek, épületenergetikai tanúsítványok, számítások) külső szolgáltató általi teljesítése, továbbá - a felújításhoz kapcsolódó feltételes közbeszerzési eljárások (1 db) 1 fő közbeszerzési tanácsadó (igénybe vett szolgáltatás) általi lefolytatása történik. Az épített infrastruktúra beruházáshoz kapcsolódó kivitelezési tevékenységekkel összefüggésben, továbbá - a műszaki ellenőri tevékenység, illetve - a kivitelezést követően szükséges tanúsítványok elkészítésének és számítások elvégzésének feladatát külső szolgáltató teljesíti. A projekt megvalósításának megkezdésétől a projektmenedzsment tevékenységek ellátása folyamatos. A projektben - 1 fő projektmenedzser (7 év releváns munkatapasztalat), - 1 fő pénzügyi vezető (7 év releváns munkatapasztalat) és - 1 fő műszaki szakértő (4 év releváns munkatapasztalat) teljesít feladatokat. A támogatás igénybevételéhez kapcsolódó tájékoztatás, nyilvánosság biztosítása tevékenységek ellátása, a projekt megvalósítása során folyamatos, a „KTK 2020” Útmutató arculati és tartalmi előírásaival összhangban. A projekt megvalósításának tervezett időszaka: 2018.03.01-2018.10.31. (8 hónap). A projekt költségigénye: bruttó 126.295.556.- Ft. (Hungarian)
0 references
In the framework of the project proposal entitled “Building energy development of rest houses at the Fehérgyarmat site of SZSZBMK”, the applicant for aid, in accordance with the provisions of point 3.6.2 of the call for project No KEHOP-5.2.10, on 1 site, 3, 173/2003. Section VI of Annex 2 to Government Decree No 2 of 28 October 2004 Implement building energy improvements on a building meeting the requirements of the recreation house qualification requirements. Investment improvements in built infrastructure to improve the outdated thermal equipment of buildings and reduce energy use are: Project element No 1 (PE1): Nurses‘hotel I. (4900 Fehérgyarmat, Kossuth square 43, nurses’ hotel building). [Response: 804/2]) — c.ca.: 450 m² heated ground floor + 2 levels — project element 2 (PE2): Nurses’ hostel II. (4900 Fehérgyarmat, Kossuth square 45 nurses’ hotel building. [Response: 804/2]) — c.ca.: 429 m² heated ground floor + 2 levels — project element No. 3 (PE3): Nurses Hotel III: (4900 Fehérgyarmat, Kossuth square 47 nurses’ hotel building. [Response: 804/2]) — c.ca.: 466 m² heated ground floor + 2 floors. External thermal insulation and external doors and windows will be replaced on these buildings, with the required quality in accordance with the Decree of the Minister for Transport. It will result in significant energy savings for the institution after the investment. In preparation for the above construction project elements — the technical preparation activities (technical plans, building energy certificates, calculations) required for the renovation of the 3 installations for building energy purposes are carried out by the external service provider, and — the conditional procurement procedures related to the renovation (1 pcs) are carried out by 1 main public procurement consultant (required service). An external service provider shall perform the task of drawing up and carrying out the necessary certifications and calculations in connection with the construction activities related to the construction of the built infrastructure, as well as the technical inspector’s activity and — after the completion of the construction. From the start of project implementation, project management activities are carried out on a continuous basis. In the project — 1 project manager (7 years of relevant work experience), — 1 financial manager (7 years of relevant work experience) and — 1 technical expert (4 years of relevant work experience). The provision of information and publicity related to the use of the assistance is carried out on a continuous basis during the implementation of the project, in accordance with the corporate and content requirements of the ‘KIC 2020 Guidelines’. Planned period of implementation of the project: 2018.03.01-2018.10.31. (8 months). Cost claim of the project: HUF 126,295.56 gross. (English)
9 February 2022
0 references
Dans le cadre de la proposition de projet intitulée «Construire le développement énergétique des maisons de repos sur le site Fehérgyarmat de SZSZBMK», la requérante à l’aide, conformément aux dispositions du point 3.6.2 de l’appel à projets no KEHOP-5.2.10, sur 1 site, 3, 173/2003. Section VI de l’annexe 2 du décret gouvernemental no 2 du 28 octobre 2004 Mettre en œuvre des améliorations énergétiques dans un bâtiment répondant aux exigences de qualification des maisons de loisirs. Les améliorations d’investissement dans les infrastructures construites pour améliorer les équipements thermiques obsolètes des bâtiments et réduire la consommation d’énergie sont les suivantes: Élément de projet no 1 (PE1): Hôtel d’infirmières I. (4900 Fehérgyarmat, Kossuth square 43, bâtiment hôtelier). [Réponse: 804/2]) — c.ca.: 450 m² chauffé au rez-de-chaussée + 2 niveaux — élément de projet 2 (PE2): Auberge d’infirmières II. (4900 Fehérgyarmat, Kossuth square 45 hôteliers d’infirmières). [Réponse: 804/2]) — c.ca.: 429 m² de rez-de-chaussée chauffé + 2 niveaux — élément de projet no 3 (PE3): Nurses Hotel III: (4900 Fehérgyarmat, Kossuth square 47 hôteliers d’infirmières). [Réponse: 804/2]) — c.ca.: 466 m² chauffé au rez-de-chaussée + 2 étages. L’isolation thermique extérieure et les portes et fenêtres extérieures seront remplacées sur ces bâtiments, avec la qualité requise conformément au décret du ministre des Transports. Cela permettra à l’établissement de réaliser d’importantes économies d’énergie après l’investissement. En préparation des éléments du projet de construction susmentionnés — les activités de préparation technique (plans techniques, certificats énergétiques pour les bâtiments, calculs) nécessaires à la rénovation des trois installations à des fins énergétiques dans les bâtiments sont menées par le prestataire de services extérieur, et — les procédures de passation de marchés conditionnels liées à la rénovation (1 PC) sont effectuées par 1 consultant principal en matière de marchés publics (service requis). Un prestataire de services externe exécute la tâche d’établir et d’effectuer les certifications et calculs nécessaires dans le cadre des activités de construction liées à la construction de l’infrastructure construite, ainsi que de l’activité de l’inspecteur technique et — après l’achèvement de la construction. Dès le début de la mise en œuvre du projet, les activités de gestion de projet sont menées sur une base continue. Dans le projet — 1 chef de projet (7 ans d’expérience professionnelle pertinente), — 1 gestionnaire financier (7 ans d’expérience professionnelle pertinente) et — 1 expert technique (4 ans d’expérience professionnelle pertinente). La fourniture d’informations et de publicités relatives à l’utilisation de l’aide est effectuée de manière continue au cours de la mise en œuvre du projet, conformément aux exigences en matière d’entreprise et de contenu des «lignes directrices de la CCI 2020». Période prévue de mise en œuvre du projet: 2018.03.01-2018.10.31. (8 mois). Demande de remboursement des coûts du projet: HUF 126 295,56 HUF brut. (French)
10 February 2022
0 references
Fehérgyarmat, Szabolcs-Szatmár-Bereg
0 references
Identifiers
KEHOP-5.2.10-16-2017-00160
0 references