Station development and integrated customer service development programme (government windows) (Q3942966): Difference between revisions
Jump to navigation
Jump to search
(Removed claims) |
(Changed an Item: fix budget) |
||||||||||||||
Property / co-financing rate | |||||||||||||||
83.93 percent
| |||||||||||||||
Property / co-financing rate: 83.93 percent / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
6,564,251,030.0 forint
| |||||||||||||||
Property / budget: 6,564,251,030.0 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
18,557,137.66 Euro
| |||||||||||||||
Property / budget: 18,557,137.66 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / budget: 18,557,137.66 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / budget: 18,557,137.66 Euro / qualifier | |||||||||||||||
point in time: 15 February 2022
| |||||||||||||||
Property / EU contribution | |||||||||||||||
5,509,375,889.48 forint
| |||||||||||||||
Property / EU contribution: 5,509,375,889.48 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
15,575,005.64 Euro
| |||||||||||||||
Property / EU contribution: 15,575,005.64 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 15,575,005.64 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / EU contribution: 15,575,005.64 Euro / qualifier | |||||||||||||||
point in time: 15 February 2022
|
Revision as of 01:51, 15 February 2022
Project Q3942966 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Station development and integrated customer service development programme (government windows) |
Project Q3942966 in Hungary |
Statements
5,509,375,889.48 forint
0 references
6,564,251,030.0 forint
0 references
83.93 percent
0 references
6 May 2013
0 references
31 March 2023
0 references
MÁV Magyar Államvasutak Zártkörűen Működő Részvénytársaság
0 references
A projektbe vont vasútállomásokon naponta 600-10.000 fő közlekedik. Az utasforgalom jelentős része napi bejáró- hivatásforgalmi utazó. A közösségi/egyéni közlekedési eszközt használók aránya (modal-split) jelenleg 35%/65%, amely a közösségi közlekedés versenyképességének növelése, pozitív változtatások nélkül további eltolódást fog mutatni az egyéni közlekedés irányába. A MÁV Zrt. által kezdeményezett fejlesztések a teljes értéklánc mentén : hálózat fejlesztés, állomások, állomási szolgáltatások fejlesztése kívánják a vasúti közlekedés versenyképességét növelni. A MÁV állomások a vasúti közlekedésben meglévő szerepük mellett a települések szolgáltató központjává és közösségi tereivé válhatnak. Az állomási rekonstrukciós program segít megállítani a környezet pusztulását. A kamerarendszerek kiépítése megakadályozza a rongálásokat, segíti a fejlesztések fenntarthatóságát. A projekt helyszínein alapvetően javítja:az állomási utaslétesítmények állapotát, a közbiztonságot és vagyonvédelmet (térfigyelő kamerák), az utastájékoztatás színvonalát, a parkolási lehetőségeket. A projekt MT-ben az utasforgalom előrejelzése elfogadott hazai és nemzetközi prognózisok alapján készült. A Budapest elővárosi vasúttal valamint azon belül az intermodalitással érintett helyszínek vonatkozásában átlag feletti 30%-os utasforgalmi fejlődés, a csak intermodalitás fejlesztési lehetőségekkel valamint a 100e főt meghaladó lakosszámú városokban érintett helyszíneken 15%-os. Az 50e főt alatti szezonális turisztikai helyszíneken 10%-os utasforgalom fejlődés került meghatározásra. Hálózati szinten a MÁV Zrt. által üzemeltetett vasúti hálózat utasforgalmának átlagos, várható változása 2013. évhez viszonyítva a 2014-2042 közötti időszakban folyamatos átlagban 1%-os éves utasforgalom növekedést mutat. Az elmúlt évtized vonali infrastruktúrafejlesztéseiből kimaradtak az állomásépületek és utasforgalmi tereinek korszerűsítései. Projektekbe a vonali infrastruktúrafejlesztésekhez kapcsolódva kerültek beemelésre a kijelölt állomások. Elérendő cél a személyszállítás szolgáltatási színvonalát növelő, az üzletpolitikai és versenyképességi elvárásoknak is megfeleltetett komplex szolgáltatásfejlesztés megvalósítása. Az állomásfejlesztési program az alábbi helyszíneken valósul meg a következő felosztásban: Békéscsaba, Budapest (Bp. Déli pu., Bp. Keleti pu., Bp. Nyugati pu.), Cegléd, Érd (Érd alsó mh), Győr, Kaposvár, Miskolc (Miskolc Tiszai pu.), Nyíregyháza, Pécs, Szeged, Székesfehérvár, Szolnok, Vác, Keszthely, Balatonszentgyörgy, Tapolca, Budapest (Kőbánya-Kispest). A helyszínek eltérő infrastrukturális kiépítettsége és egyedi adottságai miatt eltérő műszaki tartalommal valósulnak meg a fejlesztések. A helyi adottságok lehetőségeinek optimalizálását szem előtt tartva valósul meg az állomási ingatlan fejlesztés, utas-tájékoztató rendszer fejlesztése, térfigyelő rendszer kiépítése, integrált ügyfélszolgálati rendszer kiépítése (Kormányablakok), perontetők felújítása/építése, utasforgalmi terek térvilágítási rendszerének korszerűsítése, infokommunikációs rendszer kiépítése. A projekt a KÖZOP-2.5.0-09-11-2013-0003 projekt folytatásaként tervezetten IKOP forrásból valósul meg. A szakaszolást a 1369/2015. (VI.3) Korm. határozat hagyta jóvá. A KÖZOP szakaszban elkészült a Pécsi felvételi épület felújítása és Kormányablak kialakítása, valamint Vác és Füzesabony felvételi épületekben a KAB kialakítása. A KÖZOP szakaszban megkezdődött és az IKOP szakaszban folytatódik Kaposvár felvételi épületének felújítása és KABak kialakítása, valamint Keszthely és Balatonszentgyörgy felvételi épületeinek felújítása. Az IKOP szakaszban megvalósítandó további kivitelezések közül a Bp. keleti pu. és Bp. Nyugati pu. területén kialakítandó KAB, valamint a Tapolca felvételi épület felújításának kivitelezésére vonatkozó feltételes közbeszerzési eljárás folyamatban van, szerződéskötés 2016. júniusban várható. Az ezekhez kapcsolódó független mérnök szerződések megkötésre kerültek. Kőbánya-Kispest állomás felvételi épületének felújítására vonatkozó, feltételes tervezési közbeszerzési eljárás előkészítése folyamatban van, az ajánlati felhívás megjelenés tervezett ideje 2016. április eleje. Az engedélyes tervek 2017. II. félévben, míg a kiviteli tervek 2018. I. félvében fognak rendelkezésre állni. Ez alapján a kivitelezés (egyben a projekt fizikai befejezési határideje) 2019. december 31. A további 10 Kormányabalak kialakítására vonatkozó feltételes kivitelezési közbeszerzési eljárás előkészítése folyamatban van, az egyes eljárások egymást követően, ütemezetten kerülnek kiírásra. Ezekhez a helyszínekhez kapcsoló független mérnök feltételes közbeszerzési eljárás folyamatban van, az összegzés kiküldésre került, szerződéskötés 2016. áprilisban várható. (Hungarian)
0 references
The train stations involved in the project run 600-10,000 people a day. A significant part of the passenger traffic is a daily walk-in traveller. The share of users of Community/individual means of transport (modal-split) is currently 35 %/65 %, which will lead to a further shift towards individual transport without positive changes. Developments initiated by MÁV Zrt. along the entire value chain: network development, stations and station services are intended to increase the competitiveness of rail transport. In addition to their role in rail transport, MÁV stations can become the service centre and community space of the municipalities. The station reconstruction program helps to stop the destruction of the environment. The construction of camera systems prevents damage and helps the sustainability of developments. The project will substantially improve the state of the station’s passenger facilities, public safety and security (surveillance cameras), the quality of passenger information and parking facilities. The project in MT was based on accepted domestic and international projections for passenger traffic forecasts. With regard to the Budapest suburban railway, including intermodality, there is an above-average passenger traffic development of 30 %, with only intermodality development possibilities and 15 % at locations in cities with a population of more than 100 persons. There is a 10 % development of passenger traffic in seasonal tourist destinations below 50e. At network level, the average expected change in passenger traffic on the railway network operated by MÁV Zrt., compared to 2013, shows an increase in annual passenger traffic of 1 % on a continuous average over the period 2014-2042. Upgrades to station buildings and passenger spaces have been omitted from the development of line infrastructure over the last decade. The designated stations were included in projects related to line infrastructure developments. The objective to be achieved is the implementation of complex service development that enhances the service level of passenger transport and meets the requirements of business policy and competitiveness. The station development programme will be implemented in the following locations: Békéscsaba, Budapest (Bp. Southern pu., Bp. Oriental pu., Bp. Western pu.), Cegléd, Érd, Győr, Kaposvár, Miskolc (Miskolc Tiszai pu.), Nyíregyháza, Pécs, Szeged, Székesfehérvár, Szolnok, Vác, Keszthely, Balatonszentgyörgy, Tapolca, Budapest (Kőbánya-Kispest). Due to the different infrastructure and specific features of the sites, the development takes place with different technical content. With a view to optimising the possibilities of local conditions, the station property development, the development of the passenger-information system, the development of a surveillance system, the establishment of an integrated customer service system (Government windows), the renovation/construction of platform roofs, the modernisation of the space lighting system for passenger traffic spaces, the development of an information communication system will be realised. As a continuation of the KÖZOP-2.5.0-09-11-2013-0003 project, the project will be implemented from IKOP sources. The phase-out is set out in Article 1369/2015. Approved by Government Decision (VI.3). During the KÖZOP phase the renovation of the Pécs entrance building and the construction of the Government window were completed, as well as the construction of the KAB in Vác and Füzesabony entrance buildings. The renovation of the Kaposvár entrance building and the construction of Kabak and the renovation of the entrance buildings of Keszthely and Balatonszentgyörgy started in the KÖZOP phase and will continue in the IKOP phase. Among the additional works to be carried out in the IKOP phase, the Bp. Eastern pu. and Bp. A conditional public procurement procedure for the construction of the renovation of the Tapolca hiring building is ongoing and a contract is expected in June 2016. The related independent engineer contracts have been concluded. A conditional planning procurement procedure for the renovation of the quarry-Kispest station hiring building is being prepared, and the call for tenders is scheduled for the beginning of April 2016. The licensee’s plans are 2017. In the second half of 2018, while the construction plans are 2018. I. will be available in half. On this basis, the construction (and the physical completion date of the project) is 31 December 2019. The conditional construction procurement procedure for the establishment of the other 10 government posts is under preparation and each procedure is scheduled to be published successively. The independent engineer linked to these locations is subject to a conditional procurement procedure, the summary has been sent out and a contract is expected in April 2016. (English)
9 February 2022
0 references
Les gares concernées par le projet circulent entre 600 et 10 000 personnes par jour. Une part importante du trafic de passagers est un voyageur sans rendez-vous quotidien. La part des usagers des moyens de transport communautaires/individuels (modal-split) est actuellement de 35 %/65 %, ce qui conduira à une nouvelle transition vers les transports individuels sans changements positifs. Développements initiés par MÁV Zrt. tout au long de la chaîne de valeur: le développement du réseau, les gares et les services de gare visent à accroître la compétitivité du transport ferroviaire. Outre leur rôle dans le transport ferroviaire, les gares MÁV peuvent devenir le centre de service et l’espace communautaire des municipalités. Le programme de reconstruction de la station permet d’arrêter la destruction de l’environnement. La construction de systèmes de caméras prévient les dommages et contribue à la durabilité des développements. Le projet améliorera considérablement l’état des installations pour les passagers de la gare, la sécurité et la sécurité publiques (caméras de surveillance), la qualité de l’information des passagers et des installations de stationnement. Le projet à MT était fondé sur des projections nationales et internationales acceptées pour les prévisions du trafic de passagers. En ce qui concerne le chemin de fer de la banlieue de Budapest, y compris l’intermodalité, le trafic de voyageurs connaît un développement supérieur à la moyenne de 30 %, avec seulement des possibilités de développement intermodal et 15 % dans des villes comptant plus de 100 personnes. Il y a une évolution de 10 % du trafic de passagers dans les destinations touristiques saisonnières inférieures à 50e. Au niveau du réseau, l’évolution moyenne attendue du trafic voyageurs sur le réseau ferroviaire exploité par MÁV Zrt., par rapport à 2013, montre une augmentation du trafic annuel de voyageurs de 1 % sur une moyenne continue sur la période 2014-2042. Les améliorations apportées aux bâtiments des gares et aux espaces destinés aux passagers ont été omises du développement de l’infrastructure des lignes au cours de la dernière décennie. Les stations désignées ont été incluses dans des projets liés à l’aménagement de l’infrastructure de ligne. L’objectif à atteindre est la mise en œuvre d’un développement de services complexe qui améliore le niveau de service du transport de voyageurs et répond aux exigences de la politique commerciale et de la compétitivité. Le programme de développement de la station sera mis en œuvre dans les endroits suivants: Békéscsaba, Budapest (Bp. Pu. du Sud, Bp. Oriental pu., Bp. Western pu.), Cegléd, Érd, Győr, Kaposvár, Miskolc (Miskolc Tiszai pu.), Nyíregyháza, Pécs, Szeged, Székesfehérvár, Szolnok, Vác, Keszthely, Balatonszentgyörgy, Tapolca, Budapest (Kőbánya-Kispest). En raison de l’infrastructure différente et des caractéristiques spécifiques des sites, le développement a lieu avec un contenu technique différent. Afin d’optimiser les possibilités des conditions locales, l’aménagement de la gare, le développement du système d’information des passagers, le développement d’un système de surveillance, la mise en place d’un système intégré de service à la clientèle (fenêtres gouvernementales), la rénovation/la construction de toits de plate-forme, la modernisation du système d’éclairage de l’espace pour les espaces de circulation des passagers, le développement d’un système de communication d’information seront réalisés. Dans le prolongement du projet KÖZOP-2.5.0-09-11-2013-0003, le projet sera mis en œuvre à partir de sources IKOP. L’élimination progressive est prévue à l’article 1369/2015. Approuvé par décision gouvernementale (VI.3). Au cours de la phase KÖZOP, la rénovation du bâtiment d’entrée Pécs et la construction de la fenêtre du gouvernement ont été achevées, ainsi que la construction du KAB à Vác et Füzesabony. La rénovation du bâtiment d’entrée de Kaposvár et la construction de Kabak et la rénovation des bâtiments d’entrée de Keszthely et Balatonszentgyörgy ont commencé dans la phase KÖZOP et se poursuivront dans la phase IKOP. Parmi les travaux supplémentaires à réaliser dans la phase IKOP, le Bp. Eastern pu. et Bp. Une procédure de passation de marchés publics conditionnelle pour la construction de la rénovation du bâtiment de location Tapolca est en cours et un contrat est attendu en juin 2016. Les contrats connexes d’ingénieur indépendant ont été conclus. Une procédure de passation de marchés de planification conditionnelle pour la rénovation du bâtiment de location de la station carrière-Kispest est en cours d’élaboration et l’appel d’offres est prévu pour le début du mois d’avril 2016. Les plans de la titulaire sont 2017. Au second semestre 2018, alors que les plans de construction sont de 2018. I. sera disponible dans la moitié. Sur cette base, la construction (et la date d’achèvement physique du projet) est le 31 décembre 2019. La procédure de passation de marchés co... (French)
10 February 2022
0 references
Budapest, Budapest
0 references
Identifiers
IKOP-2.1.0-15-2016-00015
0 references