Building energy development using renewable energy at METALLUX Zrt. (Q3935682): Difference between revisions
Jump to navigation
Jump to search
(Removed claims) |
(Changed an Item: fix budget) |
||||||||||||||
Property / co-financing rate | |||||||||||||||
55.0 percent
| |||||||||||||||
Property / co-financing rate: 55.0 percent / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
117,072,470.0 forint
| |||||||||||||||
Property / budget: 117,072,470.0 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
330,963.87 Euro
| |||||||||||||||
Property / budget: 330,963.87 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / budget: 330,963.87 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / budget: 330,963.87 Euro / qualifier | |||||||||||||||
point in time: 15 February 2022
| |||||||||||||||
Property / EU contribution | |||||||||||||||
64,389,858.5 forint
| |||||||||||||||
Property / EU contribution: 64,389,858.5 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
182,030.13 Euro
| |||||||||||||||
Property / EU contribution: 182,030.13 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 182,030.13 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / EU contribution: 182,030.13 Euro / qualifier | |||||||||||||||
point in time: 15 February 2022
|
Revision as of 23:07, 14 February 2022
Project Q3935682 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Building energy development using renewable energy at METALLUX Zrt. |
Project Q3935682 in Hungary |
Statements
64,389,858.5 forint
0 references
117,072,470.0 forint
0 references
55.0 percent
0 references
1 December 2020
0 references
30 September 2022
0 references
METALLUX Galvanizáló és Szennyvízkezelő Berendezéseket Gyártó Zárkörűen Működő Részvénytársaság
0 references
1. Építészet Az épület homlokzatán dryvit rendszerű hőszigetelés készül. Az AUSTROTHERM AT-H80 hőszigetelő lapok vastagsága a homlokzaton 150 mm, melyet pontszerűen rögzítenek a falszerkezethez. A lábazat 150 mm vastagságú formahabosított EPS hőszigetelést (AUSTROTHERM Expert Fix) kap. A födém felső síkjára AUSTROTHERM AT-N100 EPS hőszigetelő lemez kerül. A felülvilágító lábazati fala hőszigetelésre kerül, a falának külső síkjára dryvit rendszerű hőszigetelés 200 mm vtg. AUSTROTHERM Expert Fix hőszigetelő lemez kerül felvitelre. A felső síkon üregkamrás POLIKARBONÁT felülvilágítót építenek be, félnyeregtetős kialakítással, 25 mm vastagsággal. Az épület homlokzati nyílászáróit kibontásra kerülnek (acél szerkezetű nyílászárók, kopolit üveg). Ezt követően beépítésre kerülnek az új műanyag szerkezetű nyílászárók a tervdokumentációnak megfelelően. A meglévő ipari kapu kicserélésre kerül HÖRMANN szekcionált garázskapura. Az attikafal belső és felső síkján hőszigetelést építenek be, melynek vastagsága 150 mm. 2. Napelemes rendszer: A rendszer kiépítésének feltételei adottak. Az épület tetejére 48 db, modul kerül elhelyezésre. 60 cellás, monokristályos modulok alu keretben, 3,2 mm vasmentes edzett szolárüveggel, EVA kitöltéssel, IP65-ös csatlakozó dobozzal, szolár vezetékkel, szolár csatlakozókkal. Tervezett panel: Risen RSM60-6-310M. Tartószerkezet: Rozsdamentes acél és alumíniumból készült könnyűszerkezetű alépítmény rendszer csatlakozó elemekkel, a PV-generátor elrendezéséhez illesztett, részben állványos, részben tetősíkkal párhuzamos szereléshez. Inverter: 1 db (FRONIUS SYMO 12.5.0-3-M) háromfázisú 400/3x230V, 50Hz hálózattal szinkron üzemben működő, wifi modullal rendelkező inver. 3. Gépészet Az épület belső gázellátáas átalakításra kerül. Az épületben korábban kiépítésre került a vezetékes gázellátás. A meglévő gázkészülékek és gázvezetékek visszabontásra kerül. A beépítésre kerülő mért kisnyomású vezeték anyaga szabvány szerinti varrat nélküli acélcső. Korábbi gázkészülékek típusai: • 12 db Pakole GH11 gázinfra • 8 db Pakole GH18 gázinfra • 2db Pakole GH7 gázinfra Betervezett berendezések típusai: • 4 db Pakole GH7 gázinfra Pakole GTV-E-40A 3P Földgáz üzemű zárt égésterű hőlégfúvó. IP21 CE1008CQ2928 • 1 db Pakole GH7 gázinfra Pakole GTV-E-40A 3P Földgáz üzemű zárt égésterű hőlégfúvó. IP21 CE1008CQ2928 (Hungarian)
0 references
1. Architecture The facade of the building is equipped with dryvit thermal insulation. The thickness of the Austrotherm AT-H80 thermal insulation tiles on the façade is 150 mm, which is attached exactly to the wall structure. The plinth receives a 150 mm thick EPS thermal insulation (Austrotherm Expert Fix). Austrotherm AT-N100 EPS thermal insulation plate is placed on the upper plane of the slab. The pedestal wall of the overlighter is thermally insulated, the dryvit system of thermal insulation on the outer plane of the wall is 200 mm vtg. Austrotherm Expert Fix thermal insulation plate is applied. The upper plane is equipped with a cavity-chamber polycarbonate overlighter, with a semi-screw top design with a thickness of 25 mm. The doors and windows of the building are opened (steel doors and windows, copolit glass). The new plastic doors and windows will then be installed in accordance with the design documentation. The existing industrial gate will be replaced by HÖRMANN sectional garage door. Thermal insulation is installed on the inner and upper planes of the attic wall with a thickness of 150 mm. 2. Solar system: The conditions for the deployment of the system are met. 48 modules are placed on the roof of the building. 60 cell monocrystalline modules with aluminium frame, 3.2 mm iron-free hardened solar glass, EVA filling, IP65 connector box, solar wire, solar connectors. Designed panel: Risen RSM60-6-310M. Support structure: Stainless steel and aluminium lightweight duct system with connecting elements, for fitting to the PV-generator arrangement, partly with scaffolding and partly parallel to the roof plane. Inverter: 1 (FRONIUS SYMO 12.5.0-3-M) three-phase 400/3x230V, operating in synchronous operation with 50 Hz network, with Wi-Fi module. 3. Engineering The building is converted into an internal gas supply. The pipeline gas supply was previously installed in the building. Existing gas appliances and pipelines will be decommissioned. The measured low-pressure wire material to be installed is a standard seamless steel tube. Types of previous gas appliances: • 12 PAKOLE GH11 gas infrared • 8 PAKOLE GH18 gas infrared • 2pcs PAKOLE GH7 gas infrared Types of equipment: • 4 PAKOLE GH7 gas infra-fra PAKOLE GTV-E-40A 3P Natural gas fuelled closed fronted air heaters. IP21 CE1008CQ2928 • 1 PAKOLE GH7 gas infrared PAKOLE GTV-E-40A 3P Natural gas-fuelled closed fronted air heater. IP21 CE1008CQ2928 (English)
8 February 2022
0 references
1. Architecture La façade du bâtiment est équipée d’une isolation thermique Dryvit. L’épaisseur des carreaux d’isolation thermique Austrotherm AT-H80 sur la façade est de 150 mm, qui est fixée exactement à la structure du mur. Le socle reçoit une isolation thermique EPS de 150 mm d’épaisseur (Austrotherm Expert Fix). Austrotherm AT-N100 EPS plaque d’isolation thermique est placé sur le plan supérieur de la dalle. La paroi du piédestal du projecteur est isolée thermiquement, le système Dryvit d’isolation thermique sur le plan extérieur du mur est de 200 mm vtg. La plaque d’isolation thermique d’Austrotherm Expert Fix est appliquée. Le plan supérieur est équipé d’un projecteur en polycarbonate de chambre à cavités, avec une conception semi-vissée avec une épaisseur de 25 mm. Les portes et les fenêtres du bâtiment sont ouvertes (portes et fenêtres en acier, verre copolite). Les nouvelles portes et fenêtres en plastique seront ensuite installées conformément à la documentation de conception. La porte industrielle existante sera remplacée par une porte de garage sectionnelle HÖRMANN. L’isolation thermique est installée sur les plans intérieur et supérieur de la paroi du grenier d’une épaisseur de 150 mm. 2. Système solaire: Les conditions de déploiement du système sont remplies. 48 modules sont placés sur le toit du bâtiment. 60 modules monocristallins à cellules avec cadre en aluminium, verre solaire trempé sans fer de 3,2 mm, remplissage EVA, boîtier de connecteur IP65, fil solaire, connecteurs solaires. Panneau conçu: RSM60-6-310M. Structure de support: Système de gaine légère en acier inoxydable et aluminium avec éléments de raccordement, pour montage sur l’appareil électrogène PV, en partie avec échafaudage et en partie parallèle au plan du toit. Onduleur: 1 (FRONIUS SYMO 12.5.0-3-M) triphasé 400/3x230V, fonctionnant en fonctionnement synchrone avec un réseau de 50 Hz, avec module Wi-Fi. 3. Ingénierie Le bâtiment est transformé en un approvisionnement en gaz interne. L’approvisionnement en gaz du pipeline était auparavant installé dans le bâtiment. Les appareils à gaz et les gazoducs existants seront déclassés. Le matériau de fil à basse pression mesuré à installer est un tube en acier sans soudure standard. Types d’appareils à gaz antérieurs: • 12 PAKOLE GH11 gaz infrarouge • 8 PAKOLE GH18 gaz infrarouge • 2pcs PAKOLE GH7 gaz infrarouge Types d’équipement: • 4 PAKOLE GH7 gaz infra-fra PAKOLE GTV-E-40A 3P Gaz naturel Chauffage à air fronté fermé. IP21 CE1008CQ2928 • 1 PAKOLE GH7 gaz infrarouge PAKOLE GTV-E-40A 3P Chauffage à air fronté fermé alimenté au gaz naturel. IP21 CE1008CQ2928 (French)
10 February 2022
0 references
Csurgó, Somogy
0 references
Identifiers
GINOP-4.1.4-19-2020-02841
0 references