Calcit-2006 Ltd. Construction of 197.8 kWp solar panel system with ground installation (Q3935646): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claims)
(‎Changed an Item: fix budget)
Property / co-financing rate
 
55.0 percent
Amount55.0 percent
Unitpercent
Property / co-financing rate: 55.0 percent / rank
 
Normal rank
Property / budget
 
53,818,000.0 forint
Amount53,818,000.0 forint
Unitforint
Property / budget: 53,818,000.0 forint / rank
 
Normal rank
Property / budget
 
152,143.49 Euro
Amount152,143.49 Euro
UnitEuro
Property / budget: 152,143.49 Euro / rank
 
Preferred rank
Property / budget: 152,143.49 Euro / qualifier
 
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
Property / budget: 152,143.49 Euro / qualifier
 
point in time: 15 February 2022
Timestamp+2022-02-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / EU contribution
 
29,599,900.0 forint
Amount29,599,900.0 forint
Unitforint
Property / EU contribution: 29,599,900.0 forint / rank
 
Normal rank
Property / EU contribution
 
83,678.92 Euro
Amount83,678.92 Euro
UnitEuro
Property / EU contribution: 83,678.92 Euro / rank
 
Preferred rank
Property / EU contribution: 83,678.92 Euro / qualifier
 
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
Property / EU contribution: 83,678.92 Euro / qualifier
 
point in time: 15 February 2022
Timestamp+2022-02-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 23:06, 14 February 2022

Project Q3935646 in Hungary
Language Label Description Also known as
English
Calcit-2006 Ltd. Construction of 197.8 kWp solar panel system with ground installation
Project Q3935646 in Hungary

    Statements

    0 references
    29,599,900.0 forint
    0 references
    83,678.92 Euro
    0.002827 Euro
    15 February 2022
    0 references
    53,818,000.0 forint
    0 references
    152,143.49 Euro
    0.002827 Euro
    15 February 2022
    0 references
    55.0 percent
    0 references
    30 September 2020
    0 references
    31 December 2021
    0 references
    KALCIT-2006 Mészkőbányászati és Kereskedelmi Korlátolt Felelősségű Társaság
    0 references
    0 references

    48°27'37.87"N, 20°43'47.14"E
    0 references
    A tervezett napelem rendszer földi telepítéssel lesz megvalósítva közvetlenül az épületeink melletti szabad földterületen a 3754 Szalonna, Külterület 018 hrsz.a cég székhelyén. A tervezett napelemes rendszer 460 db 430 watt teljesítményű monokristályos napelemből , 1 db Sungrow SG110CX típusú inverterből és 1 db SG50KTL tipusú inverterből (10 év teljes körű garanciával), a hozzá tartozó túlfeszültség védelemmel, visszatáplálási védelemmel ellátva, földi tartószerkezetből, a szükséges vezetékekkel, kábelekkel, szerelési anyagokkal és csatlakozókkal együtt.. Cégünk éves villamos energia fogyasztása a 6041 Kerekegyháza, Szabadság u 27. szám alatt HU000220F11-S00000000000005010356 mérési ponton keletkező 300766 kWh . Ez főként az örlő üzemben használt gépekhez szükséges energia mennyiség. Ezekkel a gépekkel dolgozunk a kő feldolgozásához: örlő, torő és osztályozó gépek és szállítószalagok. Környezetvédelmi szempontok alapján a megújuló energiaforrás-felhasználás növelése által az üvegházhatást okozó gázok kibocsátása csökkenne a napelem rendszer kiépítésével, ami jelentős költség megtakarítást is eredményezne, amely a vállalkozás további versenyképességét erősítené és fejlesztést eredményezhetne, a meglévő munkavállalói létszám megtartása mellett tovább növelhetné a foglalkoztatottak számát. A projekt megvalósítását nagy tapasztalattal bíró cégre bízzuk, akik már több napelem rendszert telepített, kiváló referenciával bír. A kiépítés menete: Pontalapok fúrása szükséges a tartószerkezetek alatti pontalapok kialakításához. Az inverterek és a betáplálási pont között 90 cm mélységben védőcscsőben elhelyezett kábel részére munkaárok készül. Alapozás: A fém tartóoszlopok alatt 30 cm átmérőjű és 90 cm mélységű beton pontalapok készülnek, melyekbe a tartóoszlopok befogásra kerülnek. Lakatos szerkezetek: Horganyzottacél oszlopok és horganyzottacél szelemen rendszerek kerülnek kiépítésre, oldható (önmetsző fémcsavaros) kötésekkel, a napelem panelek fogadására. Felületképzés: Az inverter elhelyezésére szolgáló nem horganyzott fém elemek felületképzése szükséges, ipari alapozó felhozdását követő 2 rtg. fedőfesték felhordásával. Villanyszerelés: A napelemes rendszer elektromos kábelei, valamint a rendszer védelmét adó biztosítéktábla és biztosítékoknak helyet adó szerkezet kerül elhelyezésre, valamint a szükséges kábelezés kerül kialakításra. A meglévő transzformátor állomás alkalmas a hálózatra történő csatlakozási pont kialakítására. Megújuló energiát hasznosító berendezések telepítése: Megújuló energiát hasznosító berendezéskeént beépítésre kerül: Hálózatra kapcsolt komplett napelemes (fotovoltaikus) rendszerek telepítése, villamos hálózatra kapcsolása, monokristályos napelemes rendszerként, meglévő tetőre telepítve kompletten, háromfázisú 198 kWp-os napelemes rendszer. (Hungarian)
    0 references
    The planned solar panel system will be implemented by ground installation directly on the free land next to our buildings at the headquarters of 3754 Salonna, Outside 018 hrsz.a. The planned solar panel system consists of 460 pcs 430 watts monocrystalline solar panels, 1 Sungrow SG110CX type inverter and 1 SG50KTL type inverter (10 years with full warranty), with the associated overvoltage protection, regenerative protection, ground support structure, with the necessary wires, cables, mounting materials and connectors. The annual electricity consumption of our company at 6041 Kerekegyháza, Szabadság u 27, HU000220F11-S00000000000005010356 is generated at 300 766 kWh. This is mainly the amount of energy needed for machines used in the mill. We work with these machines to process stone: grinding, grinding and grading machines and conveyor belts. From an environmental point of view, increasing the use of renewable energy sources would reduce greenhouse gas emissions by building a solar panel system, which would also result in significant cost savings, which would strengthen the company’s further competitiveness and lead to development, while retaining the existing workforce, further increasing the number of employees. We entrust the implementation of the project to a company with extensive experience, who have already installed several solar panel systems and have excellent references. The construction process: Drilling of point bases is necessary for the construction of point bases below the supporting structures. The cable between the inverters and the entry point in a protective tube at a depth of 90 cm shall be equipped with labour trenches. Foundation: Under the metal pillars there are concrete dots with a diameter of 30 cm and a depth of 90 cm, into which the pillars are captured. Lattice structures: Galvanised steel poles and galvanised steel panel systems are installed with soluble (self-tapping metal screw) joints, to receive solar panels. Surface finish: The surface formation of non-galvanised metal elements for the inverter is necessary by applying 2 rtg. cover inks after the industrial primer has been added. Electrical installation: The electrical cables of the solar system, as well as the fuse board and the fuse structure to protect the system, are installed and the necessary wiring is installed. The existing transformer station is capable of forming a connection point to the network. Installation of renewable energy equipment: Installation of renewable energy equipment: Installation of complete solar (photovoltaic) systems connected to the network, connection to the electricity network, as a monocrystalline solar panel system, installed on an existing roof, complete, three-phase 198 kWp solar panel system. (English)
    8 February 2022
    0 references
    Le système de panneaux solaires prévu sera mis en œuvre par installation au sol directement sur le terrain libre à côté de nos bâtiments au siège de 3754 Salonna, à l’extérieur 018 hrsz.a. Le système de panneau solaire prévu se compose de 460 pcs 430 watts panneaux solaires monocristallins, 1 onduleur de type Sungrow SG110CX et 1 onduleur de type SG50KTL (10 ans avec pleine garantie), avec la protection contre les surtensions associée, la protection régénérative, la structure de support au sol, avec les fils nécessaires, les câbles, les matériaux de montage et les connecteurs. La consommation annuelle d’électricité de notre société à 6041 Kerekegyháza, Szabadság u 27, HU000220F11-S00000000000005010356 est générée à 300 766 kWh. Il s’agit principalement de la quantité d’énergie nécessaire pour les machines utilisées dans le moulin. Nous travaillons avec ces machines pour traiter la pierre: machines de meulage, de meulage et de classement et courroies transporteuses. D’un point de vue environnemental, l’augmentation de l’utilisation des sources d’énergie renouvelables réduirait les émissions de gaz à effet de serre en construisant un système de panneaux solaires, ce qui entraînerait d’importantes économies de coûts, ce qui renforcerait la compétitivité de l’entreprise et conduirait au développement, tout en conservant la main-d’œuvre existante, augmentant encore le nombre d’employés. Nous confions la mise en œuvre du projet à une entreprise possédant une vaste expérience, qui a déjà installé plusieurs systèmes de panneaux solaires et possède d’excellentes références. Le processus de construction: Le forage des bases ponctuelles est nécessaire pour la construction de bases pointues au-dessous des structures de support. Le câble entre les onduleurs et le point d’entrée dans un tube de protection à une profondeur de 90 cm doit être équipé de tranchées de travail. Fondation: Sous les piliers métalliques, il y a des points de béton d’un diamètre de 30 cm et d’une profondeur de 90 cm, dans lesquels les piliers sont capturés. Structures en treillis: Des poteaux en acier galvanisé et des systèmes de panneaux en acier galvanisé sont installés avec des joints solubles (vis métallique autotaraudant), pour recevoir des panneaux solaires. Finition de surface: La formation de surface d’éléments métalliques non galvanisés pour l’onduleur est nécessaire par l’application d’encres de couverture de 2 tg après l’ajout de l’apprêt industriel. Installation électrique: Les câbles électriques du système solaire, ainsi que le panneau de fusible et la structure du fusible pour protéger le système, sont installés et le câblage nécessaire est installé. La station de transformateur existante est capable de former un point de raccordement au réseau. Installation d’équipements d’énergie renouvelable: Installation d’équipements d’énergie renouvelable: Installation de systèmes solaires complets (photovoltaïques) connectés au réseau, raccordement au réseau électrique, en tant que système de panneaux solaires monocristallins, installés sur un toit existant, système complet de panneaux solaires triphasés de 198 kWp. (French)
    10 February 2022
    0 references
    Szalonna, Borsod-Abaúj-Zemplén
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-02802
    0 references