Building energy development using renewable energy at VILKOR Kft. (Q3935571): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: fix budget) |
(Removed claims) |
||||||||||||||
Property / co-financing rate | |||||||||||||||
| |||||||||||||||
Property / co-financing rate: 55.0 percent / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 20,098,870.0 forint / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 56,819.51 Euro / rank | |||||||||||||||
Property / budget: 56,819.51 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 56,819.51 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 11,054,378.0 forint / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 31,250.73 Euro / rank | |||||||||||||||
Property / EU contribution: 31,250.73 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 31,250.73 Euro / qualifier | |||||||||||||||
|
Revision as of 23:04, 14 February 2022
Project Q3935571 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Building energy development using renewable energy at VILKOR Kft. |
Project Q3935571 in Hungary |
Statements
1 October 2020
0 references
30 September 2022
0 references
VILKOR Ipari, Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság
0 references
A projekt kellő műszaki előkészítettségét tükrözi, hogy az energetikus, tervező a helyszíni felmérést követően elkészítette az építési tervdokumentációt és az energetikai tanúsítványokat (meglévő, tervezett), s ennek megfelelően meghatározta a projekt számszerűsíthető eredményeit, indikátorait. A beruházás nem minősül engedélykötelesnek, így ezen hozzájárulások beszerzése nem releváns. A fent említett mérnöki feladatokon túl műszaki ellenőri ajánlatkérések megtörténtek, a projekt megvalósítás során igénybe veendő műellenőr nevét és jogosultsági számát a projekt részletes bemutatása adatlapon feltüntettük. A projektmenedment felelőssége a projekt határidőre történő hibátlan végrehajtása, így erre a feladatra széles látókörű, jelentős háttértapasztalatokkal és szakértelemmel rendelkező – külső – vállalkozás kerül kiválasztásra, akik kellő referenciákkal rendelkeznek a hasonló volumenű és fejlesztésű célú uniós projektek lebonyolítása terén, mivel a társaság nem rendelkezik uniós projektek lebonyolítása terén kellő tapasztattal. Az előzőeken túl, a Széchenyi 2020 KTK rendelkezései szerinti tájékoztatási csomag kerül megvalósításra. A kivitelezés rövid műszaki tartalma: 1. Építészet Homlokzat és lábazat: Az épület homlokzatán dryvit rendszerű hőszigetelés készül. Az AUSTROTHERM AT-H80 hőszigetelő lapok vastagsága a homlokzaton 150 mm, melyet pontszerűen rögzítünk a falszerkezethez. A lábazat 150 mm vastagságú formahabosított EPS hőszigetelést (AUSTROTHERM Expert Fix) kap, melyre műgyanta lábazatvakolatot hordunk fel, antracit színben. Födémszigetelés: A födémszerkezet felső síkján 2 x 100 mm AUSTROTHERM AT-N100 EPS hőszigetelő lemezt építünk be, melyre MIKROLITH üvegfátyol elválasztó réteget helyezünk, melynek felső síkján készül a csapadékvíz elleni szigetelés. A SIKAPLAN 15 G PVC szigetelést mechanikai rögzítéssel készítjük. Nyílászárók, bevilágítók: A homlokzati nyílászárók cseréjét el kívánjuk végezni. Az új nyílászárók a tervlapon szereplő méretekben készülnek, műanyag szerkezetű, hőszigetelt üvegezéssel ellátott nyílászárók, fehér színben, U=1,15 W/m2K hőátbocsátási tényezővel. 2. Napelemes rendszer: A rendszer kiépítésének feltételei adottak. Az épület tetejére 23 db, modul kerül elhelyezésre. 60 cellás, monokristályos modulok alu keretben, 3,2 mm vasmentes edzett szolárüveggel, EVA kitöltéssel, IP65-ös csatlakozó dobozzal, szolár vezetékkel, szolár csatlakozókkal.. Tervezett panel: Risen RSM60-6-310M. Tartószerkezet: Rozsdamentes acél és alumíniumból készült könnyűszerkezetű alépítmény rendszer csatlakozó elemekkel, a PV-generátor elrendezéséhez illesztett, részben állványos, részben tetősíkkal párhuzamos szereléshez. Inverter: 1 db (FRONIUS SYMO 7.0-3-M) háromfázisú 400/3x230V, 50Hz hálózattal szinkron üzemben működő, wifi modullal rendelkező inverter 3. Gépészet Komplett fűtési rendszer feljlesztése, azaz az épület gépházában helyezük el a kazánokat (2db Fonditál Antea fali kazán (IPX4D), melyek egyenként e=1,0; Q=24,9 kW,q= 2,51 m3/h. Az épület fűtési igénye alapján 2 db kazán szükséges Kaskád léptetéssel, hidraulikus váltón keresztül, tágulási tartályok beépítésével. A kazánok beépítése mellett a szerelvények, fűtéscsövek, fűtőtestek komplett korszerűsítésére sor kerül, amely összhangban van a Felhívás 3.1.1 B) II. a) pontjával.l. (Hungarian)
0 references
The technical preparation of the project is reflected by the fact that the energetic designer prepared the building design documentation and the energy certificates (existing, planned) following the on-site survey and determined the quantifiable results and indicators of the project accordingly. The investment is not subject to authorisation, so the acquisition of these contributions is not relevant. In addition to the above-mentioned engineering tasks, requests from technical inspectors have been made, the name and the eligibility number of the inspector to be used during the implementation of the project are indicated in the detailed description of the project data sheet. The responsibility of project management is the correct implementation of the project by the deadline. For this task, a broad-minded (external) company with significant background experience and expertise will be selected, with sufficient references for the implementation of EU projects of similar scale and development, as the company does not have sufficient experience in the implementation of EU projects. In addition, the information package under the provisions of the Széchenyi 2020 JTI will be implemented. Short technical content of the construction: 1. Architecture Façade and plinth: Dryvit thermal insulation is made on the facade of the building. The thickness of the Austrotherm AT-H80 thermal insulation tiles on the façade is 150 mm, which is attached exactly to the wall structure. The plinth receives a 150 mm thick EPS thermal insulation (Austrotherm Expert Fix) on which resin plaster is applied in anthracite color. Slab insulation: A 2 x 100 mm Austrotherm AT-N100 EPS thermal insulation plate is installed on the top plane of the ceiling structure, on which we place a MIKROLITH glass veil separator layer, on which the rainwater insulation is made on the top plane. SIKAPLAN 15G PVC insulation is made by mechanical fastening. Doors and windows, lights: We want to replace the facade doors. The new doors and windows are constructed in the sizes shown on the design sheet, plastic-structured doors and windows with heat insulated glazing, in white, with a heat transfer factor U=1,15 W/m2K. 2. Solar system: The conditions for the deployment of the system are met. 23 modules are placed on the roof of the building. 60 cell monocrystalline modules in alu frame with 3.2 mm iron-free hardened solar glass, EVA filling, IP65 connector box, solar wire, solar connectors. Designed panel: Risen RSM60-6-310M. Support structure: Stainless steel and aluminium lightweight duct system with connecting elements, for fitting to the PV-generator arrangement, partly with scaffolding and partly parallel to the roof plane. Inverter: 1 (FRONIUS SYMO 7.0-3-M) three-phase 400/3x230V, 50 Hz network synchronous inverter with wifi module 3. Construction of a complete heating system, i.e. installing boilers in the engine room of the building (2pcs Condital Antea wall boiler (IPX4D), each of which is e=1.0; Q=24.9 kW,q= 2.51 m³/h. Based on the heating requirement of the building, 2 boilers are required with Kaskád step, via hydraulic transmission, with expansion tanks installed. In addition to the installation of boilers, complete upgrading of fittings, heating pipes and heaters will take place, which is in line with point 3.1.1(B) II(a) of the Call. (English)
8 February 2022
0 references
La préparation technique du projet se traduit par le fait que le concepteur énergétique a préparé la documentation de conception du bâtiment et les certificats énergétiques (existants, prévus) à la suite de l’enquête sur place et a déterminé les résultats quantifiables et les indicateurs du projet en conséquence. L’investissement n’est pas soumis à autorisation, de sorte que l’acquisition de ces contributions n’est pas pertinente. Outre les tâches d’ingénierie susmentionnées, des demandes d’inspecteurs techniques ont été formulées, le nom et le numéro d’admissibilité de l’inspecteur à utiliser lors de la mise en œuvre du projet sont indiqués dans la description détaillée de la fiche technique du projet. La responsabilité de la gestion du projet est la bonne mise en œuvre du projet dans le délai imparti. Pour cette tâche, une entreprise large d’esprit (externe) disposant d’une expérience et d’une expertise significatives sera sélectionnée, avec suffisamment de références pour la mise en œuvre de projets de l’UE d’une ampleur et d’un développement similaires, étant donné que l’entreprise ne dispose pas d’une expérience suffisante dans la mise en œuvre des projets de l’UE. En outre, le dossier d’information au titre des dispositions de l’ITC Széchenyi 2020 sera mis en œuvre. Contenu technique court de la construction: 1. Architecture Façade et plinthe: L’isolation thermique Dryvit est réalisée sur la façade du bâtiment. L’épaisseur des carreaux d’isolation thermique Austrotherm AT-H80 sur la façade est de 150 mm, qui est fixée exactement à la structure du mur. Le socle reçoit une isolation thermique EPS de 150 mm d’épaisseur (Austrotherm Expert Fix) sur laquelle le plâtre de résine est appliqué en couleur anthracite. Isolation des dalles: Une plaque d’isolation thermique Austrotherm AT-N100 EPS de 2 x 100 mm est installée sur le plan supérieur de la structure du plafond, sur laquelle nous plaçons une couche de séparateur de voile en verre MIKROLITH, sur laquelle l’isolation de l’eau de pluie est faite sur le plan supérieur. L’isolation en PVC Sikaplan 15G est faite par fixation mécanique. Portes et fenêtres, lumières: Nous voulons remplacer les portes de façade. Les nouvelles portes et fenêtres sont construites dans les tailles indiquées sur la feuille de conception, les portes en plastique et les fenêtres avec vitrage isolé thermique, en blanc, avec un facteur de transfert de chaleur U=1,15 W/m2K. 2. Système solaire: Les conditions de déploiement du système sont remplies. 23 modules sont placés sur le toit du bâtiment. 60 modules monocristallins à cellules en alu avec verre solaire trempé sans fer de 3,2 mm, remplissage EVA, boîtier de connecteur IP65, fil solaire, connecteurs solaires. Panneau conçu: RSM60-6-310M. Structure de support: Système de gaine légère en acier inoxydable et aluminium avec éléments de raccordement, pour montage sur l’appareil électrogène PV, en partie avec échafaudage et en partie parallèle au plan du toit. Onduleur: 1 (FRONIUS SYMO 7.0-3-M) triphasé 400/3x230V, onduleur réseau synchrone 50 Hz avec module wifi 3. La construction d’un système de chauffage complet, c’est-à-dire l’installation de chaudières dans la salle des machines du bâtiment (2pcs chaudière murale Antea Condital (IPX4D), dont chacune est e=1,0; Q=24,9 kW,q=2,51 m³/h. En fonction des besoins en chauffage du bâtiment, 2 chaudières sont nécessaires avec marche Kaskád, par transmission hydraulique, avec des réservoirs de dilatation installés. Outre l’installation de chaudières, une modernisation complète des raccords, des tuyaux de chauffage et des dispositifs de chauffage aura lieu, conformément au point 3.1.1 B) II a) de l’appel. (French)
10 February 2022
0 references
Csurgó, Somogy
0 references
Identifiers
GINOP-4.1.4-19-2020-02706
0 references