Energy renovation of “Polaris Yacht Apartments” (Q3935255): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claims)
(‎Changed an Item: fix budget)
Property / co-financing rate
 
55.0 percent
Amount55.0 percent
Unitpercent
Property / co-financing rate: 55.0 percent / rank
 
Normal rank
Property / budget
 
42,234,575.0 forint
Amount42,234,575.0 forint
Unitforint
Property / budget: 42,234,575.0 forint / rank
 
Normal rank
Property / budget
 
119,397.14 Euro
Amount119,397.14 Euro
UnitEuro
Property / budget: 119,397.14 Euro / rank
 
Preferred rank
Property / budget: 119,397.14 Euro / qualifier
 
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
Property / budget: 119,397.14 Euro / qualifier
 
point in time: 14 February 2022
Timestamp+2022-02-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / EU contribution
 
23,229,016.25 forint
Amount23,229,016.25 forint
Unitforint
Property / EU contribution: 23,229,016.25 forint / rank
 
Normal rank
Property / EU contribution
 
65,668.43 Euro
Amount65,668.43 Euro
UnitEuro
Property / EU contribution: 65,668.43 Euro / rank
 
Preferred rank
Property / EU contribution: 65,668.43 Euro / qualifier
 
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
Property / EU contribution: 65,668.43 Euro / qualifier
 
point in time: 14 February 2022
Timestamp+2022-02-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 22:57, 14 February 2022

Project Q3935255 in Hungary
Language Label Description Also known as
English
Energy renovation of “Polaris Yacht Apartments”
Project Q3935255 in Hungary

    Statements

    0 references
    23,229,016.25 forint
    0 references
    65,668.43 Euro
    0.002827 Euro
    14 February 2022
    0 references
    42,234,575.0 forint
    0 references
    119,397.14 Euro
    0.002827 Euro
    14 February 2022
    0 references
    55.0 percent
    0 references
    1 September 2020
    0 references
    31 March 2022
    0 references
    SADALSUUD Szállítmányozási és Kereskedelmi Korlátolt Felelősségű Társaság
    0 references
    0 references

    47°1'49.01"N, 18°0'56.09"E
    0 references
    Megtörténetek az előkészítő tevékenységek, amely alatt figyelembe vettük az épület adottságait és az elérni kívánt cél értékeket, majd eszerint az energetikus szakértővel bejártuk és egyeztettünk a helyszínről, a fejlesztés méretéről, és az épületgépészeti rendszer felépítéséről. Felmérésre került az épület hőtechnikai állapota és elkészült az energetikai tanúsítvány. Majd ezt követően az energetikai szakértő elkészítette számításait. A részletes elemzés kimutatta milyen beavatkozásokra van szükség és ezeknek milyen megtakarítási hatása van. Elkészült a statikai szakértői vélemény is, mellyel Sturucz Mihályt, a Pannon-Gádor Mérnöki Iroda Kft., szakértőjét bíztuk meg. A statikai szakvélemény, a helyszíni bejárást követően, a tapasztalatok alapján, valamint az épület energiaracionalizálási – nyílászáró csere, hőszigetelés, napelemes rendszer telepítése – terveinek ismeretében készültek el. Eredményül azt kaptuk, hogy az épület energetikai fejlesztése a teherhordó szerkezet figyelembevételével lehetséges, az épület tetőszerkezetének szerkezeti állapota megfelelő. Elkészültek a meglévő, illetve a tervezett állapotra a tervdokumentációk is az általunk megbízott építészmérnök tervező által. Előzetes tájékoztatást kértünk kivitelező cégektől a fejlesztés várható költségeire vonatkozóan. Az egyeztetés során a pályázati felhívás szerint meghatározott fajlagos költségeket figyelembe vettük. A tetőszerkezeten 130 db Corecomm SI CCSI-M 310-320W napelem panel kerül elhelyezésre. 64 db napelem panel a keleti tetőfelületen és 66 db napelem panel a nyugati tetőfelületen. A rendszer teljes mérete 40,3 kW. 2 db Fronius Symo 15.0-3-M és 1 db Fronius Symo 10.0-3-M inverter kerül elhelyezére. Az épület hagyományos nyeregtetős, a teljes épület tetején Bramac cserépfedés található. A lábazat szigetelése extrudált zártcellás hőszigeteléssel (Austrotherm XPS30) fog történni, 15 cm vastagságban. A homlokzati hőszigetelés EPS 80 hőszigetelőtáblákból dryvit rendszerként készült 15 cm vastagságban. A padlásfödém a meglévő gerendák közötti hőszigetelést 15 cm vastagságban üveggyapot filc hőszigeteléssel tervezzük kiegészíteni. A tetőtér függőleges és ferde felületeire a homlokzati hőszigeteléssel azonos anyagú és technológiájú 15 cm vastag belső utólagos hőszigetelés fog kerülni. A tervezett felújítás során az elavult, rossz műszaki állapotú fa homlokzati nyílászáró szerkezetek mindenhol lecserélésre kerülnek. Helyettük 3 rétegű fokozott hőszigetelésű (Uw (Hungarian)
    0 references
    The preparatory activities during which we took into account the characteristics of the building and the target values to be achieved, followed by a visit and consultation with the energetic expert about the location, the size of the development and the construction of the technical building system. The thermal condition of the building has been assessed and the energy certificate has been completed. Then the energy expert prepared his calculations. The in-depth analysis has shown what interventions are needed and the savings impact of these interventions. The static expert opinion was also prepared, which we commissioned Mihály Sturucz, the expert of Pannon-Gádor Engineering Office Ltd. The static expert opinion, following the on-site visit, based on the experience and the energy rationalisation plans of the building — replacement of doors and windows, thermal insulation and installation of a solar system — were prepared. As a result, we received that the energy development of the building is possible taking into account the load-bearing structure, the structural state of the roof structure of the building is appropriate. The design documentation for the existing and planned state has also been completed by the architect commissioned by us. We requested preliminary information from contractors on the expected costs of development. During the conciliation, the unit costs determined in accordance with the call for proposals were taken into account. 130 CORECOMM SI CCSI-M 310-320 W solar panels are installed on the roof. 64 solar panels on the eastern roof and 66 solar panels on the western roof surface. The overall size of the system is 40.3 kW. 2 Fronius SYMO 15.0-3-M and 1 Fronius SYMO 10.0-3-M inverters are installed. The building has a traditional saddle roof with Bramac tiles on top of the entire building. Insulation of the plinth will be done by extruded closed cell thermal insulation (Austrotherm XPS30) in a thickness of 15 cm. The facade thermal insulation is made of EPS 80 thermal insulation boards in 15 cm thickness as a dryvit system. The attic floor is designed to complement the thermal insulation between the existing beams in 15 cm thickness with felt thermal insulation. The vertical and inclined surfaces of the attic will be covered by 15 cm thick inner thermal insulation of the same material and technology as the facade thermal insulation. During the planned renovation, outdated wooden façades with poor technical condition will be replaced everywhere. Instead, 3 layers of enhanced thermal insulation (Uw) (English)
    8 February 2022
    0 references
    Les activités préparatoires au cours desquelles nous avons pris en compte les caractéristiques du bâtiment et les valeurs cibles à atteindre, suivies d’une visite et d’une consultation avec l’expert énergétique sur l’emplacement, la taille du développement et la construction du système technique du bâtiment. L’état thermique du bâtiment a été évalué et le certificat énergétique a été complété. Puis l’expert en énergie a préparé ses calculs. L’analyse approfondie a montré quelles interventions sont nécessaires et l’impact de ces interventions sur les économies. L’avis d’expert statique a également été préparé, que nous avons chargé Mihály Sturucz, l’expert de Pannon-Gádor Engineering Office Ltd. L’avis d’expert statique, à la suite de la visite sur place, fondé sur l’expérience et les plans de rationalisation énergétique du bâtiment — remplacement des portes et fenêtres, isolation thermique et installation d’un système solaire — a été élaboré. En conséquence, nous avons reçu que le développement énergétique du bâtiment est possible en tenant compte de la structure porteuse, l’état structurel de la structure du toit du bâtiment est approprié. La documentation de conception pour l’état actuel et prévu a également été complétée par l’architecte mandaté par nous. Nous avons demandé aux entrepreneurs des renseignements préliminaires sur les coûts de développement prévus. Lors de la conciliation, les coûts unitaires déterminés conformément à l’appel à propositions ont été pris en compte. 130 panneaux solaires CoreComm SI CCSI-M 310-320 W sont installés sur le toit. 64 panneaux solaires sur le toit est et 66 panneaux solaires sur la surface ouest du toit. La taille totale du système est de 40,3 kW. 2 onduleurs Fronius SYMO 15.0-3-M et 1 onduleurs Fronius SYMO 10.0-3-M sont installés. Le bâtiment a un toit traditionnel en selle avec des tuiles Bramac sur tout le bâtiment. L’isolation du socle se fera par isolation thermique à cellule fermée extrudée (Austrotherm XPS30) dans une épaisseur de 15 cm. L’isolation thermique de façade est faite de panneaux d’isolation thermique EPS 80 d’épaisseur 15 cm en tant que système Dryvit. Le plancher grenier est conçu pour compléter l’isolation thermique entre les poutres existantes d’une épaisseur de 15 cm avec une isolation thermique en feutre. Les surfaces verticales et inclinées du grenier seront recouvertes d’une isolation thermique intérieure de 15 cm d’épaisseur du même matériau et de la même technologie que l’isolation thermique de façade. Lors de la rénovation prévue, des façades en bois dépassées avec un mauvais état technique seront remplacées partout. Au lieu de cela, 3 couches d’isolation thermique améliorée (Uw) (French)
    10 February 2022
    0 references
    Balatonalmádi, Veszprém
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-02283
    0 references