Installation of solar system at Dancsi & Partner Ltd. Industrial Park site (Q3935206): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: fix budget)
(‎Removed claims)
Property / co-financing rate
55.0 percent
Amount55.0 percent
Unitpercent
 
Property / co-financing rate: 55.0 percent / rank
Normal rank
 
Property / budget
16,787,100.0 forint
Amount16,787,100.0 forint
Unitforint
 
Property / budget: 16,787,100.0 forint / rank
Normal rank
 
Property / budget
47,457.13 Euro
Amount47,457.13 Euro
UnitEuro
 
Property / budget: 47,457.13 Euro / rank
Preferred rank
 
Property / budget: 47,457.13 Euro / qualifier
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
 
Property / budget: 47,457.13 Euro / qualifier
point in time: 13 February 2022
Timestamp+2022-02-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / EU contribution
9,232,905.0 forint
Amount9,232,905.0 forint
Unitforint
 
Property / EU contribution: 9,232,905.0 forint / rank
Normal rank
 
Property / EU contribution
26,101.42 Euro
Amount26,101.42 Euro
UnitEuro
 
Property / EU contribution: 26,101.42 Euro / rank
Preferred rank
 
Property / EU contribution: 26,101.42 Euro / qualifier
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
 
Property / EU contribution: 26,101.42 Euro / qualifier
point in time: 13 February 2022
Timestamp+2022-02-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 22:56, 14 February 2022

Project Q3935206 in Hungary
Language Label Description Also known as
English
Installation of solar system at Dancsi & Partner Ltd. Industrial Park site
Project Q3935206 in Hungary

    Statements

    0 references
    1 July 2020
    0 references
    30 June 2022
    0 references
    Dancsi & Társa Általános Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság
    0 references
    0 references

    46°12'54.14"N, 20°28'30.36"E
    0 references
    A fejlesztés keretében a Társaság a makói telephelyén található iroda-kamionmosó épületére szeretne napelemes rendszert telepíteni. A beruházás kivitelezését a Vállalkozás 2020.07.01-2022.06.30. közötti időtartamban kívánja megvalósítani. A beruházási tevékenység nem engedélyköteles, a tervrajzok, a műszaki leírás rendelkezésre áll. A projekt keretében 49,83 kWp teljesítményű napelemes rendszer telepítése történik meg. A rendszer 1 db háromfázisú, 50 kW névleges teljesítményű Kaco Blueplanet 50.0 TL3 inverterből, továbbá 151 db, 330 Wp névleges teljesítményű, Risen RSM 120-6-330M típusú, monokristályos napelem modulból épül fel, felületük összesen 252,17 m2. A rendszer egyedi kialakítású, lapostetőre telepíthető alumínium tartószerkezetre kerül elhelyezésre, nagy szélterhelésnek is ellenálló rögzítéssel, ideális, déli tájolással és ~30°-os dőlésszöggel. A rendszer részét képezik továbbá kábelek/vezetékek elektromos szereléséhez szükséges anyagok. A projekt összköltsége 16.787.100,- Ft, amelyből a támogatás mértéke 9.232.905,- Ft, az önerő nagysága pedig 7.554.195,- Ft. Az önerő a Vállalkozás rendelkezésére áll. (Hungarian)
    0 references
    As part of the development, the Company would like to install a solar system on the building of the office-kamion washer located at its mako site. The Company intends to carry out the project between 01.07.2020-2022.06.30. The investment activity is not subject to authorisation, the drawings and technical specifications are available. The project involves the installation of a 49,83 kWp solar panel system. The system consists of 1 Kaco blueplanet 50.0 TL3 inverter of three-phase, 50 kW rated power, and 151 monocrystalline solar modules of type Risen RSM 120-6-330M with a nominal power of 330 Wp with a total surface area of 252.17 m². The system is placed on an aluminium support structure, which can be installed on a flat roof, with high wind load fastening, ideal south orientation and ~30° inclination. The system also includes materials for the electrical installation of cables/wires. The total cost of the project is HUF 16 787 100, of which the aid rate is HUF 9.232 905 and the amount of own resources is HUF 7.554.195. Own resources are at the disposal of the Company. (English)
    8 February 2022
    0 references
    Dans le cadre du développement, la Société souhaite installer un système solaire sur le bâtiment de la laveuse de bureau-Kamion située sur son site de mako. La Société a l’intention de réaliser le projet entre le 01.07.2020-2022.06.30. L’activité d’investissement n’est pas soumise à autorisation, les plans et les spécifications techniques sont disponibles. Le projet implique l’installation d’un système de panneaux solaires de 49,83 kWp. Le système se compose de 1 onduleur Kaco blueplanet 50.0 TL3 de puissance nominale triphasée, de 50 kW et de 151 modules solaires monocristallins de type Risen RSM 120-6-330M avec une puissance nominale de 330 Wp avec une surface totale de 252,17 m². Le système est placé sur une structure de support en aluminium, qui peut être installée sur un toit plat, avec une forte résistance au vent, une orientation idéale vers le sud et une inclinaison d’environ 30°. Le système comprend également des matériaux pour l’installation électrique de câbles/fils. Le coût total du projet s’élève à 16 787 100 HUF, dont le taux d’aide est de 9 232 905 HUF et le montant des ressources propres de 7 554,195 HUF. Les ressources propres sont à la disposition de la Société. (French)
    10 February 2022
    0 references
    Makó, Csongrád-Csanád
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-02202
    0 references