Energy modernisation of Adytum Kft. (8654 Ságvár — hrsz 0247/3) on site_x000D_ (Q3934542): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: fix budget) |
(Removed claims) |
||||||||||||||
Property / co-financing rate | |||||||||||||||
| |||||||||||||||
Property / co-financing rate: 55.0 percent / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 10,581,848.0 forint / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 29,914.88 Euro / rank | |||||||||||||||
Property / budget: 29,914.88 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 29,914.88 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 5,820,016.0 forint / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 16,453.19 Euro / rank | |||||||||||||||
Property / EU contribution: 16,453.19 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 16,453.19 Euro / qualifier | |||||||||||||||
|
Revision as of 22:41, 14 February 2022
Project Q3934542 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy modernisation of Adytum Kft. (8654 Ságvár — hrsz 0247/3) on site_x000D_ |
Project Q3934542 in Hungary |
Statements
15 February 2020
0 references
18 April 2021
0 references
ADYTUM Szolgáltató Korlátolt Felelősségű Társaság
0 references
116 db Jinko MAXIM 315 W-os monokristályos napelem modul, az egyenáram és a váltóáram közötti konverziót 1 db Sun Trio Plus 40K típusú, 3 fázisú inverter biztosítja, mely Wifi kommunikációra képes. A napelemek tetőszerkezeten elhelyezett tartószerkezetre kerülnek. Beépítésre kerülnek Túláram és túlfeszültség védelemi berendezések, valamint egyéb anyagok. A kivitelezési költség tartalmazza a rendszer elemeinek helyszínre szállítását, szakemberek által helyszíni összeszerelését és beüzemelését, valamint a hálózati szolgáltatónál lefolytatandó engedélyezési eljárást. A kábelezést úgy alakítjuk ki és úgy rögzítjük, hogy a szél és egyéb külső (hó, jég, stb.) hatások sehol se okozhassák a kábelezés megrongálódását, szigetelés sérülését. A napelemes rendszer kialakításánál az 54/2014 (XII. 5) BM rendelet az Országos Tűzvédelmi Szabályzat és a TvMI 7.2:2016.07.01. Tűzvédelmi Műszaki Irányelvben leírtak érvényesek és alkalmazottak! A napelem modulokból összeállított füzér (string), kialakításakor törekedünk arra, hogy alacsony intenzitású napsugárzás (~200 W/m2) esetén is az inverter működési tartományába essen a füzér feszültsége. Az inverterek a hálózati szolgáltató által jóváhagyott inverterek. Az inverterek telepítési helye az épületen belül található. A háztartási méretű kiserőmű a felhasználói hálózatra – túláramvédelmi készüléken keresztül fog csatlakozni, fix bekötéssel, az áramszolgáltató által meghatározott feltételek betartásával. (Hungarian)
0 references
116 pcs Jinko MAXIM 315 W monocrystalline solar module, the conversion between DC and AC is provided by 1 Pcs Sun Trio Plus 40K 3-phase inverter capable of Wifi communication. Solar panels are placed on a supporting structure on the roof. Installed over current and overvoltage protection equipment, as well as other materials. The construction cost includes the delivery of the components of the system to the site, the on-site assembly and installation of the system by professionals, as well as the authorisation procedure to be carried out at the network service provider. The wiring is designed and fixed in such a way that the wind and other external (snow, ice, etc.) effects cannot cause damage to the wiring or damage to insulation anywhere. For the design of the solar panel system, 54/2014 (XII. 5) BM Decree of the National Fire Protection Regulation and TVMI 7.2:2016.07.01. Fire Protection Technical Directive is valid and employees! When forming a string from solar modules, we strive to bring the voltage of the inverter into the operating range of the inverter even in the case of low intensity solar radiation (~200 W/m²). Inverters are inverters approved by the network provider. The installation of the inverters is located inside the building. The household-sized small power plant will connect to the user network via an overcurrent protection device, with fixed connection, subject to the conditions set by the power supplier. (English)
8 February 2022
0 references
116 PCs Jinko MAXIM 315 W module solaire monocristallin, la conversion entre DC et AC est fournie par 1 onduleur 3 phases Sun Trio Plus 40K capable de communication Wifi. Des panneaux solaires sont placés sur une structure de support sur le toit. Installé sur les équipements de protection contre les courants et les surtensions, ainsi que d’autres matériaux. Le coût de construction comprend la livraison des composants du système sur le site, l’assemblage et l’installation sur place du système par des professionnels, ainsi que la procédure d’autorisation à effectuer auprès du prestataire de services réseau. Le câblage est conçu et fixé de telle manière que le vent et les autres effets externes (neige, glace, etc.) ne puissent endommager le câblage ou endommager l’isolation. Pour la conception du système de panneaux solaires, 54/2014 (XII. 5) Décret BM du Règlement national sur la protection contre l’incendie et TVMI 7.2:2016.07.01. La directive technique de protection contre les incendies est valide et les employés! Lors de la formation d’une chaîne à partir de modules solaires, nous nous efforçons d’apporter la tension de l’onduleur dans la plage de fonctionnement de l’onduleur, même dans le cas d’un rayonnement solaire de faible intensité (~200 W/m²). Les onduleurs sont des onduleurs approuvés par le fournisseur de réseau. L’installation des onduleurs est située à l’intérieur du bâtiment. La petite centrale électrique de taille domestique se connecte au réseau utilisateur via un dispositif de protection contre les surintensités, avec connexion fixe, sous réserve des conditions fixées par le fournisseur d’électricité. (French)
10 February 2022
0 references
Ságvár, Somogy
0 references
Identifiers
GINOP-4.1.4-19-2020-01248
0 references