Property / co-financing rate | |||||||||||||||
| |||||||||||||||
Property / co-financing rate: 55.0 percent / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 34,381,000.0 forint / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 97,195.09 Euro / rank | |||||||||||||||
Property / budget: 97,195.09 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 97,195.09 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 18,909,550.0 forint / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 53,457.3 Euro / rank | |||||||||||||||
Property / EU contribution: 53,457.3 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 53,457.3 Euro / qualifier | |||||||||||||||
|
Revision as of 22:38, 14 February 2022
Project Q3934400 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | ATEX Ltd. complex energy development in Balassagyarmat |
Project Q3934400 in Hungary |
Statements
5 August 2020
0 references
30 June 2021
0 references
ATEX Ipari Elektronikai Kereskedelmi és Szolgáltató Korlátolt Felelősségü Társaság
0 references
Az Atex Kft. saját tulajdonú (1/1) székhelyén megvalósuló energetikai korszerűsítés az alábbiakat foglalja magában: HŐSZIGETELÉS 616m2 alapterületű csarnok külső felületének függőleges és vízszintes irányú hőszigetelése, nyílászárok cseréje, hőszigetelt kapuk beépítése. A felújítás során a függőleges külső falakban a teljes vasvázú ablak és kopilit üveg rendszer kibontásra kerülés helyére 100mM vastag szendvicspanel illetve műanyag nyílászárók kerülnek beépítésre a homlokzati rajznak megfelelően. A lapostető hőszigetelés javítása 100mm Eps lépésálló panel beépítésével hozható a kívánt értékre. A 2 db 3.2mx3.7m –es vasajtó lecserélése szekcionált kapura nagymértékben javítja az épület hőkomfortját a jó zárás és a hőszigetelése miatt. A felújítás eredményeként a csarnok hőigénye 40%-al csökken 50kwP-s NAPELEMRENDSZER TELEPÍTÉSE: Az épület tetejére telepítendő 50kwP-s napelem rendszer számításaink szerint /világítás korszerűsítéssel együtt / szinte teljes kiváltja az elektromos a felhasznált villamos energiát és mintegy 22 tonna Co2 megtakarítást eredményez. Világítás korszerűsítése A felújítás során lecserélésre kerülnek a világítótestek és vezetékek illetve szerelvényeik korszerűbb típusra. A gyártó tevékenységet jól szolgáló helyi megvilágítások tervezésével, optimális elhelyezéssel a világítás villamos energia igénye min:40%-kal csökkent. (A jelenlegi fogyasztás mintegy 16KWh) FŰTÉSI RENDSZER KORSZERŰSÍTÉSE A tervezett hőtechnikai korszerűsítésekkel és napelem kapacitással villamos fűtéssel oldjuk meg a csarnok fűtését. Ez magába foglalja a szükséges villamos elosztók csatlakozások kiépítését is. A gyors felfűtést nagyteljesítményű hőlégbefúvóval, a helyi fűtést infrapanelekkel illetve villamos fűtőtestekkel, radiátorral, fűtőpanel oldjuk meg. Ez a termelési struktúrához sokkal egyszerűbben használható, gyors, hatékony fűtési rendszer. A megvalósításra kerülő fejlesztés nem építési engedélyköteles beruházás, így a pályázat benyújtását, illetve bírálatát követően nincs akadálya a munkálatok megkezdésének. Az építési munkákat várhatóan 2020. áprilisában elkezdhetjük. A gyártó tevékenységünkhöz igazodva több munkafázisban (többszöri elszámolással) valósítjuk meg a beruházást. A projekt befejezéséig megtörténik az önálló energetikai mennyiség mérővel vagy almérővel történő felszerelése az ATEX Kft. tulajdonát képező, a beruházás helyszínéül szolgáló ingatlanon. A fejlesztés megvalósítását a kellő színvonalú munkavégzés érdekében, a pályázati kiírásnak megfelelően műszaki ellenőr közreműködésével tervezzük. A projekt befejező szakaszában a műszaki ellenőr nyilatkozatot tesz a beruházás keretében beépített berendezés(ek)ről, megvalósított fejlesztésekről. Ugyancsak csatoljuk a kiépített napelemes rendszerek megfelelőségét igazoló dokumentumokat is a projekt zárására. A projekt megvalósítása során a kötelező tájékoztatást és nyilvánosságot saját erőből biztosítjuk a projekt keretein kívül. A fejlesztés eredményeként épület energetikai besorolása az EE (Átlagosnál jobb) kategóriáról a BB (Közel nulla energiaigényre vonatkozó körülményeknek megfelelő) minősítésre változik. (Hungarian)
0 references
The energy modernisation of Atex Kft.'s own seat (1/1) includes the following: Thermal insulation, vertical and horizontal insulation of the outer surface of a 616 m² hall, replacement of hatch locks, installation of insulated gates. During the renovation, 100mM thick sandwich panels and plastic doors and windows are installed in the vertical exterior walls in accordance with the facade drawing. Repair of flat roof thermal insulation can be achieved by installing a 100 mm Eps step-proof panel to the desired value. The replacement of 2 pcs 3.2mx3.7 m iron doors with a sectional gate greatly improves the thermal comfort of the building due to good closure and thermal insulation. As a result of the renovation, the heat demand of the hall is reduced by 40 %: The 50kwP solar system to be installed on the roof of the building is calculated/with lighting upgrade/almost completely replaces the electricity used and generates about 22 tons of Co2 savings. During the renovation, luminaires and wiring and their fittings will be replaced by a more modern type. With the design of local illuminations that serve the production activity and optimal location, the need for electricity for lighting has been reduced min:40%-kal. (Current consumption is about 16KWh) CERTIFICATION OF THE SPECIAL SYSTEM The planned thermal upgrades and solar panel capacity provide electrical heating for the hall. This includes the installation of the necessary electrical distribution connections. Rapid heating is solved by high-performance heat blower, local heating is provided by infra-panels, electric heaters, radiators, heating panels. This is a much simpler, fast, efficient heating system for the production structure. The development to be carried out is not an investment subject to a construction permit, so after the submission or evaluation of the tender, there is no obstacle to the start of the works. Construction works are expected to start in April 2020. In line with our manufacturing activities, we carry out the investment in several working phases (multiple accounting). Until the completion of the project, the self-contained energy quantity is equipped with a meter or submeter on the property owned by ATEX Kft., where the investment takes place. We plan the implementation of the development with the assistance of a technical inspector in order to ensure the necessary quality of work, in accordance with the tender notice. At the end of the project, the technical inspector shall make a statement on the equipment(s) and developments implemented in the framework of the investment. We also attach documents proving the conformity of the installed solar systems to the closure of the project. During the implementation of the project, mandatory information and publicity are provided from our own resources outside the framework of the project. As a result of the development, the energy classification of the building will be changed from EE (better than average) to BB (corresponding to middle zero energy demand conditions). (English)
8 February 2022
0 references
La modernisation énergétique du siège d’Atex Kft. (1/1) comprend les éléments suivants: Isolation thermique, isolation verticale et horizontale de la surface extérieure d’un hall de 616 m², remplacement des écluses, installation de portails isolés. Lors de la rénovation, des panneaux sandwich de 100 mM d’épaisseur et des portes et fenêtres en plastique sont installées dans les murs extérieurs verticaux conformément au dessin de façade. La réparation de l’isolation thermique du toit plat peut être réalisée en installant un panneau de 100 mm Eps à la valeur souhaitée. Le remplacement des portes en fer de 2,2 mx3,7 m par une porte sectionnelle améliore considérablement le confort thermique du bâtiment en raison d’une bonne fermeture et d’une bonne isolation thermique. À la suite de la rénovation, la demande de chaleur du hall est réduite de 40 %: Le système solaire 50kwP à installer sur le toit du bâtiment est calculé/avec mise à niveau d’éclairage/remplace presque complètement l’électricité utilisée et génère environ 22 tonnes d’économies de CO2. Lors de la rénovation, les luminaires et le câblage et leurs raccords seront remplacés par un type plus moderne. Avec la conception d’éclairages locaux qui servent l’activité de production et l’emplacement optimal, le besoin d’électricité pour l’éclairage a été réduit min:40%-kal. (La consommation actuelle est d’environ 16KWh) CERTIFICATION DU SYSTÈME SPÉCIAL Les améliorations thermiques prévues et la capacité des panneaux solaires assurent le chauffage électrique du hall. Cela inclut l’installation des connexions de distribution électrique nécessaires. Le chauffage rapide est résolu par un ventilateur à haute performance, le chauffage local est assuré par des infra-panels, des chauffages électriques, des radiateurs, des panneaux chauffants. Il s’agit d’un système de chauffage beaucoup plus simple, rapide et efficace pour la structure de production. Le développement à réaliser n’est pas un investissement soumis à un permis de construction, de sorte qu’après la soumission ou l’évaluation de l’offre, il n’y a pas d’obstacle au début des travaux. Les travaux de construction devraient débuter en avril 2020. Conformément à nos activités manufacturières, nous effectuons l’investissement en plusieurs phases de travail (comptabilité multiple). Jusqu’à l’achèvement du projet, la quantité d’énergie autonome est équipée d’un compteur ou d’un sous-mètre sur la propriété appartenant à ATEX Kft., où l’investissement a lieu. Nous planifions la mise en œuvre du développement avec l’aide d’un inspecteur technique afin d’assurer la qualité nécessaire du travail, conformément à l’avis d’appel d’offres. À la fin du projet, l’inspecteur technique fait une déclaration sur le ou les équipements et les développements mis en œuvre dans le cadre de l’investissement. Nous joignons également des documents prouvant la conformité des systèmes solaires installés à la clôture du projet. Au cours de la mise en œuvre du projet, l’information et la publicité obligatoires sont fournies à partir de nos propres ressources en dehors du cadre du projet. À la suite de cette évolution, la classification énergétique du bâtiment passera de l’EE (meilleure que la moyenne) à BB (correspondant à des conditions de demande moyenne nulle). (French)
10 February 2022
0 references
Balassagyarmat, Nógrád
0 references
Identifiers
GINOP-4.1.4-19-2020-01047
0 references