B75 System Kft. energy development of the Szombathely commercial unit (Q3933868): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claims)
(‎Changed an Item: fix budget)
Property / co-financing rate
 
55.0 percent
Amount55.0 percent
Unitpercent
Property / co-financing rate: 55.0 percent / rank
 
Normal rank
Property / budget
 
10,342,200.0 forint
Amount10,342,200.0 forint
Unitforint
Property / budget: 10,342,200.0 forint / rank
 
Normal rank
Property / budget
 
29,237.4 Euro
Amount29,237.4 Euro
UnitEuro
Property / budget: 29,237.4 Euro / rank
 
Preferred rank
Property / budget: 29,237.4 Euro / qualifier
 
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
Property / budget: 29,237.4 Euro / qualifier
 
point in time: 14 February 2022
Timestamp+2022-02-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / EU contribution
 
5,688,210.0 forint
Amount5,688,210.0 forint
Unitforint
Property / EU contribution: 5,688,210.0 forint / rank
 
Normal rank
Property / EU contribution
 
16,080.57 Euro
Amount16,080.57 Euro
UnitEuro
Property / EU contribution: 16,080.57 Euro / rank
 
Preferred rank
Property / EU contribution: 16,080.57 Euro / qualifier
 
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
Property / EU contribution: 16,080.57 Euro / qualifier
 
point in time: 14 February 2022
Timestamp+2022-02-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 22:27, 14 February 2022

Project Q3933868 in Hungary
Language Label Description Also known as
English
B75 System Kft. energy development of the Szombathely commercial unit
Project Q3933868 in Hungary

    Statements

    0 references
    0 references
    5,688,210.0 forint
    0 references
    16,080.57 Euro
    0.002827 Euro
    14 February 2022
    0 references
    10,342,200.0 forint
    0 references
    29,237.4 Euro
    0.002827 Euro
    14 February 2022
    0 references
    55.0 percent
    0 references
    1 June 2020
    0 references
    31 March 2022
    0 references
    B75 SYSTEM Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság
    0 references
    0 references

    47°13'44.83"N, 16°37'7.54"E
    0 references
    Társaságunk eredményes gazdálkodásának fenntartásában az egyik sarkalatos pont a költségek minimalizálása, így többek közt az energiaköltségek mérséklése. Energetikai és építőipari szakemberekkel közösen elemeztük a saját tulajdonú kereskedelmi üzletünk kialakítását és meglévő gépészeti megoldásokat, és ez alapján alakítottuk ki az alábbi beruházási tervet. Pupp Péter építészmérnök állította össze a tervdokumentációt, aki a projekt során a műszaki ellenőrzés feladatát Pfliegler Attila látja el. Hivessy Géza az energetikai szakértő, és egyben tanúsító, az általa készített számítások, tanúsítványok csatolva az előírt mellékletek közt. A fejlesztés megvalósítását 2020. június 1. – 2021. december 31. időszakban tervezzük. Az alábbi energiahatékonyság javítási építési, korszerűsítési munkákra kerül sor: Fűtött és fűtetlen teret elválasztó, nem nyílászáró szerkezetnek minősülő épülethatároló szerkezetek hőszigetelése, 128 m2 felületen Polisztirolhab lemez függőleges szigetelés és 110m2 kőzetgyapot hőszigetelő lemez függőleges szigetelés. Emellett kicserélünk 10 db nyílászárót, 17,71m2 felületen. A beépítésre kerülő műanyag nyílászárók főbb jellemzői: Kömmerling 88mm tokvastagsággal, 6 légkamrás tokszerkezettel, 3 rétegű üvegezéssel. Fűtési- és/vagy használati melegvíz-rendszerek korszerűsítése, fűtési rendszer korszerűsítése valósul meg a közel 268m3 térben. A teljes kereskedelmi egységben tervezzük a beltéri világítási rendszer korszerűsítését, LED fényforrások beépítését 96,85 m2-en. Jelenleg elavult fénycsöves armatúra biztosítja a világítást, melynek fénytechnikai jellemzői karbantartással sem orvosolhatók. A tervezett korszerűsítés eredményeként a szabvány szerinti előírt megvilágosítási értéket érjük el, valamint jelentős működési költség megtakarítás keletkezik. A megújuló energiákat hasznosítjuk a létrejövő napelem rendszerben (6,12 kWp), valamint a levegő-víz hőszivattyú rendszerben (7,5kW). (Hungarian)
    0 references
    One of the key points in maintaining the effective management of our company is to minimise costs, including reducing energy costs. Together with energy and construction professionals, we analysed the development of our own commercial business and existing mechanical solutions, and based on this we have developed the following investment plan. Architect Péter Pupp compiled the design documentation, who performs the task of technical inspection during the project by Attila Pfliegler. Géza Hivessy is an energy expert and at the same time certifies, the calculations and certificates are attached to the required annexes. Implementation of development 1 June 2020 — Planned for 31 December 2021. The following energy efficiency improvement works will be carried out: Thermal insulation of heated and unheated building envelopes other than windows, 128 m² surface polystyrene foam vertical insulation and 110 m² rock wool thermal insulation plate. In addition, we replace 10 doors and windows on a 17.71 m² surface. Main characteristics of plastic doors and windows to be installed: Kömmerling with 88 mm frame thickness, 6 air chamber enclosures, 3 ply glazing. Modernisation of heating and/or domestic hot water systems and modernisation of heating system in the nearly 268 m³ space. In the entire commercial unit, we plan to upgrade the indoor lighting system and install LED light sources on 96.85 m². Currently, an outdated fluorescent armature provides lighting, the lighting characteristics of which cannot be remedied by maintenance. As a result of the planned upgrade, we achieve the required illumination value according to the standard and generate significant operating costs savings. Renewable energies are utilised in the resulting solar panel system (6,12 kWp) and in the air-to-water heat pump system (7.5 kW). (English)
    8 February 2022
    0 references
    L’un des points clés du maintien de la gestion efficace de notre entreprise est de minimiser les coûts, y compris la réduction des coûts énergétiques. En collaboration avec des professionnels de l’énergie et de la construction, nous avons analysé le développement de notre propre activité commerciale et des solutions mécaniques existantes, et nous avons développé le plan d’investissement suivant. L’architecte Péter Pupp a compilé la documentation de conception, qui effectue la tâche d’inspection technique au cours du projet par Attila Pfliegler. Géza Hivessy est experte en énergie et certifie en même temps, les calculs et les certificats sont joints aux annexes requises. Mise en œuvre du développement 1er juin 2020 — Prévue pour le 31 décembre 2021. Les travaux d’amélioration de l’efficacité énergétique suivants seront réalisés: Isolation thermique des enveloppes de bâtiments chauffées et non chauffées autres que les fenêtres, isolation verticale en mousse de polystyrène de 128 m² et plaque d’isolation thermique en laine de roche de 110 m². En outre, nous remplaçons 10 portes et fenêtres sur une surface de 17,71 m². Caractéristiques principales des portes et fenêtres en plastique à installer: KÖMMERLING avec cadre de 88 mm d’épaisseur, 6 boîtiers de chambre d’air, 3 vitrages. Modernisation des systèmes de chauffage et/ou d’eau chaude sanitaire et modernisation du système de chauffage dans l’espace de près de 268 m³. Dans l’ensemble de l’unité commerciale, nous prévoyons d’améliorer le système d’éclairage intérieur et d’installer des sources lumineuses LED sur 96,85 m². Actuellement, une armature fluorescente dépassée fournit un éclairage dont les caractéristiques d’éclairage ne peuvent être corrigées par l’entretien. Grâce à la mise à niveau prévue, nous obtenons la valeur d’éclairage requise selon la norme et nous générons d’importantes économies de coûts d’exploitation. Les énergies renouvelables sont utilisées dans le système de panneaux solaires (6,12 kWc) et dans le système de pompe à chaleur air-eau (7,5 kW). (French)
    10 February 2022
    0 references
    Szombathely, Vas
    0 references

    Identifiers

    GINOP-4.1.4-19-2019-00330
    0 references