BNF Mosonmagyaróvár Solar Panel System (Q3933665): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: fix budget) |
(Removed claims) |
||||||||||||||
Property / co-financing rate | |||||||||||||||
| |||||||||||||||
Property / co-financing rate: 55.0 percent / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 13,884,300.0 forint / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 39,250.92 Euro / rank | |||||||||||||||
Property / budget: 39,250.92 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 39,250.92 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 7,636,365.0 forint / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 21,588.0 Euro / rank | |||||||||||||||
Property / EU contribution: 21,588.0 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 21,588.0 Euro / qualifier | |||||||||||||||
|
Revision as of 22:22, 14 February 2022
Project Q3933665 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | BNF Mosonmagyaróvár Solar Panel System |
Project Q3933665 in Hungary |
Statements
30 June 2020
0 references
2 September 2020
0 references
BNF Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság
0 references
A Projekt célja az épület tetőszerkezetén napelemes rendszer megvalósítása saját villamosenergia igény kielégítése céljából. A Projekt során kiépítésre kerülő napelemes rendszer összesen 160 db 320 Wp teljesítményű napelem panelt (51200 Wp) és 1 db Fronius Symo 20,0-3-M típusú 20,0 kVA teljesítményű és 1 db Fronius ECO 25.0-3-S típusú 25,0 teljesítményű (összeteljesítmény 45,0 kVA) invertert tartalmaz. A megépítendő napelemes rendszer a helyben elérhető megújuló energiaforrások hasznosítását támogatja, így környezetkímélő, független és hosszú távon is fenntartható energiaellátást biztosít. A fejlesztés energetikai szakemberek dokumentált javaslataira épülő energiatermelő rendszer létrehozására irányul, ahol a helyi adottságok, a célszerűség és költséghatékonyság alapján lettek kiválasztva a felhasznált technológia és a berendezések. (Hungarian)
0 references
The aim of the project is to implement a solar system on the roof of the building in order to meet its own electricity demand. A total of 160 solar panels (51200 Wp) and 1 Fronius SYMO 20.0-3-M type 20.0 kVA and 1 Fronius ECO 25.0-3-S 25.0 KVA (total power 45,0 kVA) inverter are included in a total of 160 solar panels with 320 Wp power (51200 Wp) and 1 Fronius ECO 25.0-3-S (combined power 45.0 kVA) inverter. The solar system to be built supports the use of locally available renewable energy sources, thus ensuring an environmentally sound, independent and sustainable energy supply in the long term. The development aims to create an energy production system based on documented proposals of energy professionals, where the technology and equipment used were selected on the basis of local conditions, expediency and cost-effectiveness. (English)
8 February 2022
0 references
L’objectif du projet est de mettre en place un système solaire sur le toit du bâtiment afin de répondre à sa propre demande d’électricité. Un total de 160 panneaux solaires (51200 Wp) et 1 onduleur Fronius SYMO 20.0-3-M type 20.0 kVA et 1 Fronius ECO 25.0-3-S 25,0 KVA (puissance totale 45,0 kVA) sont inclus dans un total de 160 panneaux solaires avec 320 Wp (51200 Wp) et 1 Fronius ECO 25.0-3-S (puissance combinée 45,0 kVA). Le système solaire à construire favorise l’utilisation de sources d’énergie renouvelables disponibles localement, garantissant ainsi un approvisionnement énergétique écologiquement rationnel, indépendant et durable à long terme. Le développement vise à créer un système de production d’énergie basé sur des propositions documentées de professionnels de l’énergie, où la technologie et l’équipement utilisés ont été sélectionnés en fonction des conditions locales, de l’opportunité et du rapport coût-efficacité. (French)
10 February 2022
0 references
Mosonmagyaróvár, Győr-Moson-Sopron
0 references
Identifiers
GINOP-4.1.4-19-2019-00072
0 references