Infrastructure development of the Saint Philippine Catholic Primary School of Néri (Q3903526): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claims)
(‎Changed an Item: fix budget)
Property / co-financing rate
 
85.0 percent
Amount85.0 percent
Unitpercent
Property / co-financing rate: 85.0 percent / rank
 
Normal rank
Property / budget
 
156,558,417.0 forint
Amount156,558,417.0 forint
Unitforint
Property / budget: 156,558,417.0 forint / rank
 
Normal rank
Property / budget
 
442,590.64 Euro
Amount442,590.64 Euro
UnitEuro
Property / budget: 442,590.64 Euro / rank
 
Preferred rank
Property / budget: 442,590.64 Euro / qualifier
 
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
Property / budget: 442,590.64 Euro / qualifier
 
point in time: 14 February 2022
Timestamp+2022-02-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / EU contribution
 
133,074,654.45 forint
Amount133,074,654.45 forint
Unitforint
Property / EU contribution: 133,074,654.45 forint / rank
 
Normal rank
Property / EU contribution
 
376,202.05 Euro
Amount376,202.05 Euro
UnitEuro
Property / EU contribution: 376,202.05 Euro / rank
 
Preferred rank
Property / EU contribution: 376,202.05 Euro / qualifier
 
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
Property / EU contribution: 376,202.05 Euro / qualifier
 
point in time: 14 February 2022
Timestamp+2022-02-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:50, 14 February 2022

Project Q3903526 in Hungary
Language Label Description Also known as
English
Infrastructure development of the Saint Philippine Catholic Primary School of Néri
Project Q3903526 in Hungary

    Statements

    0 references
    133,074,654.45 forint
    0 references
    376,202.05 Euro
    0.002827 Euro
    14 February 2022
    0 references
    156,558,417.0 forint
    0 references
    442,590.64 Euro
    0.002827 Euro
    14 February 2022
    0 references
    85.0 percent
    0 references
    1 March 2019
    0 references
    30 November 2020
    0 references
    Debrecen-Nyíregyházi Egyházmegye
    0 references
    0 references

    47°37'21.54"N, 22°4'5.16"E
    0 references
    A támogatást igénylő jelen pályázat keretében a Debrecen-Nyíregyházi Egyházmegye (4024 Debrecen, Varga utca 4.). 1993.május 31-én II. János Pál pápa a Hungarorum Gens kezdetű apostoli konstitúcióval megalapította a Debrecen – Nyíregyházi Egyházmegyét. Az újonnan alapított püspökség székesegyháza a Debrecenben épült, Szent Anna tiszteletére felszentelt plébániatemplom, míg a társszékesegyháza Nyíregyházán a Magyarok Nagyasszonya tiszteletére szentelt plébániatemplom lett. Az új egyházmegye első püspöke, Bosák Nándor 1993.május 31-én kapta meg kinevezését. Ugyanebben az évben június 15-én szentelték püspökké Debrecenben. Az új egyházmegyét Szent László király oltalmába helyezték, így ő lett az új alapítás védőszentje. Fejlesztésben érintett intézmény bemutatása: A fejlesztésben érintett szervezet a Néri Szent Fülöp Katolikus Általános Iskola. Az Intézmény 2016. 09. 01-jéig a KLIK Nyíradonyi Tankerülete fennhatósága alá tartozott és Fülöpi Általános Iskola néven működött. 2016 tavaszán szülői kezdeményezés alapján kezdték szervezni azt, hogy egyházi iskolává váljanak. Számtalan akadályba ütköztek, de példaértékű összefogás alapján (önkormányzat- pedagógusok – szülők) sikerült elérniük, hogy 2016 szeptemberétől a fenntartó a Debrecen-Nyíregyházi Egyházmegye legyen, így katolikus iskolává alakultak. Az Intézmény székhelye Fülöpön, a Kossuth u. 30. sz. alatt található, területe 2561 m2. Évfolyamonként egy-egy osztály van, így összesen 8 osztály. Az iskola területén jelenleg egy (töredezett) betonú iskolaudvar, egy füves hátsó udvar és egy 1 emeletes épület található. Az épület két részben épült. Az első rész 1995-ben, a tornaterem utólag lett az osztálytermekhez hozzáépítve 1998-ban. 2011-ig az iskola két épületből állt. Egyik épület a bejárattól balra található, az alsó tagozatos diákoknak korábban helyet adó 4 osztálytermet, nevelői szobát és iskolai könyvtárhelyiséget tartalmazó épületrész. A másik épület a már korábban említett egy emeletes épület, melyben eredetileg valójában csak 4 osztályterem volt a 4 felsős osztály részére. A projekt tervezett fejlesztések összefoglalása: - Sportudvar felújítása - Tornaterem belső felújítása - Napelemes rendszer telepítése - Akadálymentesítés - Eszközbeszerzés Projekt céljai: - diákok és pedagógusok elégedettségének fokozása, - az intézmények gazdasági stabilitásának fenntartása, - az oktatás hatékonyságának fokozása, - az intézmény infrastruktúrájának javítása - diákok és pedagógusok komfortérzetének növelése - minőségi oktatási körülmények megteremtése - mindennapos testnevelés feltételeinek megteremtése (Hungarian)
    0 references
    The Debrecen-Nyíregyházai Diocese (4024 Debrecen, Varga utca 4.) is the framework of this application. On 31 May 1993, II. Pope John Paul founded Debrecen — Nyíregyházai Diocese with the Apostolic Constituency of Hungarorum Gens. The cathedral of the newly founded bishopric is the parish church built in Debrecen, consecrated in honour of Saint Anna, and the parish church dedicated to the Great Lady of Hungarians in Nyíregyháza. The first bishop of the new diocese, Nándor Bosák, was appointed on May 31, 1993. In the same year, he was consecrated to bishops in Debrecen on 15 June. The new diocese was placed under the protection of King Saint László, so he became the patron saint of the new foundation. Description of the institution involved in development: The organisation involved in the development is Néri St. Philip Catholic Elementary School. The Institution 2016. 09. Until 01, it was under the jurisdiction of KLIK Nyíradonyi Tan District and operated as the Philippine Primary School. In the spring of 2016, they started organising it on the basis of a parent’s initiative to become a church school. They encountered countless obstacles, but based on exemplary cooperation (municipal educators — parents) they managed to achieve the maintenance from September 2016 as the Debrecen-Nyíregyháza Diocese, so they became a Catholic school. The seat of the Institution is located in Philippines, at Kossuth Street 30, with an area of 2 561 m². There are only one class per grade, so there are 8 classes in total. There is currently a (fragmented) concrete school yard, a grassy backyard and a 1-story building. The building was built in two parts. The first part was built in 1995, the gym was added to the classrooms in 1998. Until 2011, the school consisted of two buildings. One of the buildings is located to the left of the entrance, comprising the 4 classrooms, educational rooms and school library rooms previously hosted for underprimary students. The other building is the one-storey building previously mentioned, in which there were only 4 classrooms for the 4 upper classrooms. Summary of the planned developments of the project: — Refurbishment of the sports yard — Interior refurbishment of the gym — Installation of a solar panel system — Accessibility — Purchase of equipment Project objectives: — increasing the satisfaction of students and teachers, — maintaining the economic stability of institutions, — increasing the efficiency of education, — improving the infrastructure of the institution — improving the comfort of students and teachers — creating quality educational conditions — creating conditions for everyday physical education (English)
    8 February 2022
    0 references
    Die Diözese Debrecen-Nyíregyházai (4024 Debrecen, Varga utca 4.) ist der Rahmen dieser Anwendung. Am 31. Mai 1993, II. Papst Johannes Paul gründete die Diözese Debrecen – Nyíregyházai mit dem Apostolischen Wahlkreis Hungarorum Gens. Die Kathedrale des neu gegründeten Bistums ist die Pfarrkirche in Debrecen, die zu Ehren der heiligen Anna geweiht wurde, und die Pfarrkirche, die der Großen Frau der Ungarn in Nyíregyháza gewidmet ist. Der erste Bischof der neuen Diözese, Nándor Bosák, wurde am 31. Mai 1993 ernannt. Im selben Jahr wurde er am 15. Juni den Bischöfen in Debrecen geweiht. Die neue Diözese wurde unter den Schutz des Heiligen László gestellt, so dass er Schutzpatron der neuen Stiftung wurde. Beschreibung der Einrichtung, die an der Entwicklung beteiligt ist: Die Organisation, die an der Entwicklung beteiligt ist, ist Néri St. Philip Catholic Elementary School. Das Organ 2016. 09. Bis 01 war es unter der Gerichtsbarkeit des Bezirks KLIK Nyíradonyi Tan und die philippinische Grundschule. Im Frühjahr 2016 begannen sie, es auf der Grundlage der Initiative eines Elternteils, eine Kirchenschule zu werden, zu organisieren. Sie stießen auf unzählige Hindernisse, aber basierend auf der beispielhaften Zusammenarbeit (Gemeinde Erzieher – Eltern) gelang es ihnen, den Unterhalt ab September 2016 als Diözese Debrecen-Nyíregyháza zu erreichen, so dass sie eine katholische Schule wurden. Der Sitz der Institution befindet sich auf den Philippinen, an der Kossuth Street 30, mit einer Fläche von 2 561 m². Es gibt nur eine Klasse pro Klasse, also gibt es insgesamt 8 Klassen. Derzeit gibt es einen (fragmentierten) Betonschulhof, einen grasigen Hinterhof und ein 1-stöckiges Gebäude. Das Gebäude wurde in zwei Teilen gebaut. Der erste Teil wurde 1995 gebaut, das Fitnessstudio wurde 1998 in die Klassenzimmer aufgenommen. Bis 2011 bestand die Schule aus zwei Gebäuden. Eines der Gebäude befindet sich links vom Eingang, bestehend aus den 4 Klassenzimmern, Bildungsräumen und Schulbibliotheksräumen, die zuvor für Unterschüler untergebracht waren. Das andere Gebäude ist das einstöckige Gebäude, in dem es nur 4 Klassenzimmer für die 4 oberen Klassenzimmer gab. Zusammenfassung der geplanten Projektentwicklungen: — Renovierung des Sporthofs – Innenrenovierung des Fitnessraums – Installation eines Solarpaneelsystems – Zugänglichkeit – Anschaffung von Ausrüstung Projektziele: — Erhöhung der Zufriedenheit von Schülern und Lehrern, – Wahrung der wirtschaftlichen Stabilität der Institutionen, – Steigerung der Effizienz der Bildung, – Verbesserung der Infrastruktur der Einrichtung – Verbesserung des Komforts von Schülern und Lehrern – Schaffung hochwertiger Bildungsbedingungen – Schaffung von Bedingungen für die tägliche körperliche Bildung (German)
    9 February 2022
    0 references
    Le Diocèse Debrecen-Nyíregyházai (4024 Debrecen, Varga utca 4) est le cadre de cette application. Le 31 mai 1993, II. Le pape Jean Paul a fondé le Diocèse Debrecen — Nyíregyházai avec la constituence apostolique de Hungarorum Gens. La cathédrale de l’évêché nouvellement fondée est l’église paroissiale construite à Debrecen, consacrée en l’honneur de Sainte-Anna, et l’église paroissiale dédiée à la Grande Dame des Hongrois à Nyíregyháza. Le premier évêque du nouveau diocèse, Nándor Bosák, a été nommé le 31 mai 1993. La même année, il est consacré aux évêques de Debrecen le 15 juin. Le nouveau diocèse a été placé sous la protection du roi Saint László, de sorte qu’il est devenu le saint patron de la nouvelle fondation. Description de l’institution participant au développement: L’organisation impliquée dans le développement est l’école primaire catholique Néri St. Philip. L’institution 2016. 09. Jusqu’en 01, elle était sous la juridiction du district de KLIK Nyíradonyi Tan et fonctionnait en tant qu’école primaire philippine. Au printemps 2016, ils ont commencé à l’organiser sur la base de l’initiative d’un parent de devenir une école ecclésiastique. Ils ont rencontré d’innombrables obstacles, mais sur la base d’une coopération exemplaire (éducateurs municipaux — parents) ils ont réussi à obtenir l’entretien à partir de septembre 2016 en tant que Diocèse Debrecen-Nyíregyháza, de sorte qu’ils sont devenus une école catholique. Le siège de l’Institution est situé aux Philippines, à Kossuth Street 30, d’une superficie de 2 561 m². Il n’y a qu’une classe par grade, donc il y a 8 classes au total. Il y a actuellement une cour d’école en béton (fragmentée), une cour arrière herbeuse et un bâtiment d’un étage. Le bâtiment a été construit en deux parties. La première partie a été construite en 1995, le gymnase a été ajouté aux salles de classe en 1998. Jusqu’en 2011, l’école se composait de deux bâtiments. L’un des bâtiments est situé à gauche de l’entrée, comprenant les 4 salles de classe, les salles d’enseignement et les salles de bibliothèque scolaires précédemment hébergées pour les étudiants sous-primaires. L’autre bâtiment est le bâtiment d’un étage mentionné précédemment, dans lequel il n’y avait que 4 salles de classe pour les 4 classes supérieures. Résumé des développements prévus du projet: — Remise à neuf de la cour de sport — Rénovation intérieure de la salle de sport — Installation d’un système de panneaux solaires — Accessibilité — Achat d’équipements Objectifs du projet: — accroître la satisfaction des étudiants et des enseignants, — maintenir la stabilité économique des établissements, — accroître l’efficacité de l’éducation, — améliorer l’infrastructure de l’établissement — améliorer le confort des étudiants et des enseignants — créer des conditions éducatives de qualité — créer les conditions d’une éducation physique quotidienne (French)
    10 February 2022
    0 references
    Fülöp, Hajdú-Bihar
    0 references

    Identifiers

    EFOP-4.1.5-16-2017-00031
    0 references