Energy modernisation of the office building of the Municipality of Kunszentmárton (Q3951131): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Adding French translations)
(‎Removed claims)
Property / co-financing rate
84.999999 percent
Amount84.999999 percent
Unitpercent
 
Property / co-financing rate: 84.999999 percent / rank
Normal rank
 
Property / EU contribution
109,240,560 forint
Amount109,240,560 forint
Unitforint
 
Property / EU contribution: 109,240,560 forint / rank
Normal rank
 
Property / EU contribution
302,073.09 Euro
Amount302,073.09 Euro
UnitEuro
 
Property / EU contribution: 302,073.09 Euro / rank
Preferred rank
 
Property / EU contribution: 302,073.09 Euro / qualifier
exchange rate to Euro: 0.00276521 Euro
Amount0.00276521 Euro
UnitEuro
 
Property / EU contribution: 302,073.09 Euro / qualifier
point in time: 6 December 2021
Timestamp+2021-12-06T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / budget
351,320.931 Euro
Amount351,320.931 Euro
UnitEuro
 
Property / budget: 351,320.931 Euro / rank
Preferred rank
 
Property / budget: 351,320.931 Euro / qualifier
exchange rate to Euro: 0.0027336256 Euro
Amount0.0027336256 Euro
UnitEuro
 
Property / budget: 351,320.931 Euro / qualifier
point in time: 15 December 2021
Timestamp+2021-12-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / budget
128,518,305.882 forint
Amount128,518,305.882 forint
Unitforint
 
Property / budget: 128,518,305.882 forint / rank
Normal rank
 

Revision as of 17:01, 13 February 2022

Project Q3951131 in Hungary
Language Label Description Also known as
English
Energy modernisation of the office building of the Municipality of Kunszentmárton
Project Q3951131 in Hungary

    Statements

    0 references
    1 February 2018
    0 references
    31 December 2019
    0 references
    KUNSZENTMÁRTON VÁROS ÖNKORMÁNYZATA
    0 references
    0 references

    46°50'45.20"N, 20°17'2.44"E
    0 references
    Projekt költségeit a Jászapáti, Karcagi, Kunhegyesi, Kunszentmártoni, Törökszentmiklósi járások számára elkülönített indikatív keretösszeg terhére kívánjuk elszámolni. A Projekt teljesíti a felhívás 3.2 pontjában előírt feltételeket. A Projekt teljesíti a felhívás 4.4 tartalmi értékelési szempontok pontjában előírt feltételeket , továbbá teljesülnek a terület-specifikus értékelési szempontok. 2. A projekt céljának, indokoltságának bemutatása (max. 2000 karakter) 2.1. A megoldandó probléma, a fejlesztési igény bemutatása. (Miért van szükség a fejlesztésre? Illeszkedés a TOP céljaihoz, szakmai indokoltság, igény, megalapozottság.) Jelen projektben a Kunszentmárton Város Önkormányzatának hivatali épülete (Köztársaság tér 8. Hrsz. 1.) épületének energetikai korszerűsítése épül. A projekt célja az Önkormányzat hivatali épületének energetikai korszerűsítése. Az épület állapota elhasznált, energetikai rendszere elavult, az energiafelhasználás jelentős, fenntartási költségei kimagaslóak, ezért szükséges az energetikai korszerűsítés. A projekt megvalósítása során az alábbi tevékenységek elvégzése indokolt: - homlokzat részleges hőszigetelése, - padlásfödém hőszigetelése, - fűtési rendszer korszerűsítése, - homlokzati nyílászárók cseréje, - napelemes rendszer telepítése, A TOP 3.2.1. pályázati kiírásra benyújtott projekt keretében az Önkormányzat a Hivatal épületének energetikai racionalizálásáról döntött. A projekt célja, az épület korszerű szabványoknak megfelelő hőszigetelése és energetikai, fűtési rendszerének korszerűsítése, homlokzati nyílászáróinak cseréje és napelemes rendszer - maximum HMKE méretű - telepítése. TOP-3.2.1-15 felhívás esetén részletes kifejtést kérünk arra vonatkozóan, hogy a projekt hogyan illeszkedik a területi szereplő által a terület-specifikus mellékletben foglalt értékelési szempontrendszer értékelési szempontjaihoz! a) A megvalósuló fejlesztés illeszkedésének mértéke a hatályos Jász-Nagykun-Szolnok Megyei Területfejlesztési Programhoz: JNSZ Megyei Közgyűlés 75/2014. (VIII.29.) számú határozatával elfogadta a Jász-Nagykun-Szolnok Megyei Területfejlesztési Programot, melyben a 35. oldalon jelen fejlesztés témaköre megnevezésre kerül a 4.1. pontban: Zöldgazdaság feltételeinek megteremtése, azon belül a 4.1.1 Megújuló és alternatív energiatermelést szolgáló fejlesztések. Jelen projekt keretében megvalósításra kerül az épület homlokzati – részleges - és födém – teljes körű - hőszigetelése, valamint a gépészeti korszerűsítés és a homlokzati nyílászárók cseréje, valamint a maximum HMKE méretű napelemes rendszer telepítése valósul meg. A Területfejlesztési Program céljainak jelen fejlesztés teljes mértékben megfelel. b) A fejlesztéssel érintett ingatlan energetikai korszerűsítésére mikor került utoljára sor? Mint a Projektterv mellékleteként csatolt fotódokumentáció is mutatja a fejlesztésbe bevont épület teljes körű energetikai korszerűsítésére építése óta (mely korábbi, mint a pályázat benyújtását megelőző 10 év) nem került sor. c) A projekt a kedvezményezett járások besorolásáról szóló Kormányrendelet, vagy a kedvezményezett települések besorolásáról szóló 105/2015. (IV. 23.) Kormányrendelet értelmében kedvezményezett, fejlesztendő vagy komplex programmal fejlesztendő járásban valósul meg: Kunszentmárton a Kunszentmártoni járásban található. A járás a 290/2014. (XI. 26.) Korm. rendelet a kedvezményezett járások besorolásáról törvény értelmében a Fejlesztendő járásba sorolt. d) A fejlesztés eredményeként elért energiamegtakarítás mértéke az elmúlt 3 év átlagához viszonyítva e) Az energiafogyasztás mintegy harmada az épületnek a beruházást követően. A jelenlegi 2 006,12 GJ-ról 609,33 GJ-ra csökken az energiafelhasználás, a megtakarítás 1 396,79 GJ f) A tervezett fejlesztéshez kapcsolódik-e az energiahordozó előállításához, feldolgozásához köthető élőmunkaigényes egyéb helyi fejlesztés Jelen fejlesztés tekintetében nem köthető élőmunkaigényes fejlesztés az energiahordozó előállításához 2.2. A projekt hosszú távú közvetlen és közvetett céljai és elvárt eredményei. A kitűzött hosszú távú célok Kunszentmárton Városban egyrészt a fejlesztés tárgyát képező ingatlan/intézmény épületének energiaellátás biztonságának megteremtése és a költségmegtakarítások révén a foglalkoztatottságának növelése, valamint zöld szemléletformálásának elősegítése alternatív energiaforrások és energiahatékony megoldások alkalmazásával a térség felzárkóztatásáért. Másrészt egy fenntartható fejlődési tendencia kialakítása elsősorban a gazdasági és társadalmi szférában, az épület energetikai korszerűsítése illetve a megújuló energiaforrást hasznosító technológia alkalmazása révén. A Projekt a Felhívás 3.1 hpontja alapján a következő tevékenységeket tartalmazza: 3.1.1. alapján a) és d); 3.1.2.1. alapján a); c); d); 3.1.2.2. alapján a) Helyhiány miatt a további adatokat a Projektterv tartalmazza (Hungarian)
    0 references
    The project costs will be charged from the indicative allocation for the districts of Jászapáti, Karcagi, Kunhegyesi, Kunszentmártoni, Törökszentmiklós. The Project fulfils the conditions set out in point 3.2 of the call. The project fulfils the conditions set out in point 4.4 of the call for proposals, and the area-specific assessment criteria are met. 2. Description of the purpose and justification of the project (max. 2000 characters) 2.1. The problem to be solved, the need for development. (Why is the development needed? In the present project the official building of the Municipality of Kunszentmárton City (Republic Square 8.) Hrv. 1.) the energy renovation of its building is under construction. The aim of the project is the energy modernisation of the municipal office building. The state of the building is used up, its energy system is outdated, the significant maintenance costs of the energy use are outstanding, therefore energy modernisation is necessary. During the implementation of the project, the following activities should be carried out: — partial thermal insulation of facades, — thermal insulation of attic floors, — modernisation of heating system, — replacement of facade doors and windows, — installation of solar panel system, In the framework of the project submitted for tender TOP 3.2.1, the Municipality decided to rationalise the energy of the Office’s building. The aim of the project is to insulate the building in accordance with state-of-the-art standards and to modernise its energy and heating system, to replace its facade doors and to install a solar panel system with a maximum size of HMKE. In case of call Top-3.2.1-15, please explain in detail how the project fits with the evaluation criteria of the evaluation criteria set out in the area-specific annex by the territorial actor. a) The degree of integration of the implemented development with the current Jász-Nagykun-Szolnok County Regional Development Programme: JNSZ County Assembly 75/2014. (VIII.29.) adopted the Jász-Nagykun-Szolnok County Regional Development Programme, in which the topic of the development on page 35 is described in point 4.1: Creating the conditions for a green economy, including 4.1.1 Developments for renewable and alternative energy production. In the framework of this project, the complete thermal insulation of the facade of the building — partial and slab — will be realised, as well as the mechanical modernisation and the replacement of facade doors, as well as the installation of a solar panel system of the maximum size of HMKE. This development fully complies with the objectives of the Territorial Development Programme. B) When was the last time the energy modernisation of the property affected by the development took place? As the photo documentation attached as an annex to the Project Plan shows the complete energy modernisation of the building involved in the development (which was earlier than 10 years prior to the submission of the application) the project has not taken place since its construction. c) The project is the Government Decree on the classification of the beneficiary districts, or 105/2015. (IV. 23.) According to the Government Decree, it is implemented in districts that are to be developed or developed by a complex programme: Kunszentmárton is located in the district of Kunszentmárton. The gait is 290/2014. (XI. 26) Government Decree No 26/2001 on the classification of the beneficiary districts has been classified in the district to be developed in accordance with the Act. D) The amount of energy savings achieved as a result of the development compared to the average of the last 3 years e) Energy consumption is about a third of the building after the investment. Energy consumption is reduced from the current 2 006,12 GJ to 609,33 GJ, the savings are 1 396,79 GJ f) Does the planned development relate to the production of the energy carrier and other live labour intensive local development linked to the processing of the energy carrier. The long-term direct and indirect objectives and expected results of the project. The long-term goals set in Kunszentmárton City are on the one hand to ensure the security of energy supply of the building under development and to increase employment through cost savings and to promote green awareness through the use of alternative energy sources and energy-efficient solutions for the catching up of the area. On the other hand, developing a sustainable development trend, especially in the economic and social sphere, through energy renovation of the building and the use of renewable energy technology. Based on point 3.1 of the Call, the Project includes the following activities: Based on 3.1.1 (a) and (d); According to 3.1.2.1 a); C); D); 3.1.2.2. based on a) Further data are included in the Project Plan due to lack of space (English)
    9 February 2022
    0 references
    Les coûts du projet seront imputés sur la dotation indicative pour les districts de Jászapáti, Karcagi, Kunhegyesi, Kunszentmártoni, Törökszentmiklós. Le projet remplit les conditions énoncées au point 3.2 de l’appel. Le projet remplit les conditions énoncées au point 4.4 de l’appel à propositions et les critères d’évaluation spécifiques à la zone sont remplis. 2. Description de l’objet et justification du projet (max. 2000 caractères) 2.1. Le problème à résoudre, le besoin de développement. (Pourquoi le développement est-il nécessaire? Dans le présent projet le bâtiment officiel de la municipalité de Kunszentmárton City (Place de la République 8.) HRV. 1.) la rénovation énergétique de son bâtiment est en cours de construction. L’objectif du projet est la modernisation énergétique du bâtiment des bureaux municipaux. L’état du bâtiment est épuisé, son système énergétique est dépassé, les coûts d’entretien importants de la consommation d’énergie sont exceptionnels, donc la modernisation de l’énergie est nécessaire. Au cours de la mise en œuvre du projet, les activités suivantes devraient être menées: — isolation thermique partielle des façades, — isolation thermique des sols greniers, — modernisation du système de chauffage, — remplacement des portes et fenêtres de façade, — installation d’un système de panneaux solaires, Dans le cadre du projet soumis à l’appel d’offres TOP 3.2.1, la municipalité a décidé de rationaliser l’énergie du bâtiment de l’Office. L’objectif du projet est d’isoler le bâtiment selon des normes de pointe et de moderniser son système d’énergie et de chauffage, de remplacer ses portes de façade et d’installer un système de panneaux solaires d’une taille maximale de HMKE. Dans le cas de l’appel Top-3.2.1-15, veuillez expliquer en détail comment le projet correspond aux critères d’évaluation des critères d’évaluation énoncés dans l’annexe spécifique par l’acteur territorial. a) Le degré d’intégration du développement mis en œuvre avec l’actuel programme de développement régional du comté de Jász-Nagykun-Szolnok: Assemblée du comté de JNSZ 75/2014. (VIII.29.) a adopté le programme de développement régional du comté de Jász-Nagykun-Szolnok, dans lequel le thème du développement à la page 35 est décrit au point 4.1: Créer les conditions d’une économie verte, y compris 4.1.1 Évolution de la production d’énergie renouvelable et de substitution. Dans le cadre de ce projet, l’isolation thermique complète de la façade du bâtiment — partielle et dalle — sera réalisée, ainsi que la modernisation mécanique et le remplacement des portes de façade, ainsi que l’installation d’un système de panneaux solaires de la taille maximale de HMKE. Ce développement est pleinement conforme aux objectifs du programme de développement territorial. B) Quand a-t-il eu lieu pour la dernière fois la modernisation énergétique de la propriété touchée par l’aménagement? Étant donné que la documentation photographique jointe en annexe au plan de projet montre la modernisation énergétique complète du bâtiment impliqué dans le développement (qui était plus de 10 ans avant la présentation de la demande), le projet n’a pas eu lieu depuis sa construction. c) Le projet est le décret gouvernemental sur la classification des districts bénéficiaires, ou 105/2015. (IV. 23.) Conformément au décret gouvernemental, il est mis en œuvre dans les districts qui doivent être développés ou développés dans le cadre d ' un programme complexe: Kunszentmárton est situé dans le quartier de Kunszentmárton. La démarche est 290/2014. (XI. 26) Le décret gouvernemental no 26/2001 relatif à la classification des districts bénéficiaires a été classé dans le district à développer conformément à la loi. D) Le volume des économies d’énergie réalisées grâce à l’évolution par rapport à la moyenne des trois dernières années e) La consommation d’énergie est d’environ un tiers du bâtiment après l’investissement. La consommation d’énergie est réduite de 2 006,12 GJ à 609,33 GJ, les économies sont de 1 396,79 GJ f) Est-ce que le développement prévu concerne la production du vecteur énergétique et d’autres développements locaux à forte intensité de main-d’œuvre liée au traitement du vecteur énergétique. Les objectifs directs et indirects à long terme et les résultats escomptés du projet. Les objectifs à long terme fixés à Kunszentmárton City sont, d’une part, de garantir la sécurité de l’approvisionnement énergétique du bâtiment en cours de développement et d’accroître l’emploi grâce à des économies de coûts et de promouvoir la sensibilisation à l’environnement par l’utilisation de sources d’énergie alternatives et de solutions économes en énergie pour le rattrapage de la région. D’autre part, développer une tendance au développement durable, en particulier dans le domaine économique et social, grâce à la rénovation énergétique du bâtiment et à l’utilisation des technologies des énergies renouvelables. Sur la base du point 3.1 de l’appel, le projet co... (French)
    10 February 2022
    0 references
    Kunszentmárton, Jász-Nagykun-Szolnok
    0 references

    Identifiers

    TOP-3.2.1-16-JN1-2017-00007
    0 references