Property / co-financing rate | |||||||||||||||
| |||||||||||||||
Property / co-financing rate: 84.999977 percent / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 20,234,249 forint / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 55,951.95 Euro / rank | |||||||||||||||
Property / EU contribution: 55,951.95 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 55,951.95 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 65,073.954 Euro / rank | |||||||||||||||
Property / budget: 65,073.954 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 65,073.954 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 23,804,998.824 forint / rank | |||||||||||||||
Revision as of 16:45, 13 February 2022
Project Q3950430 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy modernisation of the Mátramindszent municipal office building |
Project Q3950430 in Hungary |
Statements
1 March 2017
0 references
7 February 2020
0 references
MÁTRAMINDSZENT KÖZSÉG ÖNKORMÁNYZATA
0 references
a) projekt célja: konzorciumban való együttműködéssel hozzájárul az alacsony szén-dioxid-kibocsátású gazdaság felé történő elmozdulás támogatásához. A beruházás az önkormányzati intézmény (Polgármesteri Hivatal) hatékonyabb energiahasználatának és racionálisabb energiagazdálkodásának elősegítéséhez járul hozzá, ezzel támogatja a munkahelyek megőrzését is. b) a projekt szakmai-műszaki tartalma a választott önállóan támogatható és önállóan nem támogatható tevékenységek körének a bemutatásával: Az épület jelenleg hőtechnikailag nem megfelelő, az akadálymentesítés nem megoldott, és nem rendelkezik megújuló energiaforrás hasznosító berendezéssel, gépészete elavult. A projektben az önállóan támogatható tevékenységek közül az alábbiak megvalósítása tervezett: -az épület energiahatékonyság-központú fejlesztése, külső határoló szerkezeteik korszerűsítése által: födém hőszigetelése kőzetgyapot lemezzel(15 cm) és homlokzati szigetelés polisztirol lemezzel (10 cm). - Maximum háztartási méretű kiserőmű (HMKE) fotovillamos rendszer kialakítása saját villamosenergia-igény kielégítése céljából: 10 kW (40 db 250Wp) polikristályos napelem rendszer kerül kiépítésre az épület déli homlokzatán. A projektben az önállóan nem támogatható, választható tevékenységek közül az alábbiak megvalósítása tervezett: Fosszilis energiahordozó alapú hőtermelő berendezések korszerűsítése, cseréje, és/vagy a kapcsolódó fűtési és HMV rendszerek korszerűsítése: az épület jelenleg a 176/2008. (VI. 30.) Kormányrendelet az épületek energetikai jellemzőinek tanúsításáról szerinti nem esik „DD – korszerűt megközelítő” kategóriába ("EE" kategóriás) Elektromos melegvízüzemű kazán és gázüzemű kondenzációs falikazán bekötési munkái tervezettek. -Az adott épülethez kapcsolódó, már meglévő, kül- és beltéri világítási rendszerek korszerűsítése: A bejárati világítást normál és halogénizzós lámpatestekkel oldjuk meg. A mellékhelyiségekben kompakt fénycsöves lámpatestek kerülnek beépítésre. Kötelezően megvalósítandó tevékenységek: Az épület komplett akadálymentesítése elvégzésre kerül: Akadálymentes parkoló építése, 5 %-os rámpa megvalósítása, korláttal, kapaszkodóval, vezetősávval, akadálymentes wc-mosdó kialakítás. Meglévő vizesblokkban belső nyílászárók részleges cseréje, küszöbmentesítés valósul meg. A burkolat részlegesen kerül cserére, piktogramok elhelyezése, és vezetősáv kerül kialakításra. 1 db mobil indukciós hurok biztosítja az akadálymentes feltételeknek való megfelelést. c)a felhívás 3.2 pontjában előírt feltételek teljesülése: A projekt megvalósítása során nem közvetít szegregációt, csökkenti a csoportokra vonatkozó meglévő előítéleteket. A projekt energetikai szakemberek dokumentált javaslataira épült, Projekt terv dokumentumának javaslatait beépítve a megvalósításba. A beruházással érintett épület 100%-ban a Mátramindszent Községi Önkormányzat tulajdonában áll, funkcióját tekintve Polgármesteri Hivatal. d) a felhívás tartalmi értékelési szempontok pontjában előírt feltételek teljesülése: 1.1 A projekt illeszkedése a Nemzeti Energiastratégia 2030, Magyarország II. Nemzeti Energiahatékonysági Cselekvési Terv, ill. Nemzeti Épületenergetikai Stratégiában megfogalmazottakhoz: A 2030-as stratégia öt fontos pillére közül a Felhívás céljainak releváns pontokhoz illeszkedik, melyek a következők: - Energiatakarékosság és energiahatékonyság fokozása (működtetési költségek csökkenése és megújuló energiaforrás alkalmazásával teljesül a feltétel). -Megújuló energiák részarányának növelése: napelemes rendszer kiépítése és a megtermelt energia visszatáplálása a hálózatba. A stratégiák az energiahatékonyság növelés egyik legfontosabb céljaként az épületek energiafelhasználásának csökkentését határozta meg, A Nemzeti Épületenergetikai Stratégia az épületek energiafelhasználásánál 2020. évre 49 PJ/év érték elérését tűzi ki célul, melyhez a projektben kidolgozott épületgépészeti és hőtechnikai megoldások alkalmazása hozzájárul. e) standard eljárás esetén a projekt terület-specifikus értékelési szempontok általi minősítése: Projekt Terv melléklete (Nyilatkozat a területspecifikus -szempontok teljesüléséről). (Hungarian)
0 references
the objective of the project: it will contribute to supporting the shift towards a low-carbon economy by working together in a consortium. The investment contributes to the promotion of the more efficient energy use and rational energy management of the municipal institution (Mayor’s Office), thereby also supporting the preservation of jobs. b) the technical and technical content of the project by presenting the scope of the selected self-eligible and non-eligible activities: The building is currently not thermally suited, accessibility is not solved and there is no renewable energy equipment, and its mechanical engineering is outdated. The project envisages the implementation of the following activities, which are eligible individually: —developing the building with a focus on energy efficiency by modernising their external boundaries: slab thermal insulation with rock wool plate(15 cm) and facade insulation with polystyrene (10 cm). — Small power plant with a maximum household size (HMKE) photovoltaic system to meet its own electricity demand: 10 kW (40 pieces 250Wp) polycrystalline solar panel system will be installed on the southern facade of the building. Among the optional activities that are not eligible individually, the project is intended to: Modernisation, replacement and/or upgrading of related heating and HMV systems of fossil fuel based heat generation equipment: the building is currently under 176/2008. (VI. 30.) Government Decree does not fall into the category “DD — approaching the state-of-the-art” according to the certification of the energy characteristics of buildings (“EE”) construction works are planned for electric water boilers and gas condensation wall boilers. —Updating existing outdoor and indoor lighting systems related to the building: The entrance lighting is solved with normal and halogen-incandescent luminaires. Luminaires with compact fluorescent lamps are installed in the toilets. Mandatory activities: Complete accessibility of the building will be completed: Construction of a barrier-free parking lot, 5 % ramp implementation, railing, handrails, guide lane, accessible toilet-washer design. Partial replacement of internal doors and doors is carried out in an existing sanitary block. The casing is partially replaced, pictograms are placed and a guide band is established. 1 mobile induction loop ensures compliance with the barrier-free conditions. (C)compliance with the conditions set out in point 3.2 of the notice: During the implementation of the project, it does not mediate segregation and reduces existing prejudices for groups. The project was built on the documented proposals of energy experts, integrating the proposals of the project plan document into the implementation. The building affected by the investment is 100 % owned by the Municipality of Mátramindszent, with regard to its function as Mayor’s Office. 1.1 The project fits into the National Energy Strategy 2030, Hungary II. National Energy Efficiency Action Plan and National Building Energy Strategy: Among the five important pillars of the 2030 Strategy, the Call targets fit into relevant points: — Energy saving and energy efficiency (reducing operating costs and using renewable energy sources are met). — Increase in the share of renewable energies: building a solar system and regenerating the generated energy to the grid. The strategies identified as one of the most important objectives for increasing energy efficiency the reduction of energy use in buildings, The National Building Energy Strategy 2020 it aims to achieve 49 PJ/year in year, to which the application of technical building and thermal engineering solutions developed in the project contributes. e) in the case of standard procedure, the qualification of the project by area-specific assessment criteria: Annex to the Project Plan (Declaration on the fulfilment of site-specific criteria). (English)
9 February 2022
0 references
L’objectif du projet: elle contribuera à soutenir la transition vers une économie à faible intensité de carbone en travaillant ensemble au sein d’un consortium. L’investissement contribue à la promotion d’une utilisation plus efficace de l’énergie et d’une gestion rationnelle de l’énergie de l’institution municipale (bureau du maire), contribuant ainsi à la préservation des emplois. b) le contenu technique et technique du projet en présentant la portée des activités auto-éligibles et non éligibles sélectionnées: Le bâtiment n’est actuellement pas adapté thermiquement, l’accessibilité n’est pas résolue et il n’y a pas d’équipement d’énergie renouvelable, et son ingénierie mécanique est dépassée. Le projet prévoit la mise en œuvre des activités suivantes, qui sont éligibles individuellement: —développer le bâtiment en mettant l’accent sur l’efficacité énergétique en modernisant ses frontières extérieures: isolation thermique dalle avec plaque de laine de roche (15 cm) et isolation de façade avec polystyrène (10 cm). — Petite centrale électrique avec un système photovoltaïque de taille maximale du ménage (HMKE) pour répondre à sa propre demande d’électricité: 10 kW (40 pièces 250Wp) système de panneaux solaires polycristallin sera installé sur la façade sud du bâtiment. Parmi les activités facultatives qui ne sont pas éligibles individuellement, le projet vise à: Modernisation, remplacement et/ou modernisation des systèmes de chauffage et de VHV connexes des équipements de production de chaleur à partir de combustibles fossiles: le bâtiment est actuellement inférieur à 176/2008. (VI. 30.) Le décret gouvernemental ne relève pas de la catégorie «DD — approche de l’état de la technique» selon la certification des caractéristiques énergétiques des bâtiments (EE) sont prévus pour les chaudières à eau électrique et les chaudières murales à condensation au gaz. Mise à jour des systèmes d’éclairage extérieurs et intérieurs existants liés au bâtiment: L’éclairage d’entrée est résolu avec des luminaires normaux et à incandescence halogène. Des luminaires avec lampes fluorescentes compactes sont installés dans les toilettes. Activités obligatoires: L’accessibilité complète du bâtiment sera achevée: Construction d’un parking sans barrière, 5 % de mise en œuvre de la rampe, garde-corps, mains courantes, voie de guidage, conception de lave-WC accessible. Le remplacement partiel des portes et des portes intérieures est effectué dans un bloc sanitaire existant. Le boîtier est partiellement remplacé, des pictogrammes sont placés et une bande de guidage est établie. 1 boucle d’induction mobile assure le respect des conditions sans barrière. C)le respect des conditions énoncées au point 3.2 de l’avis: Au cours de la mise en œuvre du projet, il ne médie pas la ségrégation et réduit les préjugés existants pour les groupes. Le projet s’est appuyé sur les propositions documentées d’experts en énergie, intégrant les propositions du plan de projet dans la mise en œuvre. Le bâtiment concerné par l’investissement est détenu à 100 % par la municipalité de Mátramindszent, en ce qui concerne sa fonction de bureau du maire. 1.1 Le projet s’inscrit dans la stratégie énergétique nationale 2030, Hongrie II. Plan d’action national pour l’efficacité énergétique et Stratégie énergétique nationale pour les bâtiments: Parmi les cinq piliers importants de la stratégie à l’horizon 2030, les objectifs de l’appel s’inscrivent dans les points pertinents: — Économies d’énergie et efficacité énergétique (réduction des coûts d’exploitation et utilisation de sources d’énergie renouvelables). — Augmentation de la part des énergies renouvelables: construire un système solaire et régénérer l’énergie générée vers le réseau. Les stratégies identifiées comme l’un des objectifs les plus importants pour accroître l’efficacité énergétique de la réduction de la consommation d’énergie dans les bâtiments, la stratégie nationale pour l’énergie des bâtiments 2020 il vise à atteindre 49 PJ/an dans l’année, auquel contribue l’application de solutions techniques de construction et d’ingénierie thermique développées dans le cadre du projet. e) dans le cas d’une procédure standard, la qualification du projet selon des critères d’évaluation spécifiques à la zone: Annexe au plan de projet (déclaration sur le respect des critères propres au site). (French)
10 February 2022
0 references
Mátramindszent, Nógrád
0 references
Identifiers
TOP-3.2.1-15-NG1-2016-00045
0 references