Property / co-financing rate | |||||||||||||||
| |||||||||||||||
Property / co-financing rate: 89.999999 percent / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 49,791,236 forint / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 137,683.22 Euro / rank | |||||||||||||||
Property / EU contribution: 137,683.22 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 137,683.22 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 151,233.997 Euro / rank | |||||||||||||||
Property / budget: 151,233.997 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 151,233.997 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 55,323,595.556 forint / rank | |||||||||||||||
Revision as of 16:22, 13 February 2022
Project Q3949376 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Inland water drainage in KörösNagyharsány |
Project Q3949376 in Hungary |
Statements
15 February 2018
0 references
13 November 2020
0 references
KÖRÖSNAGYHARSÁNY KÖZSÉGI ÖNKORMÁNYZAT
0 references
A projekt Körösnagyharsány területén valósul meg. Érintett területek lehatárolása Bocskai utca Váradi utca Vasút utca Petőfi utca A csapadékvíz elvezetésének hiánya/hiányosságai az ingatlanok közvetlen károsításán kívül természet- és környezetvédelmi szempontból is károsak. A csapadék a jelentős mennyiségű hordalékot az alacsonyan fekvő, laposabb területekre szállítja, ahol ezeket lerakva további gondokat okoz a települési infrastruktúrában, szennyeződést szállít a vízbázis védőterületre. A nagy mennyiségű gyors lefolyású csapadék a magasabban fekvő területeken eróziós károkat okoz, ami a talaj felső termékeny rétegének a pusztulásához vezet. A települések csapadékvize (különösen egy hosszabb száraz időszakot követően), vagy egy hóolvadásból származó lefolyás nagy mennyiségben juttathat súlyosan szennyező anyagokat az utak, járdák burkolatáról a befogadó vízfolyásba. A felszíni és felszínalatti vízbázisok elszennyezése a települések vízellátási zavarainak veszélyét is előrevetítheti. Mivel az érintett településeken a csapadék eloszlása szélsőséges, jellemző a hirtelen, nagyobb mennyiségben érkező csapadék. A projekt céljai: Körösnagyharsány település megfelelő csapadékvíz elvezető rendszer kialakítása, és ezzel a veszélyeztetett területekről a vízelvezetés megoldása. Környezetbiztonság növelése, környezeti állapot javítása, vízkár veszélyeztetettség csökkentése, káresemények megelőzése, a vizek rendezett és kártétel nélküli elvezetése, biztonságos és egészséges lakókörnyezet megteremtése Tervezett beavatkozások: Körösnagyharsány belterületén a belterület védelmét szolgáló vízelvezető-hálózat fejlesztése, rekonstrukciója a csapadékvízgazdálkodás céljainak figyelembevételével a következő vízlevezető árkok átépítése, kiépítése valósulhat meg a pályázat keretén belül: Földmedrű nyílt árok kiépítése Zárt belvízelveztő csatorna kiépítése Útkereszteződések bontása helyreállítása Földmedrű nyílt árok kiépítése Váradi utca: 780 m Vasút utca: 280 m Bocskai utca: 260 Zárt belvízelveztő csatorna kiépítése Vasút utca: 120 Útkereszteződések bontása helyreállítása 4 db Tervezett műszaki megoldások indoklása (speciális műszaki megoldások): a fejlesztés megvalósítása következtében minőségi paramétereiben megromlott, a fejlesztés által közvetlenül érintett közúthálózati sáv helyreállítása: A tervezett projektelemek megvalósításához szükséges az érintett útkeresztezések burkolatbontása, majd annak helyreállítása, 4,0 m burkolatot feltételezve, 8,0 m áteresz támfalakkal tervezve. A burkolat bontás és helyreállítás költsége nem haladja meg a Felhívás által előírt 15%-os szakmai költség-korlátot. Útkeresztezés burkolat bontás + helyreállítás: 4 db 1 db a Váradi utcában 2 db a Vasút utcában 1 db a Petőfit utcában árkok lefedése és fedett vízelvezető árkok építése: A projekt tervezése során figyelembe lett véve a Felhívás azon pontja, miszerint zárt csapadékvíz-elvezető rendszer kizárólag indokolt esetben építhető. Tehát ahol az útviszonyok, helyi adottságok lehetővé tették, ott nyílt csapadékvíz-elvezető rendszer került betervezésre. Egyes területeken azonban az utca közművei, ezáltal a vizek biztonságos elvezetésének szem előtt tartása, valamint az utca szűkössége indokolták a zárt csapadékvíz-elvezető rendszer betervezését. A zárt csatornarendszerek minden esetben a vizek biztonságos elvezetésének biztosításához szükségesek, azok nem parkolási célból vagy a közterületek növelése céljából kerültek kialakításra. Az alábbi szakaszon vált szükségessé a zárt elvezető rendszer kialakítása: Zárt csatorna: Vasút utca 120indikátorok: 1 440 m épített vagy felújított bel- és csapadékvíz-elvezető rendszer Indikátorok: 1 440 m , épített vagy felújított bel- és csapadékvíz-elvezető rendszer A szemléletformáló program célja, hogy megismertesse a célcsoportot a környezetvédelem általános elveivel, a fenntartható fejlődés fogalmával, jellemzőivel, illetve, hogy a helyiek hogyan tudnak hozzájárulni a fenntartható fejlődéshez mindennapi tevékenységük során. A projekt keretében kötelezően vállalt szemléletformáló programon túl, a Projektgazda vállalja a fejlesztéssel érintett területen a kulturált, tiszta környezet fenntartását támogató akció megvalósítását, melyet az önkormányzat saját költségvetéséből finanszíroz. A vállalt akciók az alábbiak: Lakossági akció szervezése (lakosság tájékoztatása az árkok tisztán tartásának fontosságáról és mikéntjéről) Szemétszedés az iskoláskorúak bevonásával az érintett területeken A tervezett beavatkozás rendszerbe integráltan valósul meg, illeszkedve a települési dokumentumokhoz, fejlesztésekhez, a megyei, a járási, illetve az országos fejlesztésekhez. Az illeszkedés a PET-ben került részletesen kifejtésre. A tervezett tevékenység hosszú távú (legalább 5 éves) fenntartásának intézményi, műszaki háttere biztosított, ez a PET-ben bemutatásra került. Az Önkormányzat a fejlesztést a Sarkadi járásszámára elkülönített indikatív keretösszegből kívánja fedezni. (Hungarian)
0 references
The project is carried out in the territory of KörösNagyharsány. Delimitation of the affected areas Bocskai utca Váradi utca Vasút utca Petőfi Street The absence/deficiencies of rainwater drainage are harmful not only from the direct damage to real estates but also from a natural and environmental point of view. Rainfall transports a significant amount of sediment to low-lying, flattered areas where they are deposited causing further problems in the municipal infrastructure and transporting pollution to the protection area of the waterbase. High levels of rapid precipitation cause erosion damage in higher areas, leading to the destruction of the upper fertile layer of the soil. Rainwater in settlements (especially after a longer dry period) or from a snow melting process can cause significant amounts of pollutants from the pavement of roads and pavements to the receiving watercourse. Pollution of surface and subsurface water bases may also predict the risk of water supply disruptions in settlements. Due to the extreme distribution of precipitation in the affected settlements, it is characterised by sudden, higher rainfall. Objectives of the project: The settlement of KörösNagyharsány develops a suitable rainwater drainage system and thus the solution of drainage from vulnerable areas. Improvement of environmental safety, improvement of environmental status, reduction of water damage, prevention of damage, orderly and unharmed discharge of water, creation of a safe and healthy living environment Planned interventions: In the internal area of KörösNagyharsány, the development and reconstruction of the drainage network for the protection of the inland area, taking into account the objectives of rainwater management, can be rebuilding and constructing the following drainage ditches within the framework of the tender: Construction of an open ditch closed inland drainage canal construction of road crossings restoration of earthbed open ditch construction of Váradi street: 780 m Railway Street: 280 m Bocskai street: 260 Establishment of a closed drainage channel railway street: 120 Rehabilitation of road crossings 4 reasons for planned technical solutions (special technical solutions): restoration of the road network lane directly affected by the development deteriorated in its quality parameters as a result of the development: For the implementation of the planned project elements, it is necessary to dismantle the affected road crossings and then restore it, assuming 4.0 m pavement, designed with 8.0 m penetrating walls. The cost of surface demolition and restoration does not exceed the professional cost limit of 15 % required by the Call. Road crossing pavement demolition + restoration: 4 pcs 1 in Váradi street 2 in Railway Street 1 pcs in Petőfit Street covering ditches and construction of covered drainage trenches: During the planning of the project, the point of the Call that closed rainwater drainage system can only be built in justified cases has been taken into account. So, where road conditions and local conditions made it possible, an open rainwater drainage system was planned. However, in some areas the utilities of the street, thus keeping in mind the safe drainage of water and the scarcity of the street, justified the design of the closed rainwater drainage system. Closed sewerage systems are in any case necessary to ensure safe drainage of the waters and are not designed for parking purposes or for the purpose of increasing public spaces. It has become necessary to establish a closed drainage system in the following section: Closed channel: Railway Street 120 Indicators: 1 440 m built or refurbished internal and rainwater drainage system Indicators: 1 440 m, built or renovated inland and rainwater drainage system The aim of the awareness-raising programme is to familiarise the target group with the general principles of environmental protection, the concept and characteristics of sustainable development and how local people can contribute to sustainable development in their daily activities. In addition to the compulsory awareness-raising programme undertaken in the framework of the project, the Project Owner undertakes to implement the action supporting the maintenance of a cultured, clean environment in the area affected by the development, which is financed by the local government from its own budget. The actions undertaken are as follows: The organisation of public action (informing the population about the importance of keeping the trench clean and how to keep the trenches clean) The collection of eyes with the involvement of schoolchildren in the affected areas The planned intervention system is implemented in an integrated way, in line with the local documents and developments, the county, district and national developments. The fit was explained in detail in PET. The institutional and technical background for the long-term maintenance of the planned activity (at least 5 years) is ensure... (English)
9 February 2022
0 references
Le projet est réalisé sur le territoire de Körösnagyharsány. Délimitation des zones touchées Bocskai utca Váradi utca Vasút utca Petőfi Street L’absence/les carences du drainage des eaux de pluie sont nocives non seulement du fait des dommages directs causés aux biens immobiliers, mais aussi du point de vue naturel et environnemental. Les précipitations transportent une quantité importante de sédiments vers des zones basses et plates où elles se déposent, ce qui entraîne d’autres problèmes dans l’infrastructure municipale et transporte la pollution vers la zone de protection de la base d’eau. Des niveaux élevés de précipitation rapide causent des dommages à l’érosion dans les zones supérieures, ce qui entraîne la destruction de la couche supérieure fertile du sol. L’eau de pluie dans les établissements (surtout après une période de sécheresse plus longue) ou à partir d’un processus de fonte des neiges peut causer des quantités importantes de polluants du revêtement des routes et des chaussées jusqu’au cours d’eau récepteur. La pollution des bases d’eau de surface et souterraine peut également prédire le risque de rupture de l’approvisionnement en eau dans les colonies. En raison de la distribution extrême des précipitations dans les colonies touchées, elle se caractérise par des précipitations soudaines et plus élevées. Objectifs du projet: La colonie de Körösnagyharsány développe un système approprié de drainage des eaux de pluie et donc la solution du drainage des zones vulnérables. Amélioration de la sécurité environnementale, amélioration de l’état de l’environnement, réduction des dommages causés par l’eau, prévention des dommages, rejet ordonné et inoffensif de l’eau, création d’un environnement de vie sûr et sain Interventions prévues: Dans la zone interne de Körösnagyharsány, le développement et la reconstruction du réseau de drainage pour la protection de la zone intérieure, en tenant compte des objectifs de la gestion des eaux de pluie, peuvent consister à reconstruire et à construire les fossés de drainage suivants dans le cadre de l’appel d’offres: Construction d’un fossé ouvert fermé canal de drainage intérieur construction de croisements routiers restauration de fossés de terre ouverte construction de la rue Váradi: 780 m Rue du chemin de fer: 280 m rue Bocskai: 260 Établissement d’une rue de chemin de fer fermée au canal de drainage: 120 Réhabilitation des passages à niveau 4 raisons de solutions techniques planifiées (solutions techniques spéciales): la restauration de la voie du réseau routier directement affectée par le développement s’est détériorée dans ses paramètres de qualité à la suite de l’aménagement: Pour la mise en œuvre des éléments prévus du projet, il est nécessaire de démanteler les passages à niveau touchés et de les restaurer, en supposant une chaussée de 4,0 m, conçue avec des murs pénétrants de 8,0 m. Le coût de la démolition et de la restauration de la surface ne dépasse pas le plafond professionnel de 15 % exigé par l’appel. Démolition des chaussées de franchissement routier + restauration: 4 pcs 1 dans la rue Váradi 2 dans la rue ferroviaire 1 pcs dans la rue Petőfit couvrant les fossés et la construction de tranchées de drainage couvertes: Lors de la planification du projet, il a été tenu compte du point de l’appel selon lequel un système fermé de drainage des eaux de pluie ne peut être construit que dans des cas justifiés. Ainsi, là où l’état des routes et les conditions locales l’ont rendu possible, un système d’évacuation des eaux pluviales à ciel ouvert a été prévu. Cependant, dans certains secteurs, les services publics de la rue, en gardant à l’esprit le drainage sûr de l’eau et la rareté de la rue, ont justifié la conception du système fermé de drainage des eaux pluviales. Les systèmes d’assainissement fermés sont en tout état de cause nécessaires pour assurer un drainage sûr des eaux et ne sont pas conçus pour des besoins de stationnement ou pour l’augmentation des espaces publics. Il est devenu nécessaire d’établir un système de drainage fermé dans la section suivante: Canal fermé: Chemin de fer 120 Indicateurs: 1 440 m construit ou rénové système de drainage interne et d’eau de pluie Indicateurs: Le programme de sensibilisation vise à familiariser le groupe cible avec les principes généraux de protection de l’environnement, le concept et les caractéristiques du développement durable et la manière dont les populations locales peuvent contribuer au développement durable dans leurs activités quotidiennes. Outre le programme de sensibilisation obligatoire entrepris dans le cadre du projet, le maître d’ouvrage s’engage à mettre en œuvre l’action de soutien au maintien d’un environnement cultivé et propre dans la zone touchée par le développement, financé par l’administration locale sur son propre budget. Les actions entreprises sont les suivantes: L’organisation de l’action publique (informer la population sur l’importance de maintenir la tranchée propre et... (French)
10 February 2022
0 references
Körösnagyharsány, Békés
0 references
Identifiers
TOP-2.1.3-16-BS1-2017-00017
0 references