Kunszentmárton Green City Development_x000D_ (Q3948791): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Adding French translations)
(‎Removed claims)
Property / co-financing rate
73.606111 percent
Amount73.606111 percent
Unitpercent
 
Property / co-financing rate: 73.606111 percent / rank
Normal rank
 
Property / EU contribution
967,823.5 Euro
Amount967,823.5 Euro
UnitEuro
 
Property / EU contribution: 967,823.5 Euro / rank
Preferred rank
 
Property / EU contribution: 967,823.5 Euro / qualifier
exchange rate to Euro: 0.00276521 Euro
Amount0.00276521 Euro
UnitEuro
 
Property / EU contribution: 967,823.5 Euro / qualifier
point in time: 6 December 2021
Timestamp+2021-12-06T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / EU contribution
350,000,000 forint
Amount350,000,000 forint
Unitforint
 
Property / EU contribution: 350,000,000 forint / rank
Normal rank
 
Property / budget
1,299,851.86 Euro
Amount1,299,851.86 Euro
UnitEuro
 
Property / budget: 1,299,851.86 Euro / rank
Preferred rank
 
Property / budget: 1,299,851.86 Euro / qualifier
exchange rate to Euro: 0.0027336256 Euro
Amount0.0027336256 Euro
UnitEuro
 
Property / budget: 1,299,851.86 Euro / qualifier
point in time: 15 December 2021
Timestamp+2021-12-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / budget
475,504,714.29 forint
Amount475,504,714.29 forint
Unitforint
 
Property / budget: 475,504,714.29 forint / rank
Normal rank
 

Revision as of 16:09, 13 February 2022

Project Q3948791 in Hungary
Language Label Description Also known as
English
Kunszentmárton Green City Development_x000D_
Project Q3948791 in Hungary

    Statements

    0 references
    1 September 2017
    0 references
    31 May 2021
    0 references
    Kunszentmárton Város Önkormányzata
    0 references
    Q3979979 (Deleted Item)
    0 references

    46°50'45.20"N, 20°17'2.44"E
    0 references
    A projekt keretében megvalósuló fejlesztés illeszkedik Kunszentmárton Város Integrált Településfejlesztési Stratégiájában foglalt tematikus célokhoz a következők szerint: 1. Az új piacterület létrehozásával megvalósul a városi gazdaság fejlesztése a lakosság foglalkoztatási helyzetének javítása érdekében. 2. A zöldfelületek növelése, a csatornarendszer, valamint a burkolatok felújítása által fejlesztésre kerül városi infrastruktúra és lakókörnyezet. 3. A megújuló zöldfelületek, pihenőparkok kialakításával a városban elérhető szolgáltatások minőségének és elérhetőségének fejlesztése is megvalósul. 4. A projekt során rehabilitált zöldfelületek és terek alapvetően szolgálják a lakosság életvitelének javítását, hiszen a pihenésre, a rekreációra, a mozgásra és a sportra biztosítanak megfelelő teret. A közösségi identitás erősítése a kapcsolódó ’soft’ programokon keresztül is történik. A projekt nem okozza az alacsonystátuszú lakosság arányának növekedését, hiszen a fejlesztések során létrehozott elemek olyan modern társadalomhoz méltó, több generációt összefogó közösségek kialakulását eredményezik, melyek egy fejlett városhoz méltóak. A projekt költségvetése reálisan került felmérésre. A támogatási kérelem benyújtását megelőzően elkezdődött a projekt tervezése is, melynek keretében tervezői költségbecslések is készültek. A projekt részét képező eszközöket illetően több internetes honlapot is megvizsgáltunk, valamint egy forgalmazó céggel is felvettük a kapcsolatot. Ezek alapján került összeállításra a projekt költségvetése. A projektgazda a hatályos Széchenyi 2020 Kedvezményezettek Tájékoztatási Kötelezettségei útmutató és arculati kézikönyv című dokumentumokban és a kapcsolódó felhívásban a kedvezményezettek számára előírt kötelező kommunikációs tevékenységek teljesítését vállalja: Projekthez kapcsolódó aloldal létrehozása, kommunikációs terv készítése, sajtóközlemény küldése a projektindításáról és a sajtómegjelenések összegyűjtése, a beruházás helyszínén „B” vagy „C” típusú tájékoztató táblák elhelyezése, kommunikációs célra is alkalmas fotódokumentációt készítése, sajtóközleményt kiküldése a projekt zárásáról és a sajtómegjelenéseket összegyűjtése, a beruházás helyszínén „D” típusú emlékeztető tábla elhelyezése, a TÉRKÉPTÉR feltöltése. Vállaja továbbá, hogy a fejlesztéshez kapcsolódó nyilvános eseményeken, kommunikációjában és viselkedésében esélytudatosságot fejez ki: nem közvetít szegregációt és csökkenti a csoportokra vonatkozó meglévő előítéleteket. Jász-Nagykun-Szolnok megye a „Városi területeken létrehozott vagy helyreállított nyitott terek” indikátorokhoz kapcsolódóan tett vállalást, melynek értéke 2.000 nm. A fejlesztés keretében a projektgazda kb. 7 841 nm-t vállal (2db kutyafuttató: 432 nm, 1 db futópálya: 1 015 nm, parkolók felújítása : 304 nm, a zöldfelület elérhetőségét és átjárhatóságát biztosító közlekedőfelület felújítása, kialakítása: 416,59 nm, 5 db játszótér kialakítása 446,60 nm, 4 db kültéri fitnesz park kialakítása: 204,00 nm, 1db extrém park kialakítása: 5 023 nm, Járdák felújítása: 807,00 nm) Önállóan támogatható tevékenységek: Zöld város kialakítása (zöldfelület rekonstrukció, 2db kutyafuttató, 1 db futópálya, 5 db játszótér, 4 db kültéri fitnesz park, 1db extrém park kialakítása, közösségi terek kialakítása (9 db nyugalom szigete), a csapadékvíz közvetlen hasznosítása a fejlesztésre kerülő zöldterületen): összesen kb. 242 045 912 Ft Helyi termékek számára piaci terület (városi, helyi piac, vásárcsarnok) kialakítása: 3 417 936 Ft Önállóan nem támogatható tevékenységek: Közlekedési és üzemterületek takarása, zajvédelme, porvédelme, pollenterhelés csökkentése terepalakítással és/vagy növénytelepítéssel: 3 695 700 Ft Járdák, gyaloghidak, kizárólag gyalogos és kerékpáros közlekedésre alkalmas nagyműtárgyak felújítása, kialakítása: 19 452 412 Ft A terület rendeltetésszerű használathoz szükséges eszközbeszerzés (környezetbe illő, minőségi utcabútorok elhelyezése stb.): 12 342 744 Ft Az akcióterületre eső belterületi csapadék és belvízvédelmi létesítmények a települési zöldinfrastruktúra-fejlesztés integráns részét képező rekonstrukciója vagy kiépítése: 6 762 750 Ft Meglévő parkolóhelyek felújítása: 9 658 744 Ft A zöldfelület elérhetőségét és átjárhatóságát biztosító közlekedőfelület felújítása, kialakítása: 12 587 923 Ft Önállóan nem támogatható, kötelezően megvalósítandó tevékenységek: Nyilvánosság biztosítása az ÁÚF c. dokumentum 10. fejezete alapján: 500 380 Ft Infrastrukturális, beruházás jellegű fejlesztéseket kiegészítő „soft” elemek: 2.540.000 Ft A hiánypótlási felhívásban foglaltak további részletezése a karakterszám korlát miatt külön mellékletben kerül bemutatásra. (Hungarian)
    0 references
    The project’s development fits into the thematic objectives of the Integrated Urban Development Strategy of the City of Kunszentmárton as follows: 1. The creation of a new market area will bring about the development of the urban economy in order to improve the employment situation of the population. 2. Urban infrastructure and living environment will be improved by increasing green surfaces, sewerage and refurbishment of pavements. 3. With the development of renewable green surfaces and rest parks, the quality and accessibility of the services available in the city will also be improved. 4. The green surfaces and spaces rehabilitated during the project are essential to improve the lifestyle of the population, as they provide the right space for relaxation, recreation, movement and sport. The strengthening of community identity is also done through the related ‘soft’ programmes. The project does not lead to an increase in the proportion of the population with low status, since the elements created during the development result in the formation of communities worthy of a modern society, bringing together several generations, worthy of an advanced city. The budget of the project has been assessed realistically. Prior to the submission of the grant application, the project was also planned, including cost estimates by the designer. As regards the tools forming part of the project, we examined several websites and contacted a distributor. On this basis, the project budget was compiled. The project promoter undertakes to carry out the mandatory communication activities required by the relevant Széchenyi 2020 Beneficiaries’ Information Obligations Guide and Identification Manual and the related call for beneficiaries: Creating a subpage related to the project, preparing a communication plan, sending a press release about the launch of the project and collecting press appearances, placing “B” or “C” type information boards on the site of the investment, preparing photo documentation suitable for communication purposes, sending a press release on the closing of the project and collecting press appearances, placing a “D” reminder on the site of the investment, uploading the TÉRKÉPTÉR. In addition, it shoulder to express a sense of opportunity in public events, communication and behaviour related to development: it does not mediate segregation and reduces existing prejudices for groups. Jász-Nagykun-Szolnok county committed to the indicators “open spaces created or restored in the urban areas” with a value of 2,000 sqm. As part of the development, the project owner undertakes about 7,841 sqm (2 dog runners: 432 nm, 1 runway: 1 015 sqm, refurbishment of parking lots: 304 nm, refurbishment and design of the road surface ensuring the accessibility and interoperability of the green surface: 416,59 sqm, 5 playgrounds 446,60 sqm, 4 outdoor fitness parks: 204,00 sqm, 1 piece of extreme park design: 5 023 sqm, Renovation of Jards: 807,00 nm) Self-eligible activities: Creation of a green city (green surface reconstruction, 2 dog runners, 1 runway, 5 playgrounds, 4 outdoor fitness parks, 1 extreme park, community spaces (9 islands of tranquility), direct utilisation of rainwater in the green area to be developed): total approx. 242 045 912 Ft Design of a market area (urban, local market, market hall) for local products: HUF 3 417 936 self-eligible activities: Covering transport and operating areas, noise protection, dust protection, reducing pollen loads by field design and/or planting: 3 695 700 HUF Renovation and design of Járdas, footbridges, large objects suitable for walking and cycling only: 19 452 412 Ft Acquisition of equipment necessary for the proper use of the area (installation of quality street furniture suitable for the environment, etc.): 12 342 744 Ft Reconstruction or construction of urban rainfall and inland water protection facilities in the action area as an integral part of urban green infrastructure development: 6 762 750 Ft Renovation of existing parking spaces: 9 658 744 Ft Renovation and design of the road surface ensuring the accessibility and interoperability of the green surface: HUF 12 587 923 activities which are not self-eligible and must be carried out: Publicity on the basis of Chapter 10 of the General Conditions document: 500 380 HUF “soft” elements complementing infrastructure and investment developments: HUF 2.540.000 The further details of the request for rectification are presented in a separate annex due to the number of characters limit. (English)
    9 February 2022
    0 references
    Le développement du projet s’inscrit dans les objectifs thématiques de la stratégie de développement urbain intégré de la ville de Kunszentmárton, comme suit: 1. La création d’une nouvelle zone de marché entraînera le développement de l’économie urbaine afin d’améliorer la situation de l’emploi de la population. 2. L’infrastructure urbaine et l’environnement de vie seront améliorés par l’augmentation des surfaces vertes, l’assainissement et la remise en état des chaussées. 3. Avec le développement de surfaces vertes renouvelables et de parcs de repos, la qualité et l’accessibilité des services disponibles dans la ville seront également améliorées. 4. Les surfaces vertes et les espaces réhabilités pendant le projet sont essentiels pour améliorer le style de vie de la population, car ils fournissent l’espace approprié pour la détente, les loisirs, le mouvement et le sport. Le renforcement de l’identité communautaire s’effectue également par le biais des programmes «soft» correspondants. Le projet ne conduit pas à une augmentation de la proportion de la population à faible statut, puisque les éléments créés au cours du développement aboutissent à la formation de communautés dignes d’une société moderne, réunissant plusieurs générations dignes d’une ville avancée. Le budget du projet a été évalué de manière réaliste. Avant la présentation de la demande de subvention, le projet était également prévu, y compris les estimations de coûts par le concepteur. En ce qui concerne les outils faisant partie du projet, nous avons examiné plusieurs sites web et contacté un distributeur. Sur cette base, le budget du projet a été établi. Le promoteur de projet s’engage à mener à bien les activités de communication obligatoires requises par le guide des obligations d’information et le manuel d’identification Széchenyi 2020 de Széchenyi 2020 et par l’appel aux bénéficiaires correspondant: Création d’une sous-page liée au projet, préparation d’un plan de communication, envoi d’un communiqué de presse sur le lancement du projet et collecte des apparitions de presse, placement de panneaux d’information de type «B» ou «C» sur le site de l’investissement, préparation de la documentation photo adaptée à la communication, envoi d’un communiqué de presse sur la clôture du projet et collecte des apparitions de presse, placement d’un rappel «D» sur le site de l’investissement, téléchargement du TÉRKÉPTÉR. En outre, il faut exprimer un sentiment d’opportunité dans les événements publics, la communication et les comportements liés au développement: il ne médie pas la ségrégation et réduit les préjugés existants pour les groupes. Le comté de Jász-Nagykun-Szolnok s’est engagé sur les indicateurs «espaces ouverts créés ou restaurés dans les zones urbaines» d’une valeur de 2 000 m². Dans le cadre du développement, le maître d’ouvrage entreprend environ 7 841 m² (2 coureurs de chiens: 432 nm, 1 piste: 1 015 m², remise en état des parkings: 304 nm, rénovation et conception du revêtement routier assurant l’accessibilité et l’interopérabilité de la surface verte: 416,59 m², 5 terrains de jeux 446,60 m², 4 parcs de remise en forme extérieurs: 204,00 m², 1 pièce de conception de parc extrême: 5 023 m², Rénovation des jards: 807,00 nm) Activités auto-éligibles: Création d’une ville verte (reconstruction de surface verte, 2 coureurs de chiens, 1 piste, 5 terrains de jeux, 4 parcs de fitness extérieurs, 1 parc extrême, espaces communautaires (9 îles de tranquillité), utilisation directe de l’eau de pluie dans la zone verte à développer): total env. 242 045 912 Ft Conception d’une zone de marché (urbain, marché local, hall de marché) pour les produits locaux: HUF 3 417 936 activités auto-éligibles: Couvrant les zones de transport et d’exploitation, la protection contre le bruit, la protection contre les poussières, la réduction des charges polliniques par conception et/ou plantation sur le terrain: 3 695 700 HUF Rénovation et conception de Járdas, passerelles, grands objets adaptés uniquement à la marche et au vélo: 19 452 412 Ft Acquisition du matériel nécessaire à la bonne utilisation de la zone (installation d’un mobilier urbain de qualité adapté à l’environnement, etc.): 12 342 744 Ft Reconstruction ou construction d’installations urbaines de protection des précipitations et des eaux intérieures dans la zone d’action en tant que partie intégrante du développement des infrastructures urbaines vertes: 6 762 750 Ft Rénovation des places de stationnement existantes: 9 658 744 Ft Rénovation et conception du revêtement routier assurant l’accessibilité et l’interopérabilité de la surface verte: HUF 12 587 923 activités qui ne sont pas auto-éligibles et doivent être réalisées: Publicité sur la base du chapitre 10 du document des conditions générales: 500380 éléments «soft» du HUF complétant les développements d’infrastructures et d’investissements: Les détails de la demande de rectification sont présentés dans une annexe distincte en raison du nombre... (French)
    10 February 2022
    0 references
    Kunszentmárton, Jász-Nagykun-Szolnok
    0 references

    Identifiers

    TOP-2.1.2-15-JN1-2016-00003
    0 references