Installation of a photovoltaic system on the institutions of Borsod-Abaúj-Zemplén County Central Hospital and University Teaching Hospital (Q3943893): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Adding French translations)
(‎Removed claims)
Property / co-financing rate
89.0 percent
Amount89.0 percent
Unitpercent
 
Property / co-financing rate: 89.0 percent / rank
Normal rank
 
Property / EU contribution
249,158,944 forint
Amount249,158,944 forint
Unitforint
 
Property / EU contribution: 249,158,944 forint / rank
Normal rank
 
Property / EU contribution
688,976.80 Euro
Amount688,976.80 Euro
UnitEuro
 
Property / EU contribution: 688,976.80 Euro / rank
Preferred rank
 
Property / EU contribution: 688,976.80 Euro / qualifier
exchange rate to Euro: 0.00276521 Euro
Amount0.00276521 Euro
UnitEuro
 
Property / EU contribution: 688,976.80 Euro / qualifier
point in time: 4 December 2021
Timestamp+2021-12-04T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / budget
765,289.065 Euro
Amount765,289.065 Euro
UnitEuro
 
Property / budget: 765,289.065 Euro / rank
Preferred rank
 
Property / budget: 765,289.065 Euro / qualifier
exchange rate to Euro: 0.0027336256 Euro
Amount0.0027336256 Euro
UnitEuro
 
Property / budget: 765,289.065 Euro / qualifier
point in time: 15 December 2021
Timestamp+2021-12-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / budget
279,953,869.663 forint
Amount279,953,869.663 forint
Unitforint
 
Property / budget: 279,953,869.663 forint / rank
Normal rank
 

Revision as of 14:56, 13 February 2022

Project Q3943893 in Hungary
Language Label Description Also known as
English
Installation of a photovoltaic system on the institutions of Borsod-Abaúj-Zemplén County Central Hospital and University Teaching Hospital
Project Q3943893 in Hungary

    Statements

    0 references
    1 August 2017
    0 references
    30 October 2018
    0 references
    Borsod-Abaúj-Zemplén Megyei Központi Kórház és Egyetemi Oktatókórház
    0 references
    Q3959607 (Deleted Item)
    0 references

    48°6'11.02"N, 20°47'24.14"E
    0 references
    A Borsod-Abaúj-Zemplén Megyei Központi Kórház és Egyetemi Oktatókórház pályázatot nyújt be fotovoltaikus rendszer kiépítésére Tagintézményei számára, a megújuló energiaforrás felhasználás növelése, valamint az üvegházhatású gázok kibocsátásának csökkentése érdekében. A projekt legfőbb célja a decentralizált, épülethez kapcsolódó környezetbarát megújuló energiaforrást hasznosító fotovoltaikus rendszerek elterjedésének elősegítése, így a meglévő fosszilis alapú villamosenergia felhasználás megújuló energiaforrásra való teljes vagy részleges kiváltásának támogatása. A projekt keretein belül a Borsod-Abaúj-Zemplén Megyei Központi Kórház és Egyetemi Oktatókórház és annak további három tagkórházát tervezi napelemes rendszerrel ellátni, melyek elhelyezésére a tetőszerkezeteken, illetve földre helyezve kerülne sor. A tervezett helyszínek az alábbiak: 1. A Borsod-Abaúj-Zemplén Megyei Központi Kórház és Egyetemi Oktatókórház (3526 Miskolc, Szentpéteri kapu 72-76.) hrsz: 3086/10 2. A Borsod-Abaúj-Zemplén Megyei Központi Kórház és Egyetemi Oktatókórház Szent Ferenc Tagkórháza (3529 Miskolc, Csabai kapu 42.) hrsz. 8229/2 3. A Borsod-Abaúj-Zemplén Megyei Központi Kórház és Egyetemi Oktatókórház Semmelweis Tagkórháza (3529 Miskolc, Csabai kapu 9-11.) hrsz. 8076/4 4. A Borsod-Abaúj-Zemplén Megyei Központi Kórház és Egyetemi Oktatókórház Mezőkövesdi Mozgásszervi Rehabilitációs Központ Tagkórház (3400 Mezőkövesd, Fülemüle út 1.) hrsz: 7174/22 A tervezett napelemes rendszerek elhelyezése tetőszerkezeteken történne, melyek többnyire lapostetővel rendelkeznek, illetve földre helyezve. A napelemek telepítésénél figyelembe kell venni a helyi sajátosságokat (magas épület, fa, stb.) melyek befolyásolhatják a napelemek működését. Lehetőség szerint a leg optimálisabb déli tájolással szükséges a napelemeket telepíteni, hogy a lehető legkedvezőbb termelt energiamennyiséggel rendelkezzenek. Megvalósítandó tevékenységeink a Felhívás 3.1.1 Önállóan támogatható tevékenységek pontja alapján: I. 50 kVA csatlakozási teljesítmény alatti (HMKE méretű), hálózatra csatlakozó napelemes rendszer(ek) kialakítása saját villamosenergia-igény részbeni vagy teljes közvetlen kielégítése céljából Támogatható beruházási elemek: Napelemek, tartó eszközök, állványok, helyi re II. 50-500 kVA csatlakozási teljesítményű, hálózatra csatlakozó napelemes rendszer kialakítása saját villamosenergia-igény részbeni vagy teljes közvetlen kielégítése céljából Támogatható beruházási elemek: Napelemek, tartó eszközök, állványok, helyi rendszerhez illetve a hálózathoz való csatlakozáshoz szükséges elemek (pl. inverter) és ezek kiépítésének költségei, külön mérő-és szabályozó berendezések beszerzése és felszerelése, a havi villamosenergia-fogyasztási adatokat rögzítő mérőeszköz beszerzése és felszerelése. A Felhívás 3.1.2. Önállóan nem támogatható tevékenységek pontja alapján megvalósítandó tevékenységek: I. Projekt-előkészítés II. Megvalósítás - Járulékos feladatok (beleértve projekt menedzsmentet, mérnöki feladatokat, a tájékoztatás és nyilvánosság biztosításának kötelező tevékenységét is) A megvalósult projekt abszolút értékben csökkentik az üvegházhatású gázok kibocsátását, a rendszer által éves szinten megtermelhető villamos energia mennyisége nem haladja meg az érintett épület, fejlesztés utáni éves villamosenergia-igényét. Az igénylő a környezetvédelmi és esélyegyenlőségi jogszabályokat betartja, a projekt által érintett területen a védett természeti és kulturális értékek megőrzése biztosított. A fennálló vagy a beruházás során keletkezett környezeti kárt és az esélyegyenlőség szempontjából jogszabályba ütköző nem-megfelelőséget legkésőbb a projekt megvalósítása során megszünteti. A fejlesztéshez kapcsolódó nyilvános eseményeken, kommunikációjában és viselkedésében a támogatást igénylő esélytudatosságot fejez ki: nem közvetít szegregációt, csökkenti a csoportokra vonatkozó meglévő előítéleteket. A projekt keretében kizárólag jogtiszta kommunikációs anyagok kerülnek felhasználásra. A támogatást igénylő vállalja, hogy együttműködik az Irányító Hatósággal, valamint az Európai Unió kijelölt hatóságaival a projekt megvalósítása során. A projekt megvalósítása során 3 mérföldkő tervezésére került sor az alábbiak szerint: 1. mérföldkő: A projekt megvalósításának kezdetétől számítottan,- az építési beruházás esetén, a kivitelezés készültség foka eléri a legalább 50 %-ot és nem építési beruházás esetén a beszerzések legalább 50 %-ban megtörténtek. A Kedvezményezett projekt szinten az összes elszámolható költség (kumulált) 50 %-ról kifizetési igénylést nyújt be. 2. mérföldkő: A projekt fizikai befejezésének napjáig,- a projektben vállalt valamennyi tevékenység megvalósult. A Kedvezmény az összes elszámolható költség (kumulált) 100%-ról kifizetési igénylést nyújt be. A támogatást igénylő a projekt pénzügyi befejezésétől számított 5 évig, a támogatás visszafizetésének terhe mellett vállalja, hogy a projekt megfelel a 1303/2013/EU Rendeletnek. (Hungarian)
    0 references
    The Borsod-Abaúj-Zemplén County Central Hospital and University Teaching Hospital is submitting a tender for the construction of a photovoltaic system for its member institutions in order to increase the use of renewable energy sources and reduce greenhouse gas emissions. The main objective of the project is to promote the uptake of decentralised building-related environmentally friendly photovoltaic systems, thus supporting the full or partial replacement of existing fossil-based electricity use into renewable energy sources. Within the framework of the project, the Borsod-Abaúj-Zemplén County Central Hospital and University Teaching Hospital and its three other member hospitals are to be equipped with solar panel systems, which would be placed on the roof and ground. The planned locations are as follows: 1. Borsod-Abaúj-Zemplén County Central Hospital and University Teaching Hospital (3526 Miskolc, Szentpéter Gate 72-76.) 3086/10 2. The Szent Ferenc Member Hospital of Borsod-Abaúj-Zemplén County and University Teaching Hospital (3529 Miskolc, Csabai Gate 42) hrsz. 8229/2 3. The Semmelweis Member Hospital of Borsod-Abaúj-Zemplén County Central Hospital and University Teaching Hospital (3529 Miskolc, Csabai Gate 9-11.) hrsz. 8076/4 4. The Borsod-Abaúj-Zemplén County Central Hospital and University Teaching Hospital in Mezőkövesd Movement Rehabilitation Centre Member Hospital (3400 Mezőkövesd, Fülemüle út 1.) hrsz: 7174/22 Designed solar panel systems would be installed on roof structures, which are mostly flat roofed or grounded. When installing solar panels, account must be taken of local specificities (high building, wood, etc.) which may affect the operation of solar panels. As far as possible, solar panels need to be installed with the most optimal southern orientation, so that they have the best possible amount of energy produced. Our activities to be carried out on the basis of the point of the Call 3.1.1 Self-eligible activities: I. Establishment of grid-connected solar system(s) below 50 kVA connection power (HMKE size) to meet fully or partially its own electricity demand. Solar panels, holding devices, racks, local re II. Development of a grid-connected solar system with a connection capacity of 50-500 kVA for the purpose of meeting its own electricity demand directly or partially. Eligible investment elements: Solar panels, supporting devices, racks, elements needed to connect to a local system or to the grid (e.g. inverter) and the costs of their installation, purchase and installation of separate metering and control equipment, purchase and installation of a meter recording monthly electricity consumption data. Call 3.1.2. Actions to be carried out on the basis of points of ineligible activities: I. Project preparation II. Implementation — Relevant tasks (including project management, engineering tasks, mandatory activity of providing information and publicity) The completed project reduces greenhouse gas emissions in absolute terms, the amount of electricity that the system can produce annually does not exceed the annual electricity demand of the building concerned after development. The applicant complies with environmental and equal opportunities legislation and the preservation of protected natural and cultural assets is ensured in the area covered by the project. The environmental damage or damage caused by the project and non-compliance with the law in terms of equal opportunities shall be eliminated at the latest at the time of the implementation of the project. In public events, communication and behaviour related to development, the need for support is expressed as a sense of opportunity: it does not mediate segregation, reduces existing prejudices for groups. Only pure communication material will be used in the project. The applicant undertakes to cooperate with the Managing Authority and the designated authorities of the European Union in the implementation of the project. During the implementation of the project, 3 milestones were planned as follows: Milestone 1: From the start of the implementation of the project,- in the case of works, the stage of completion is at least 50 % and, in the case of non-works, at least 50 % have been procured. At project level, the Beneficiary submits a payment claim from 50 % (cumulative) of the total eligible costs. Milestone 2: By the date of the physical completion of the project, all the activities undertaken in the project had been carried out. The Beneficiary submits a payment claim from 100 % (cumulative) of the total eligible costs. The applicant undertakes to comply with Regulation (EU) No 1303/2013 for a period of 5 years from the date of financial completion of the project, on pain of repayment of the aid. (English)
    9 February 2022
    0 references
    L’hôpital central du comté de Borsod-Abaúj-Zemplén et l’hôpital universitaire d’enseignement soumettent un appel d’offres pour la construction d’un système photovoltaïque pour ses institutions membres afin d’accroître l’utilisation des sources d’énergie renouvelables et de réduire les émissions de gaz à effet de serre. L’objectif principal du projet est de promouvoir l’adoption de systèmes photovoltaïques décentralisés liés à la construction respectueux de l’environnement, soutenant ainsi le remplacement total ou partiel de l’utilisation existante d’électricité basée sur les fossiles en sources d’énergie renouvelables. Dans le cadre du projet, l’hôpital central du comté de Borsod-Abaúj-Zemplén et l’hôpital universitaire d’enseignement et ses trois autres hôpitaux membres doivent être équipés de panneaux solaires, qui seraient placés sur le toit et le sol. Les emplacements prévus sont les suivants: 1. Hôpital central du comté de Borsod-Abaúj-Zemplén et hôpital universitaire d’enseignement (3526 Miskolc, porte Szentpéter 72-76.) 3086/10 2. L’hôpital membre de Szent Ferenc du comté de Borsod-Abaúj-Zemplén et l’hôpital universitaire d’enseignement (3529 Miskolc, Csabai Gate 42) hrsz. 8229/2 3. L’hôpital Semmelweis membre de l’hôpital central du comté de Borsod-Abaúj-Zemplén et l’hôpital universitaire d’enseignement (3529 Miskolc, porte Csabai 9-11.) hrsz. 8076/4 4. L’hôpital central du comté de Borsod-Abaúj-Zemplén et l’hôpital universitaire d’enseignement dans le centre de réadaptation du Mouvement Mezőkövesd Hôpital membre (3400 Mezőkövesd, Fülemüle út 1.) hrsz: 7174/22 Des systèmes de panneaux solaires conçus seraient installés sur des structures de toit, qui sont pour la plupart des toitures plates ou mises à la terre. Lors de l’installation de panneaux solaires, il convient de tenir compte des spécificités locales (haute construction, bois, etc.) qui peuvent affecter le fonctionnement des panneaux solaires. Dans la mesure du possible, les panneaux solaires doivent être installés avec l’orientation sud la plus optimale, afin qu’ils aient la meilleure quantité possible d’énergie produite. Nos activités à réaliser sur la base du point de l’appel 3.1.1 Activités auto-éligibles: I. Mise en place d’un ou de plusieurs systèmes solaires raccordés au réseau en dessous de 50 kVA (taille HMKE) pour répondre entièrement ou partiellement à sa propre demande d’électricité. Panneaux solaires, dispositifs de retenue, racks, local re II. Développement d’un système solaire raccordé au réseau d’une capacité de raccordement de 50 à 500 kVA afin de répondre directement ou partiellement à sa propre demande d’électricité. Les panneaux solaires, les dispositifs de soutien, les racks, les éléments nécessaires pour se connecter à un système local ou au réseau (par exemple l’onduleur) et les coûts d’installation, d’achat et d’installation d’équipements de mesure et de contrôle séparés, ainsi que l’achat et l’installation d’un compteur enregistrant des données mensuelles sur la consommation d’électricité. Appelez le 3.1.2. Actions à mener sur la base de points d’activités inéligibles: I. Préparation du projet II. Mise en œuvre — Tâches pertinentes (y compris la gestion de projet, les tâches d’ingénierie, l’activité obligatoire d’information et de publicité) Le projet achevé réduit les émissions de gaz à effet de serre en termes absolus, la quantité d’électricité que le système peut produire annuellement ne dépasse pas la demande annuelle en électricité du bâtiment concerné après le développement. Le demandeur respecte la législation en matière d’environnement et d’égalité des chances et la préservation des biens naturels et culturels protégés est assurée dans la zone couverte par le projet. Les dommages ou dommages environnementaux causés par le projet et le non-respect de la loi en termes d’égalité des chances sont éliminés au plus tard au moment de la mise en œuvre du projet. Dans les événements publics, la communication et les comportements liés au développement, le besoin de soutien est exprimé comme un sentiment d’opportunité: il ne médie pas la ségrégation, réduit les préjugés existants pour les groupes. Seul le matériel de communication pur sera utilisé dans le projet. Le demandeur s’engage à coopérer avec l’autorité de gestion et les autorités désignées de l’Union européenne à la mise en œuvre du projet. Au cours de la mise en œuvre du projet, trois étapes ont été planifiées comme suit: Étape 1: Dès le début de la mise en œuvre du projet, — dans le cas des travaux, l’étape d’achèvement est d’au moins 50 % et, dans le cas des non-travaux, au moins 50 % ont été achetés. Au niveau du projet, le bénéficiaire présente une demande de paiement à partir de 50 % (cumulatif) du total des coûts éligibles. Étape 2: À la date d’achèvement du projet, toutes les activités entreprises dans le cadre du projet avaient été menées à bien. Le bénéficiaire présente une demande de paiement à partir de 100 % (cumulatif) du total des coûts... (French)
    10 February 2022
    0 references
    Miskolc, Borsod-Abaúj-Zemplén
    0 references

    Identifiers

    KEHOP-5.2.11-16-2017-00139
    0 references