Mezőzombor — Sátoraljaújhely railway line bottleneck replacement and electrification (Q3943020): Difference between revisions
Jump to navigation
Jump to search
(Removed claims) |
(Changed an Item: fix budget) |
||||||||||||||
Property / co-financing rate | |||||||||||||||
78.79 percent
| |||||||||||||||
Property / co-financing rate: 78.79 percent / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
28,938,922,500.0 forint
| |||||||||||||||
Property / budget: 28,938,922,500.0 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
81,810,333.91 Euro
| |||||||||||||||
Property / budget: 81,810,333.91 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / budget: 81,810,333.91 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / budget: 81,810,333.91 Euro / qualifier | |||||||||||||||
point in time: 13 February 2022
| |||||||||||||||
Property / EU contribution | |||||||||||||||
22,800,000,000.0 forint
| |||||||||||||||
Property / EU contribution: 22,800,000,000.0 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
64,455,600.0 Euro
| |||||||||||||||
Property / EU contribution: 64,455,600.0 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 64,455,600.0 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / EU contribution: 64,455,600.0 Euro / qualifier | |||||||||||||||
point in time: 13 February 2022
|
Revision as of 14:35, 13 February 2022
Project Q3943020 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Mezőzombor — Sátoraljaújhely railway line bottleneck replacement and electrification |
Project Q3943020 in Hungary |
Statements
22,800,000,000.0 forint
0 references
28,938,922,500.0 forint
0 references
78.79 percent
0 references
20 October 2016
0 references
30 September 2021
0 references
NIF Nemzeti Infrastruktúra Fejlesztő zártkörűen működő Részvénytársaság
0 references
Tervezés: ebben a szakaszban elkészül a projektre vonatkozóan az Előzetes Vizsgálati Dokumentáció, a megvalósíthatósági változatelemzés és gazdaságossági számítás. (Hungarian)
0 references
Design: at this stage, the Preliminary Examination Documentation, Feasibility Version Analysis and Economy Calculation will be prepared for the project. (English)
9 February 2022
0 references
Conception: à ce stade, la documentation sur l’examen préliminaire, l’analyse de la faisabilité et le calcul de l’économie seront préparés pour le projet. (French)
10 February 2022
0 references
Mezőzombor, Borsod-Abaúj-Zemplén
0 references
Identifiers
IKOP-3.2.0-15-2016-00009
0 references