K. SÁ-BE Kft. installation of a solar system on its premises for the production of electricity in the grid. (Q3935795): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Adding French translations)
(‎Removed claims)
Property / co-financing rate
55.0 percent
Amount55.0 percent
Unitpercent
 
Property / co-financing rate: 55.0 percent / rank
Normal rank
 
Property / EU contribution
30,417.31 Euro
Amount30,417.31 Euro
UnitEuro
 
Property / EU contribution: 30,417.31 Euro / rank
Preferred rank
 
Property / EU contribution: 30,417.31 Euro / qualifier
exchange rate to Euro: 0.00276521 Euro
Amount0.00276521 Euro
UnitEuro
 
Property / EU contribution: 30,417.31 Euro / qualifier
point in time: 3 December 2021
Timestamp+2021-12-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / EU contribution
11,000,000 forint
Amount11,000,000 forint
Unitforint
 
Property / EU contribution: 11,000,000 forint / rank
Normal rank
 
Property / budget
54,672.512 Euro
Amount54,672.512 Euro
UnitEuro
 
Property / budget: 54,672.512 Euro / rank
Preferred rank
 
Property / budget: 54,672.512 Euro / qualifier
exchange rate to Euro: 0.0027336256 Euro
Amount0.0027336256 Euro
UnitEuro
 
Property / budget: 54,672.512 Euro / qualifier
point in time: 15 December 2021
Timestamp+2021-12-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / budget
20,000,000.0 forint
Amount20,000,000.0 forint
Unitforint
 
Property / budget: 20,000,000.0 forint / rank
Normal rank
 

Revision as of 11:52, 13 February 2022

Project Q3935795 in Hungary
Language Label Description Also known as
English
K. SÁ-BE Kft. installation of a solar system on its premises for the production of electricity in the grid.
Project Q3935795 in Hungary

    Statements

    0 references
    1 December 2020
    0 references
    30 September 2022
    0 references
    K. SÁ-BE Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság
    0 references
    0 references

    47°41'31.38"N, 22°2'30.37"E
    0 references
    A fejlesztés keretében a vállalkozás 4371 Nyírlugos, Debreceni út.36. 194/5. hrsz alatti telephelyén napelemes rendszer kerül telepítésre. A projekt keretében 44,55 kWp teljesítményű napelemes rendszer kerül kiépítésre, az épület tetőszerkezetére, mely az alábbi elemekből tevődik össze: Luxor Eco Line Half Cell M120 LX-330 / 158-120+ GG Half Cell, Black Frame napelem 135 db; Fronius Eco 25-0-3-S inverter 1 db; Fronius Symo 8.2-3-M 1 db;Napelem sínszerkezet (tartószerkezet), lefogatók, csavarok 135 db; Rendszer elektromos anyagköltség(kábel, túlfeszültségvédők, leválasztó, AC és DC szekrények, sztring biztosítékok+ tokozat 1 db;Helyszíni telepítés, beüzemelés 1 db. A teljes kivitelezés költsége:nettó 11.000.000 Ft. A kivitelezővel a kapcsolatfelvétel és a tervezés, árajánlat kérés megtörtént. A kivitelező az E2 Hungary Energiakereskedelmi és Szolgáltató Zártkörűen Működő Részvénytársaság 1117 Budapest, Infopark sétány 1. A fejlesztés megvalósítása által a napelemes rendszer által éves szinten megtermelhető energiamennyiség:49005 kWh, amely az épület teljes éves energiafogyasztásának 45%-át fogja biztosítani.Olyan rendszer kiépítése valósul meg, mely megfelel a megújuló energiát termelő berendezések és rendszerek beszerzéséhez és működtetéséhez nyújtott támogatások igénybevételének műszaki követelményeiről szóló 55/2016. (XII. 21.) NFM rendeletben (a továbbiakban: 55/2016. (XII. 21.) NFM rendelet) foglalt előírásoknak. Az egy tonna üvegházhatást okozó gázok éves csökkentésére vetített elszámolható összköltség (eFt/t CO2)értéke a projekt megvalósításával:298,37 Üvegházhatást okozó gázok éves csökkenésének aránya a fejlesztés előtti kibocsátáshoz képest (%/év):45,03Összes — az energiahatékonyságot és/vagy a napelemes rendszer telepítését célzó beruházásnak köszönhető — éves fajlagos primer energia fogyasztás megtakarítás mértéke a fejlesztés előtti állapothoz képest (% /év):27,01 Napelemes rendszer fajlagos elszámolható költsége a beépített napelemek összesített névleges teljesítményére vetítetten (Ft/kWp):246,914 Napelemes rendszer telepítése valósul meg hálózati villamosenergia-termelés céljából. A projektben tervezett tevékenységeken keresztül a projekt céljai elérhetőek, a projekt eredményei megvalósíthatóak. A projekt előkészítése a felmérés, tervezés, árajánlatkérés szintjéig megtörtént. A projekt végrehajtása során a projektmenedzsment tevékenységet több éves magas szakmai tapasztalattal rendelkező szakember fogja végezni, amely biztosítja a projekt sikeres megvalósítását. A műszaki ellenőri feladatokat Bodnár Tamás a Magyar Építész Kamara névjegyzékében szereplő szakember fogja végezni. A statikusi feladatokat pedig szintén a E2 Hungary RT. szakembere fogja végezni. (Hungarian)
    0 references
    In the framework of the development the company 4371 Nyírlugos, Debreceni út.36. A solar system is installed at its site under 194/5. As part of the project, a solar panel system with a capacity of 44.55 kWp will be installed for the roof structure of the building, which consists of the following elements: Luxor Eco Line Half Cell M120 LX-330/158-120+ GG Half Cell, Black Frame Solar Panel 135 pcs; Fronius Eco 25-0-3-S inverter 1 pcs; Fronius SYMO 8.2-3-M 1 pcs;Solar element rail structure (support structure), sealers, screws 135 pcs; System electrical material cost(cable, surge protectors, separator, AC and DC cabinets, string fuses+ housing 1 pcs;Site installation, installation 1 pcs. The full implementation költsége:nettó 11.000.000 HUF. The contact with the contractor and the planning and quotation request were made. The contractor is the E2 Hungary Energiakereskedelmi and Service Provider Limited Company 1117 Budapest, Infopark promenade 1. The development can be produced annually by the solar system energiamennyiség:49005 kWh, which will provide 45 % of the total annual energy consumption of the building.The system will be built in accordance with the technical requirements for the use of subsidies for the purchase and operation of renewable energy equipment and systems 55/2016. (XII. 21.) Decree of the Minister for National Development (hereinafter: 55/2016. (XII. 21.) Decree of the Minister for National Development) The total eligible cost per tonne of greenhouse gas reduction per year (eFt/t CO2) is the ratio of the annual reduction of greenhouse gas emissions to pre-development emissions megvalósításával:298,37 (%/year):45,03All annual specific primary energy consumption savings as a result of the investment in energy efficiency and/or installation of the solar system compared to the pre-development situation (%/year):27,01 The specific eligible cost of the solar system per unit of the rated output of installed solar panels (Ft/kWp):246,914 Solar panels are installed for electricity generation in the grid. Through the activities planned in the project, the objectives of the project can be achieved and the results of the project can be achieved. The project was prepared up to the level of survey, planning and request for quotation. During the implementation of the project, the project management activity will be carried out by a professional with several years of high professional experience, which will ensure the successful implementation of the project. Tamás Bodnár will perform the technical inspection tasks by a professional listed in the Hungarian Chamber of Architects. Static tasks will also be performed by E2 Hungary RT. (English)
    8 February 2022
    0 references
    Dans le cadre du développement de la société 4371 Nyírlugos, Debreceni út.36. Un système solaire est installé sur son site en 194/5. Dans le cadre du projet, un système de panneaux solaires d’une capacité de 44,55 kWc sera installé pour la structure du toit du bâtiment, qui comprend les éléments suivants: Luxor Eco Line demi-cellule M120 LX-330/158-120+ GG demi-cellule, cadre noir panneau solaire 135 pcs; Onduleur Fronius Eco 25-0-3-S 1 pcs; Fronius SYMO 8,2-3-M 1 pièces; Structure de rail d’élément solaire (structure de support), scelleurs, vis 135 pcs; Coût du matériel électrique du système (câble, protecteurs de surtension, séparateur, armoires AC et DC, fusibles de corde + boîtier 1 pcs; installation sur site, installation 1 pcs. Mise en œuvre intégrale költsége:nettó 11000000 HUF. Le contact avec le contractant ainsi que la demande de planification et de devis ont été effectués. L’entrepreneur est l’E2 Hungary Energiakereskedelmi and Service Provider Limited Company 1117 Budapest, Infopark promenade 1. Le développement peut être réalisé annuellement par le système solaire energiamennyiség:49005 kWh, qui fournira 45 % de la consommation annuelle totale d’énergie du bâtiment.Le système sera construit conformément aux exigences techniques pour l’utilisation de subventions pour l’achat et l’exploitation d’équipements et de systèmes d’énergie renouvelable 55/2016. (XII. 21.) Décret du Ministre du développement national (ci-après: 55/2016. (XII. 21.) Décret du Ministre du développement national) Le coût total éligible par tonne de réduction des gaz à effet de serre par an (eFt/t CO2) est le rapport entre la réduction annuelle des émissions de gaz à effet de serre et les émissions avant le développement megvalósításával:298,37 (%/an):45,03Toutes les économies annuelles spécifiques de consommation d’énergie primaire résultant de l’investissement dans l’efficacité énergétique et/ou l’installation du système solaire par rapport à la situation pré-développement (%/an):27,01 Le coût spécifique éligible du système solaire par unité de production nominale des panneaux solaires installés (Ft/kWp):246,914 Les panneaux solaires sont installés pour la production d’électricité dans le réseau. Grâce aux activités prévues dans le projet, les objectifs du projet peuvent être atteints et les résultats du projet peuvent être atteints. Le projet a été préparé jusqu’au niveau de l’enquête, de la planification et de la demande de devis. Au cours de la mise en œuvre du projet, l’activité de gestion de projet sera réalisée par un professionnel ayant plusieurs années d’expérience professionnelle élevée, ce qui assurera le succès de la mise en œuvre du projet. Tamás Bodnár effectuera les tâches d’inspection technique par un professionnel inscrit à la Chambre des Architectes de Hongrie. Les tâches statiques seront également exécutées par E2 Hongrie RT. (French)
    10 February 2022
    0 references
    Nyírlugos, Szabolcs-Szatmár-Bereg
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-02985
    0 references