Complex energy development at Eurocircuits Kft. (Q3935539): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Adding French translations) |
(Removed claims) |
||||||||||||||
Property / co-financing rate | |||||||||||||||
| |||||||||||||||
Property / co-financing rate: 51.81536 percent / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 192,992,967 forint / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 533,666.08 Euro / rank | |||||||||||||||
Property / EU contribution: 533,666.08 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 533,666.08 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 1,018,181.058 Euro / rank | |||||||||||||||
Property / budget: 1,018,181.058 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 1,018,181.058 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 372,465,438.58 forint / rank | |||||||||||||||
Revision as of 11:46, 13 February 2022
Project Q3935539 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Complex energy development at Eurocircuits Kft. |
Project Q3935539 in Hungary |
Statements
15 March 2021
0 references
31 December 2021
0 references
EUROCIRCUITS Nyomtatott Áramkör Gyártó Korlátolt Felelősségű Társaság
0 references
2019. évben komplex energetikai-, és környezethatékonysági tanulmányt készíttetett a menedzsment. Többféle verzió készült: csak napelem telepítése növelve a zöld elvárásoknak való vevői igényeket, és komplex, minden energetikai területre vonatkozó beruházási költségvetési terv. A cég 2016-2019. között saját erőből finanszírozta a világítás korszerűsítését. A felmérést követően tulajdonosi döntés a beruházás megvalósításáról, tervezők kiválasztása, megbízása: homlokzat és födém szigetelésre, valamint nyílászárócserére, gépészeti tervező az energetikai korszerűsítésre, illetve tervező a napelem telepítésre. Statikai szakvélemény bekérése. A építészeti és gépészeti tervek alapján az energetikus elkészítette az épület meglévő, köztes és tervezett állapotára vonatkozó tanúsítványokat. Az energetikus irányítja és koordinálja a szakágak közötti számításokat, műszaki tartalmakat. A napelem telepítése engedélyköteles, a tervek benyújtásra kerültek a HM-i Kormányhivatal Közlekedési, Műszaki Engedélyezési és Fogyasztóvédelmi Főosztályára. Az épületben történő egyéb műszaki beavatkozás nem engedélyköteles. Elkészült a szakágakra bontott terv, tételek kiírás készült, melyre ajánlatok kerültek bekérésre, legalább 3 szakági kivitelezőtől. A leendő kivitelezőkkel a kivitelezői árak véglegesítése. Pályázat benyújtása 2020. szeptember, várható döntés 2020. év végén. Megvalósítás lépései: Kivitelezői, vállalkozói szerződések megkötése a kivitelezőkkel, műszaki ellenőrökkel (építész, épületgépész, villamos), a projektmenedzsmenttel (a cég az elmúlt 3 évben 900 mFt értékű beruházást valósított meg EU-s támogatásból), az energetikussal. Kivitelezés 2021. 03. hótól, 2021. 10. hóig tart, heti kooperációs értekezletekkel. Próbaüzem majd a műszaki átadás, záró energetikai audit. A projekt zárása 2021.12.31-ig. Célterületek és beépített műszaki tartalmak: Megújuló energia: az épület működtetéséhez kapcsolódó évi 433 010,82 kWh villamos áram kiváltására 191,7 kWp beépített teljesítményű födémre szerelt napelempark telepítése, ami évi 210.870kWh villamos áramot termel. 426 db Longi LR4 típusú, 72 cellás, 450Wp teljesítményű napelem, ma a világ élvonalába tartozó teljesítmény. Inverter: Huawei Sun2000 a legelterjedtebb erőművi inverter. Épület hőtechnikai adottságainak javítása. Az épület teljes homlokzati- és födémszerkezetére hőszigetelő panelrendszer felhelyezése 10 cm vastagságban. Oldalpanel szerkezet: PUR hab, töltetű 100 mm vastag 0,24 W/m2K értékkel, TOPANEL TOP WALL típus. Födémpanel: TOPANEL TOP ROOF PUR töltetű 100 mm vastag, 0,17 W/m2K értékkel. Nyílászárók cseréje a jelenlegi 1,8-3,1 U W/m2K értékű helyett 1,15 W/m2K értékűekre. Az épület hűtési/fűtési/HMV rendszerének komplex korszerűsítése. A jelenlegi 4 db Buderus 130 kW, összesen 520 kW kazán helyett, 4 db REMEHA QUINTA ACE 115 PL kaszkád rendszerű, fokozat igénybevételű, 104 kW/db, névleges teljesítményű kazán kerül beépítésre. A rendszer biztosítja mind a HMV, mind a technológiához szükséges melegvizet. Hűtési rendszer korszerűsítése: 1 db meglévő 730 kW hőteljesítményű kompakt kültéri folyadékhűtő helyett egy Johnson Controls YSSC 530 EVO H1P típusú, két önálló hűtőkörrel és 6 db felépülő JOHNSON CONTROL 530 EVO H1P kaszkád rendszerű kompresszorral és modern R410a hűtőközeggel rendelkező folyadékhűtő kerül felszerelésre. Kb. 35%-kal kisebb a villamos áram felhasználása és 25%-kal kisebb hűtőteljesítménnyel, mert az épület átmelegedését a külső hőszigetelés nagyban csökkenti. (Hungarian)
0 references
In 2019, the management commissioned a complex energy and environmental efficiency study. Several versions have been created: installing only solar panels, increasing customer demands for green expectations, and a complex investment budget plan for all energy areas. Between 2016-2019, the company financed the modernisation of lighting with its own resources. Following the survey, the owner’s decision on the implementation of the investment, the selection of planners, the assignment of: facade and slab insulation, as well as doors and windows, mechanical designer for energy modernisation and solar panel installation. Request a static opinion. On the basis of the architectural and mechanical designs, the energetic has prepared certificates for the existing, intermediate and planned state of the building. The energetic manages and coordinates calculations and technical content between disciplines. The installation of the solar panel is subject to authorisation and the plans have been submitted to the Department of Transport, Technical Licensing and Consumer Protection of the Government Office of HM. Other technical intervention in the building is not subject to authorisation. A plan has been drawn up and lots have been published, for which bids were requested from at least 3 specialist contractors. Finalise contractors’ prices with prospective contractors. Submission of application September 2020, expected decision at the end of 2020. Implementation steps: Conclusion of contractors’ contracts with the contractors, technical inspectors (architect, building engineer, electrical), project management (the company has carried out an investment of HUF 900 mt of EU support in the last 3 years), the energetic. Construction 2021. From 03, 2021 It lasts until the 10th month, with weekly cooperation meetings. Test run will be the technical transfer, closing energy audit. Completion of the project by 31.12.2021. Target areas and built-in technical content: Renewable energy: installation of a solar panel park with a built-in capacity of 191.7 kWp to replace 433 010.82 kWh of electricity per year related to the operation of the building, generating 210.870 kWh of electricity per year. 426 Longi LR4 solar panels with 72 cell power, 450Wp, today the world’s leading performance. Inverter: Huawei Sun2000 is the most common power plant inverter. Improvement of the thermal equipment of the building. Installation of a thermal insulation panel system on the entire facade and slab structure of the building in a thickness of 10 cm. Side panel structure: PUR foam, 100 mm thick with 0.24 W/m2K, TOPANEL TOP WALL type. Slab panel: TOPANEL TOP ROOF PUR load 100 mm thick with 0.17 W/m2K. Replacement of doors and windows with 1.15 W/m2K instead of the current 1.8-3.1 U W/m2K. Complex modernisation of the building’s cooling/heating/HMV system. The current 4 Buderus 130 kW boilers with 4 Remeha Quinta ACE 115 PL cascade systems, 104 kW/pcs, nominal power will be installed instead of a total of 520 kW boilers. The system provides hot water for both HMV and technology. Modernisation of the cooling system: Instead of 1 compact outdoor liquid cooler with an existing 730 kW heat output, a Johnson Controls YSSC 530 EVO H1P liquid cooler with two separate cooling circuits and 6 built-up JOHNSON CONTROL 530 EVO H1P cascade compressors and modern refrigerant R410a will be installed. The use of electricity is about 35 % less and 25 % less cooling, because the heating of the building is greatly reduced by external thermal insulation. (English)
8 February 2022
0 references
En 2019, la direction a commandé une étude complexe sur l’efficacité énergétique et environnementale. Plusieurs versions ont été créées: installer uniquement des panneaux solaires, augmenter la demande des clients pour les attentes écologiques et un plan d’investissement complexe pour tous les secteurs énergétiques. Entre 2016 et 2019, l’entreprise a financé la modernisation de l’éclairage avec ses propres ressources. À la suite de l’enquête, la décision du propriétaire sur la mise en œuvre de l’investissement, la sélection des planificateurs, la cession de: isolation des façades et des dalles, portes et fenêtres, concepteur mécanique pour la modernisation énergétique et l’installation de panneaux solaires. Demander un avis statique. Sur la base des conceptions architecturales et mécaniques, l’énergie a préparé des certificats pour l’état existant, intermédiaire et planifié du bâtiment. L’énergie gère et coordonne les calculs et le contenu technique entre les disciplines. L’installation du panneau solaire est soumise à autorisation et les plans ont été soumis au ministère des Transports, de la délivrance des licences techniques et de la protection des consommateurs de l’Office gouvernemental de HM. Les autres interventions techniques dans le bâtiment ne sont pas soumises à autorisation. Un plan a été établi et des lots ont été publiés, pour lesquels des offres ont été demandées à au moins 3 contractants spécialisés. Finaliser les prix des contractants avec les contractants potentiels. Dépôt de la demande en septembre 2020, décision attendue à la fin de 2020. Étapes de mise en œuvre: Conclusion des contrats des contractants avec les contractants, inspecteurs techniques (architecte, ingénieur du bâtiment, électricité), gestion de projet (la société a réalisé un investissement de 900 millions de HUF de soutien de l’UE au cours des 3 dernières années), l’énergie. Construction 2021. À partir du 03 2021 Elle dure jusqu’au 10e mois, avec des réunions hebdomadaires de coopération. L’essai sera le transfert technique, l’audit énergétique de clôture. Achèvement du projet d’ici au 31.12.2021. Zones cibles et contenu technique intégré: Énergies renouvelables: installation d’un parc de panneaux solaires d’une capacité intégrée de 191,7 kWc pour remplacer 433 010,82 kWh d’électricité par an liés à l’exploitation du bâtiment, produisant 210,870 kWh d’électricité par an. 426 panneaux solaires Longi LR4 avec une puissance de 72 cellules, 450 Wp, aujourd’hui la première performance mondiale. Onduleur: Huawei Sun2000 est l’onduleur de centrale électrique le plus courant. Amélioration de l’équipement thermique du bâtiment. Installation d’un système de panneaux d’isolation thermique sur l’ensemble de la façade et de la structure de dalle du bâtiment dans une épaisseur de 10 cm. Structure du panneau latéral: Mousse PUR, 100 mm d’épaisseur avec 0.24 W/m2K, type TOPANEL TOP WALL. Panneau de dalle: TOPANEL TOP ROOF PUR charge 100 mm d’épaisseur avec 0.17 W/m2K. Remplacement des portes et fenêtres par 1,15 W/m2K au lieu du 1,8-3,1 U W/m2K actuel. Modernisation complexe du système de refroidissement/chauffage/HMV du bâtiment. Les 4 chaudières Buderus 130 kW actuelles avec 4 systèmes en cascade Remeha Quinta ACE 115 PL, 104 kW/pcs, puissance nominale seront installées au lieu d’un total de 520 kW de chaudières. Le système fournit de l’eau chaude pour HMV et la technologie. Modernisation du système de refroidissement: Au lieu de 1 refroidisseur de liquide extérieur compact avec une puissance thermique existante de 730 kW, un refroidisseur à liquide Johnson Controls ySSC 530 EVO H1P avec deux circuits de refroidissement séparés et 6 compresseurs en cascade JOHNSON CONTROL 530 EVO H1P ainsi que le réfrigérant moderne R410a seront installés. L’utilisation de l’électricité est d’environ 35 % de moins et 25 % moins de refroidissement, car le chauffage du bâtiment est considérablement réduit par l’isolation thermique externe. (French)
10 February 2022
0 references
Felsőtárkány, Heves
0 references
Identifiers
GINOP-4.1.4-19-2020-02670
0 references