Construction of a solar system at the headquarters of Avermann-Horváth Kft. (Q3935352): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claims)
(‎Changed an Item: fix budget)
Property / co-financing rate
 
55.0 percent
Amount55.0 percent
Unitpercent
Property / co-financing rate: 55.0 percent / rank
 
Normal rank
Property / budget
 
56,239,800.0 forint
Amount56,239,800.0 forint
Unitforint
Property / budget: 56,239,800.0 forint / rank
 
Normal rank
Property / budget
 
158,989.91 Euro
Amount158,989.91 Euro
UnitEuro
Property / budget: 158,989.91 Euro / rank
 
Preferred rank
Property / budget: 158,989.91 Euro / qualifier
 
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
Property / budget: 158,989.91 Euro / qualifier
 
point in time: 13 February 2022
Timestamp+2022-02-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / EU contribution
 
30,931,890.0 forint
Amount30,931,890.0 forint
Unitforint
Property / EU contribution: 30,931,890.0 forint / rank
 
Normal rank
Property / EU contribution
 
87,444.45 Euro
Amount87,444.45 Euro
UnitEuro
Property / EU contribution: 87,444.45 Euro / rank
 
Preferred rank
Property / EU contribution: 87,444.45 Euro / qualifier
 
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
Property / EU contribution: 87,444.45 Euro / qualifier
 
point in time: 13 February 2022
Timestamp+2022-02-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:40, 13 February 2022

Project Q3935352 in Hungary
Language Label Description Also known as
English
Construction of a solar system at the headquarters of Avermann-Horváth Kft.
Project Q3935352 in Hungary

    Statements

    0 references
    0 references
    30,931,890.0 forint
    0 references
    87,444.45 Euro
    0.002827 Euro
    13 February 2022
    0 references
    56,239,800.0 forint
    0 references
    158,989.91 Euro
    0.002827 Euro
    13 February 2022
    0 references
    55.0 percent
    0 references
    1 October 2020
    0 references
    30 September 2022
    0 references
    Avermann-Horváth Gépgyártó Kereskedelmi és Szolgáltató Korlátolt Felelősségü Társaság
    0 references
    0 references

    45°57'37.94"N, 17°27'48.35"E
    0 references
    A fejlesztés során az Avermann-Horváth Kft. Barcs, Drávapart 2. hrsz 511/4 székhelyén található épületre napelemes rendszer kerül kiépítésre. A napelemes rendszer telepítésének célja, hogy a felhasználó a villamos-energia fogyasztását részben megújuló energiahordozóval váltsa ki. A monokristály technológiás napelem táblák egységes egyenáramú része az épület lapos és ferde tetejére, kerülnek telepítésre. A projekt keretében 201 kWp néveleges napelemes teljesítményű rendszer telepítése történik meg, a megvalósítás tervezett időszaka 2020.10.01-2022.09.30. A kivitelezési munkálatok során 600 db 335 Wp névleges teljesítményű napelem kerül felszerelésre, lemeztetőre. A napelemek 2 db Huawei SUN2000-50KTL 50kW-os és 2 db Huawei SUN2000-36KTL 36kW-os inverteren keresztül csatlakoznak a kialakítandó AC elosztó-csatlakozó szekrényhez és a meglévő elektromos hálózathoz. A váltakozó áramú csatlakozás az épület főelosztójában kerül kialakításra. A projekt megvalósításának tervezett fizikai befejezése 2022.09.30. Az épület villamosenergia ellátása az E.ON Dél-dunántúli Áramhálózati Zrt. 0,4 kV-os közcélú hálózatáról biztosított. A napelemes rendszer a telephely elektromos hálózatán keresztül az E.ON tulajdonában lévő közcélú hálózatra fog csatlakozni. Az előkészítési terv / építési engedélyezési dokumentáció, műszaki leírás, elrendezési tervek elkészültek, a pályázati anyaghoz csatolásra kerültek. Szintén csatoltuk a tervezett rendszer fő elemeire - napelem, inverter, tartószerkezet - vonatkozó adatlapokat, mely alapján a tervezett eszközök minden tekintetben megfelelnek a hatályos jogszabályoknak. A kivitelezés során a napelemek a tetőszerkezetre kerülnek rögzítésre. Háromfázisú csatlakozás váltóirányítón (inverteren) keresztül történik. A DC kábelek a napelemektől az inverterekig a tetőn napelemek alatt - hogy kevésbé legyenek kitéve az időjárási viszonyoknak, falon kábelcsatornában kerülnek elhelyezésre. Az inverterek az épület főelosztó közelében, az épületen kívül a falon lesznek elhelyezve. Inverterenként 1 db DC leválasztó szekrény tartozik a rendszerhez, mindegyikbe munkapontonként kerül egy kapcsoló és egy túlfeszültség levezető. Az inverterek elmenő AC kábelei épületrészenként egy AC kapcsoló szekrénybe csatlakoznak. A projekt megvalósítására vonatkozóan Pályázó megfelelő tapasztalattal rendelkezik, hiszen a vállalkozás szakemberei korábbi pályázatok megvalósításában is részt vettek. A kiépített rendszer működtetésével kapcsolatban Kivitelező cég feladata lesz vállalkozás delegált tagjai számára a rendszer működésének bemutatása, oktatása. Kivitelező cég kapcsán elvárás a legalább 60 hónapos garanciális időszak. A napelemes rendszer telepítésének egyik feltétele, hogy mind a DC oldalon, mind az AC oldalon túlfeszültség védelemmel legyen ellátva a rendszer. A tervezett inverterek az áramszolgáltató által támasztott minden követelménynek megfelelnek és magyar nyelvű minősítéssel rendelkeznek. A napelemes rendszer automatikus működésű, külső beavatkozást nem igényel. Üzemideje erős fény, ill. a napsütéssel esik egybe, ami átlagosan napi 6-12 óra üzemidőt jelent. (Hungarian)
    0 references
    During the development of Avermann-Horváth Kft. A solar system will be installed on the building located at the headquarters of the 2nd district of Drávapart, Drávapart 2, 511/4. The purpose of the installation of the solar system is to partly replace the consumption of electricity by a renewable energy carrier. The uniform DC part of the solar panels with monocrystalt technology are installed on the flat and inclined top of the building. As part of the project, 201 kWp nominal solar power system will be installed. The planned implementation period is 01.10.2020-2022.09.30. During the construction works, 600 solar panels with a rated power of 335 Wp are installed on a plate roof. Solar panels connect via 2 Huawei SUN2000-50KTL 50 kW and 2 Huawei SUN2000-36KTL 36 kW inverters to the AC distribution cabinet and the existing power grid. The AC connection is set up in the main distributor of the building. The planned physical completion of the project is 30 September 2022. The electricity supply of the building is carried out by E.ON South Transdanubia Power Network Zrt. It is secured from a public service network of 0.4 kV. The solar system will be connected to the public network owned by E.ON through the electrical network of the site. The preparation plan/construction permit documentation, technical description, layout plans were completed and attached to the application file. Data sheets for the main elements of the planned system — solar panel, inverter, support structure — are also attached, according to which the planned devices comply in all respects with the legislation in force. During the construction, the solar panels are attached to the roof structure. Three-phase connection is done through an inverter (inverter). DC cables from solar panels to inverters on the roof under solar panels — to be less exposed to weather conditions, are placed on the wall in a cable duct. The inverters will be located near the main distributor of the building, on the wall outside the building. There is 1 DC isolation cabinet per inverter, each with a switch and a surge arrester per operating point. The inverters’ outgoing AC cables are connected to one AC switch cabinet per part of the building. The Applicant has relevant experience in the implementation of the project, as the experts of the company also participated in the implementation of previous applications. In connection with the operation of the built-in system, it will be the task of the implementing company to present and educate the operation of the system for the delegated members of the enterprise. A guarantee period of at least 60 months is expected for the construction company. One of the conditions for installing a solar panel system is that the system is equipped with overvoltage protection both on the DC side and on the AC side. The planned inverters meet all the requirements of the electricity supplier and are certified in Hungarian. The solar panel system is automatic and does not require external intervention. Its working time coincides with bright light and sunshine, which means on average 6-12 hours per day. (English)
    8 February 2022
    0 references
    Pendant le développement d’Avermann-Horváth Kft. Un système solaire sera installé sur le bâtiment situé au siège du 2e arrondissement de Drávapart, Drávapart 2, 511/4. L’installation du système solaire a pour objet de remplacer partiellement la consommation d’électricité par un vecteur d’énergie renouvelable. La partie uniforme DC des panneaux solaires avec technologie monocristalt sont installées sur le dessus plat et incliné du bâtiment. Dans le cadre du projet, un système solaire nominal de 201 kWp sera installé. La période de mise en œuvre prévue est le 01.10.2020-2022.09.30. Pendant les travaux de construction, 600 panneaux solaires d’une puissance nominale de 335 Wp sont installés sur un toit en plaques. Les panneaux solaires se connectent via 2 onduleurs Huawei SUN2000-50KTL 50 kW et 2 onduleurs Huawei SUN2000-36KTL 36 kW à l’armoire de distribution AC et au réseau électrique existant. La connexion AC est installée dans le distributeur principal du bâtiment. L’achèvement du projet est prévu pour le 30 septembre 2022. L’alimentation électrique du bâtiment est assurée par E.ON South Transdanubia Power Network Zrt. Il est sécurisé à partir d’un réseau de service public de 0,4 kV. Le système solaire sera raccordé au réseau public appartenant à E.ON par l’intermédiaire du réseau électrique du site. Le plan de préparation/la documentation du permis de construction, la description technique et les plans de mise en page ont été complétés et joints au dossier de demande. Des fiches techniques pour les principaux éléments du système prévu — panneau solaire, onduleur, structure de support — sont également jointes, selon lesquelles les dispositifs prévus sont conformes à tous les aspects à la législation en vigueur. Pendant la construction, les panneaux solaires sont fixés à la structure du toit. La connexion triphasée se fait par l’intermédiaire d’un onduleur (onduleur). Les câbles CC des panneaux solaires aux onduleurs sur le toit sous des panneaux solaires — pour être moins exposés aux conditions météorologiques, sont placés sur le mur dans un conduit de câble. Les onduleurs seront situés près du distributeur principal du bâtiment, sur le mur à l’extérieur du bâtiment. Il y a 1 armoire d’isolement DC par onduleur, chacun avec un interrupteur et un pare-surtension par point de fonctionnement. Les câbles AC sortants des onduleurs sont raccordés à une armoire d’interrupteur secteur par partie du bâtiment. La requérante possède une expérience pertinente dans la mise en œuvre du projet, étant donné que les experts de la société ont également participé à la mise en œuvre des demandes antérieures. Dans le cadre de l’exploitation du système intégré, il incombera à l’entreprise de mise en œuvre de présenter et d’éduquer le fonctionnement du système pour les membres délégués de l’entreprise. Une période de garantie d’au moins 60 mois est attendue pour l’entreprise de construction. L’une des conditions pour l’installation d’un système de panneaux solaires est que le système est équipé d’une protection contre les surtensions tant du côté CC que du côté AC. Les onduleurs prévus répondent à toutes les exigences du fournisseur d’électricité et sont certifiés en hongrois. Le système de panneaux solaires est automatique et ne nécessite pas d’intervention externe. Son temps de travail coïncide avec la lumière vive et l’ensoleillement, ce qui signifie en moyenne 6-12 heures par jour. (French)
    10 February 2022
    0 references
    Barcs, Somogy
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-02421
    0 references