Installation of a renewable energy solar system on Szabó Suzuki’s kazincbarcika salon (Q3933878): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Adding French translations)
(‎Removed claims)
Property / co-financing rate
55.0 percent
Amount55.0 percent
Unitpercent
 
Property / co-financing rate: 55.0 percent / rank
Normal rank
 
Property / EU contribution
14,693,280 forint
Amount14,693,280 forint
Unitforint
 
Property / EU contribution: 14,693,280 forint / rank
Normal rank
 
Property / EU contribution
40,630.00 Euro
Amount40,630.00 Euro
UnitEuro
 
Property / EU contribution: 40,630.00 Euro / rank
Preferred rank
 
Property / EU contribution: 40,630.00 Euro / qualifier
exchange rate to Euro: 0.00276521 Euro
Amount0.00276521 Euro
UnitEuro
 
Property / EU contribution: 40,630.00 Euro / qualifier
point in time: 3 December 2021
Timestamp+2021-12-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / budget
73,028.957 Euro
Amount73,028.957 Euro
UnitEuro
 
Property / budget: 73,028.957 Euro / rank
Preferred rank
 
Property / budget: 73,028.957 Euro / qualifier
exchange rate to Euro: 0.0027336256 Euro
Amount0.0027336256 Euro
UnitEuro
 
Property / budget: 73,028.957 Euro / qualifier
point in time: 15 December 2021
Timestamp+2021-12-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / budget
26,715,054.545 forint
Amount26,715,054.545 forint
Unitforint
 
Property / budget: 26,715,054.545 forint / rank
Normal rank
 

Revision as of 11:06, 13 February 2022

Project Q3933878 in Hungary
Language Label Description Also known as
English
Installation of a renewable energy solar system on Szabó Suzuki’s kazincbarcika salon
Project Q3933878 in Hungary

    Statements

    0 references
    3 August 2020
    0 references
    9 November 2020
    0 references
    Szabó György EV. Szabó Suzuki - Mazda Márkakereskedés és Szervíz
    0 references
    0 references

    48°15'15.98"N, 20°37'20.39"E
    0 references
    A cég az Elmü-Émász területi áramszolgáltatójához 2019. decemberében beadta igénybejelentését, amire az 50 kWp teljesítményű háztartási kiserőműre a Műszaki-Gazdasági Tájékoztatót kérte meg. A vállalkozás három tervezővel, illetve kivitelezővel történő versenyeztetéssel kiválasztotta a legkedvezőbb ajánlatot adó tervezőt és kivitelezőt, az energetikust, műszaki ellenőrt és statikust. A beruházás során 50 kW inverter és 59,85 kWp beépített napelem telepítésére (ami háztartási kiserőmű, hálózatra visszatápláló rendszer) szeretnénk támogatást kérni. A csatlakozási terv készítésére, műszaki rajzok nem támogatott tevékenységek. Műszaki tartalom: 210 db egyenként 285 kWp teljesítményű polikristályos 60 cellás GP-Solar GSH285P/120 panel összesen 59,85 kWp beépített teljesítmény, 50 kW teljesítményű 2 db Fronius Symo 20.0-3-M (Light) és 1 db Fronius Symo 10.0-3-M webserverrel szerelt inverter kerül beépítésre. Kiépítésre kerül a DC oldali villám, túlfeszültség elleni védelem. A beruházás műszaki megvalósításához 14.693.280 Ft költséghez 55%, 8.081.304 Ft vissza nem térítendő támogatást igényel. Tervezés, statika: A tervezéssel egyidőben az épület födémszerkezetének vizsgálata, hogy a lapostetőre kerülő tartószerkezetes vázrendszer és a 210 db-os napelem rendszer statikailag telepíthető-e. Az előzetes adatok alapján, ami a tartószerkezet, illetve a napelemek súlyát jelenti 25 kg/m2, a födém teherbíró képessége alkalmas. Energetikus: A vállalkozás energetikai elvárásainak megfelelő dokumentáció, illetve a fejlesztést követően a primer és CO2 hatású gázok kibocsájtásának csökkentéséről szóló auditot kell készíteni. Műszaki ellenőr: A kivitelezés során a beruházás ellenőrzése, hogy terv és engedély szerint, határidőre, 1. osztályú minőségben valósuljon meg a beruházás, valamint a statikai szakvélemény birtokában a munkák elvégzésének, megindításának engedélyezése. Az energetikus, a műszaki ellenőr és a statikus által végzett tevékenységet csak a pályázati felhívásban meghatározott jogosultsággal rendelkező személyek végezhetik el. Projektmenedzsment jártasság: A vállalkozás évente 10-20 mFt közötti műszaki technológiai fejlesztést valósít meg a szerviz részen, illetve 2016. évben egy közel 500 mFt-os beruházás keretében nyílt meg Szirmabesenyőn az autószalon és szervíz. Az EU-s pályázatokból az elmúlt két évben 2 alkalommal részesült támogatásban. A projekt műszaki, pénzügyi és időbeli koordinálásáért egy külső tanácsadó céget is alkalmaz, vállalkozási szerződés keretében, amely 17 éves szakmai tapasztalattal és 20 db lezárt 800 mFt-os beruházási értékű energetikai (benne napelemes rendszer kiépítése) célú EU-s pályázati referenciával rendelkezik. Részletes bemutatás: Napelemes rendszer telepítése lapostetős födémre. Célja, hogy a Szabó Suzuki vállalkozás 2018. évi bázis 138.888 kWh villamosenergia fogyasztásából minél nagyobb arányt (47,4%), 65.835 kWh áramot megújuló energiából állítson elő. A zöldárammal évente 49,53 tonna primér CO2 hatású gázkibocsájtást csökkent. Eredmény mérése: A rendszer keretében hálózatra visszatápláló ad/vesz órával felszerelt rendszer kerül kiépítésre, ahol az inverter webserveréből az adott időszak (hó/nap/év) napelemes villamos áram termelése kiolvasható. Az éves megtermelt zöldáram mennyisége függetlenül attól, hogy a telephelyen promt felhasználásra került-e, vagy a hálózatra visszatáplálás történt kWh pontossággal mérhető. A napelemes rendszer leírása a költségek között található. (Hungarian)
    0 references
    The company submitted its application to Elmü-Émász’s regional electricity supplier in December 2019, for which it requested the Technical-Economic Information for the small household power plant with a power of 50 kWp. By competing with three designers and contractors, the company selected the most favourable bid designer and contractor, the energetic, the technical inspector and the static one. During the investment we would like to request support for the installation of 50 kW inverter and 59,85 kWp of built-in solar panels (which is a small household power plant, regenerating system to the grid). For the preparation of the connection plan, technical drawings are not supported activities. Technical content: 210 polycrystalline 60-cell GP-Solar GSH285P/120 panels each with 2 pcs Fronius SYMO 20.0-3-M (Light) and 1 Fronius SYMO 10.0-3-M webserver are installed. DC side lightning, overvoltage protection will be installed. For the technical implementation of the investment, 55 % and HUF 8.081.304 for a cost of HUF 14.693.280 require non-repayable aid. Design, statics: At the same time as the design, the building’s slab structure is examined, whether the frame frame and the 210 pcs solar panel system can be installed staticly. Based on preliminary data, which means the weight of the support structure and the solar panels, the load-bearing capacity of the slab is suitable. Energetic: Documentation in line with the company’s energy requirements, and after development, an audit on the reduction of primary and CO2 gas emissions shall be carried out. Technical inspector: During the construction of the project, the inspection of the project shall be carried out in accordance with the plan and permit, by the deadline and in the quality of the first class, as well as the authorisation to carry out and initiate the works, having obtained the static expert opinion. The activities carried out by energy, the technical inspector and the static shall be carried out only by persons with the privileges specified in the call for proposals. Project management proficiency: The company carries out technical technological development in the service section between 10 and 20 m HUF per year, and in 2016 the car parlor and service opened in Szirmabesenyő as part of an investment of almost 500 mt. It has received 2 grants from EU proposals in the last two years. For the technical, financial and temporal coordination of the project, he also employs an external consultancy company, under a contract of business, which has 17 years of professional experience and has an EU tender reference for energy (including the construction of a solar panel system) with 20 closed HUF 800 mt investment. Detailed presentation: Installation of solar panel system on flat roof slab. The aim of Szabó Suzuki is to generate as much as possible from 138.888 kWh of electricity consumption in 2018 (47.4 %), 65.835 kWh of electricity from renewable energy. Green current has reduced emissions of 49.53 tonnes of primary CO2 per year. Measurement of result: A system equipped with a regenerative ad/vesting clock is installed under the system, where the production of solar electricity from the inverter webserver can be read out of the given period (month/day/year). The amount of green electricity produced per year, regardless of whether the promt was used on the site or whether the regeneration to the network has occurred, can be measured with accuracy in kWh. The description of the solar system can be found in the cost. (English)
    8 February 2022
    0 references
    La société a présenté sa demande au fournisseur régional d’électricité d’ELMÜ-ÉMÁSZ en décembre 2019, pour laquelle elle a demandé les informations techniques et économiques pour la petite centrale électrique domestique d’une puissance de 50 kWc. En concurrence avec trois concepteurs et entrepreneurs, l’entreprise a sélectionné le concepteur et l’entrepreneur le plus favorable, l’énergie, l’inspecteur technique et l’inspecteur statique. Au cours de l’investissement, nous aimerions demander un soutien pour l’installation d’onduleur de 50 kW et de 59,85 kWp de panneaux solaires intégrés (qui est une petite centrale électrique domestique, système de régénération au réseau). Pour la préparation du plan de raccordement, les dessins techniques ne sont pas pris en charge. Contenu technique: 210 panneaux polycristallins GP-Solar GSH285P/120 polycristallins chacun avec 2 pcs Fronius SYMO 20.0-3-M (Lumière) et 1 Fronius SYMO 10.0-3-M webserver sont installés. La foudre latérale DC, protection contre les surtensions sera installée. Pour la mise en œuvre technique de l’investissement, 55 % et 8 081,304 HUF pour un coût de 14 693,280 HUF nécessitent une aide non remboursable. Conception, statique: En même temps que la conception, la structure de la dalle du bâtiment est examinée, si le cadre de cadre et le système de panneaux solaires 210 pièces peuvent être installés statiquement. Sur la base de données préliminaires, ce qui signifie le poids de la structure de support et les panneaux solaires, la capacité de charge de la dalle est appropriée. Énergie: Une documentation conforme aux besoins énergétiques de l’entreprise et, après développement, un audit sur la réduction des émissions de gaz primaire et de CO2 doit être réalisé. Inspecteur technique: Lors de la construction du projet, l’inspection du projet doit être effectuée conformément au plan et au permis, dans les délais et dans la qualité de la première classe, ainsi que l’autorisation d’exécuter et d’initier les travaux, après avoir obtenu l’avis d’expert statique. Les activités exercées par l’énergie, l’inspecteur technique et le statique ne sont exercées que par des personnes jouissant des privilèges spécifiés dans l’appel à propositions. Compétences en gestion de projet: L’entreprise réalise un développement technologique technique dans la section de service entre 10 et 20 m HUF par an, et en 2016 le salon et le service de voitures ouverts à Szirmabesenyő dans le cadre d’un investissement de près de 500 mt. Il a reçu deux subventions provenant de propositions de l’UE au cours des deux dernières années. Pour la coordination technique, financière et temporelle du projet, il emploie également une société de conseil externe, dans le cadre d’un contrat d’entreprise, qui possède 17 ans d’expérience professionnelle et dispose d’une référence d’appel d’offres de l’UE pour l’énergie (y compris la construction d’un système de panneaux solaires) avec 20 HUF d’investissement fermés de 800 mt. Présentation détaillée: Installation d’un système de panneaux solaires sur dalle de toit plat. L’objectif de Szabó Suzuki est de produire autant que possible à partir de 138,888 kWh de consommation d’électricité en 2018 (47,4 %), 65,835 kWh d’électricité à partir d’énergies renouvelables. Le courant vert a réduit les émissions de 49,53 tonnes de CO2 primaire par an. Mesure du résultat: Un système équipé d’une horloge régénératrice d’annonces/vidange est installé sous le système, où la production d’électricité solaire à partir du serveur web onduleur peut être lue hors de la période donnée (mois/jour/année). La quantité d’électricité verte produite par an, que le bal ait été utilisé sur le site ou que la régénération du réseau ait eu lieu, peut être mesurée avec précision en kWh. La description du système solaire se trouve dans le coût. (French)
    10 February 2022
    0 references
    Kazincbarcika, Borsod-Abaúj-Zemplén
    0 references

    Identifiers

    GINOP-4.1.4-19-2019-00345
    0 references