Property / co-financing rate
100.0 percent
Amount100.0 percent
Unitpercent
 
Property / co-financing rate: 100.0 percent / rank
Normal rank
 
Property / EU contribution
2,990,000 forint
Amount2,990,000 forint
Unitforint
 
Property / EU contribution: 2,990,000 forint / rank
Normal rank
 
Property / EU contribution
8,267.98 Euro
Amount8,267.98 Euro
UnitEuro
 
Property / EU contribution: 8,267.98 Euro / rank
Preferred rank
 
Property / EU contribution: 8,267.98 Euro / qualifier
exchange rate to Euro: 0.00276521 Euro
Amount0.00276521 Euro
UnitEuro
 
Property / EU contribution: 8,267.98 Euro / qualifier
point in time: 3 December 2021
Timestamp+2021-12-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / budget
8,173.541 Euro
Amount8,173.541 Euro
UnitEuro
 
Property / budget: 8,173.541 Euro / rank
Preferred rank
 
Property / budget: 8,173.541 Euro / qualifier
exchange rate to Euro: 0.0027336256 Euro
Amount0.0027336256 Euro
UnitEuro
 
Property / budget: 8,173.541 Euro / qualifier
point in time: 15 December 2021
Timestamp+2021-12-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / budget
2,990,000.0 forint
Amount2,990,000.0 forint
Unitforint
 
Property / budget: 2,990,000.0 forint / rank
Normal rank
 

Revision as of 10:46, 13 February 2022

Project Q3932995 in Hungary
Language Label Description Also known as
English
Installation of solar panel system at Simon and Partners Kft.
Project Q3932995 in Hungary

    Statements

    0 references
    10 March 2020
    0 references
    22 May 2020
    0 references
    "Simon és Társai" Szolgáltató és Kereskedelmi Korlátolt Felelőségű Társaság
    0 references
    0 references

    47°11'8.27"N, 18°2'51.54"E
    0 references
    Cégünk a 8191 Öskü, Külterület hrsz. 05/50. cím alatti székhelyén sérült karambolos kamionok és pótkocsik javítását, egyengetését, fényezését valamint szervizelését végzi. A megvalósítási helyszínen egy irodaház, három műhely és egy raktárépület található, az egyik műhely épületre kívánjuk elhelyezni a napelemeket. A fejlesztés megvalósításával az energiaigényünk megújuló energiával történő ellátását céloztuk meg. A projekt során telepítésre kerül egy 14,95 kWp teljesítményű napelemes rendszer a tetőszerkezetre. A támogatási kérelem benyújtását megelőző éves időtartamra vonatkozó áramszámlák alapján igazolható éves villamos energiafogyasztás: 27 237 kWh, melynek 60,38 %-át tervezzük kiváltani a napelemes rendszer által termelt energiával. A megújuló energiaforrás használatával a környezetterhelés csökkentése mellett a rezsiköltségeinket is csökkentjük. A napelemes rendszer műszaki paraméterei: 46 db JA Solar JAM60S09 325 Wp napelem, az inverter típusa Fronius Symo 15-3M wifi inverter. (Hungarian)
    0 references
    Our company is the 8191 Total, Outer Area Hrsz. Repair, straighten, polish and servicing damaged trucks and trailers at its headquarters under 05/50. At the implementation site there is an office building, three workshops and a warehouse building, and we intend to place the solar panels on one of the workshop buildings. By implementing the development, we aimed at supplying our energy needs with renewable energy. During the project, a 14,95 kWp solar panel system will be installed on the roof. The annual electricity consumption can be verified on the basis of the electricity bills for the year preceding the submission of the aid application: 27 237 kWh, of which 60.38 % is planned to be replaced by the energy generated by the solar system. Using renewable energy sources, we are also reducing our overhead costs, as well as reducing the environmental burden. Technical parameters of the solar system: 46 pcs JA Solar JAM60S09 325 Wp solar panel, inverter type Fronius SYMO 15-3M wifi inverter. (English)
    8 February 2022
    0 references
    Notre société est le 8191 Total, Zone Extérieure Hrsz. Réparation, redressage, polissage et entretien des camions et remorques endommagés à son siège sous 05/50. Sur le site de mise en œuvre il y a un immeuble de bureaux, trois ateliers et un entrepôt, et nous avons l’intention de placer les panneaux solaires sur l’un des bâtiments de l’atelier. En mettant en œuvre le développement, nous visons à répondre à nos besoins énergétiques en énergie renouvelable. Au cours du projet, un système de panneaux solaires de 14,95 kWp sera installé sur le toit. La consommation annuelle d’électricité peut être vérifiée sur la base des factures d’électricité de l’année précédant la présentation de la demande d’aide: 27 237 kWh, dont 60,38 % devraient être remplacés par l’énergie produite par le système solaire. En utilisant des sources d’énergie renouvelables, nous réduisons également nos frais généraux ainsi que la charge environnementale. Paramètres techniques du système solaire: 46 PCs JA Solar JAM60S09 325 Wp panneau solaire, type d’onduleur Fronius SYMO 15-3M onduleur wifi. (French)
    10 February 2022
    0 references
    Öskü, Veszprém
    0 references

    Identifiers

    GINOP-4.1.3-19-2019-01289
    0 references