Energy modernisation of the Liget Wellness and Conference Hotel in Deer (Q3925125): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Adding French translations) |
(Removed claims) |
||||||||||||||
Property / co-financing rate | |||||||||||||||
| |||||||||||||||
Property / co-financing rate: 50.0 percent / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 135,464,481 forint / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 374,587.74 Euro / rank | |||||||||||||||
Property / EU contribution: 374,587.74 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 374,587.74 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 740,618.346 Euro / rank | |||||||||||||||
Property / budget: 740,618.346 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 740,618.346 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 270,928,962.0 forint / rank | |||||||||||||||
Revision as of 10:23, 13 February 2022
Project Q3925125 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy modernisation of the Liget Wellness and Conference Hotel in Deer |
Project Q3925125 in Hungary |
Statements
3 January 2019
0 references
15 December 2019
0 references
LIGET HOTEL Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság
0 references
A projekt megvalósításának előkészítése a Felhívásban meghatározott és előírt szempontok alapján valósult meg. első lépésként piacfelmérésen alapuló 3 db árajánlat bekérésével megtörtént az energetikai szakértő cég kiválasztása. a nyertes ajánlattevő céggel kötött szerződés alapján a Felhívásban előírt jogosultsággal rendelkező szakértő helyszíni bejárást folytatott le, ami alapján elkészült az épületek energetikai jellemzőinek tanúsításáról szóló 176/2008. (VI. 30.) Korm. rendelet szerinti energetikai minőségtanúsítvány, és a fejlesztésre vonatkozó energetikai koncepciót. Elkészült a projektre vonatkozó árazatlan költségvetés, az épületgépész, és az építészeti műszaki leírás, ami megküldésre került az árajánlatkérés keretében a kiválasztott Ajánlattevők részére. A legalacsonyabb árat adó generálkivitelező cég árazott költségvetése alapján véglegessé vált a projekt elszámolható költsége. Ezt követően véglegesítésre került a támogatási kérelem, ami benyújtásra került. A projekt nem tartalmaz engedélyköteles tevékenységet, így engedélyező hatóságokkal való egyeztetés nem releváns. A projekt előkészítési költségei közt kiviteli tervezés is elszámolásra kerül, mivel az épületet eredetileg gázkazános fűtési rendszerrel kerültek kialakításra, továbbá vízhűtéses folyadékhűtő hivatott a hűtési energiát fedezni, de időközben Szarvas település távhőellátási rendszer került kialakításra, amelynek keretében a hotel is bekötésre került a hálózatba, párhuzamosan a gázkazános fűtési rendszerrel, és a fűtési rendszer egy jelenleg is bivalens kialakítású rendszer, amelyben a használati melegvíz igényeket a gázkazán hivatott fedezni. A gépészeti rendszer komplexitása miatt döntöttünk úgy, hogy a kivitelezési munkák kiviteli tervek alapján valósuljanak meg. A projektmenedzsment tevékenységet ellátó céget piacfelmérésen alapuló 3 árajánlat bekérésével választottuk ki, a támogatói döntést követően a nyertes ajánlatot adó cég feladata lesz a projekt határidőben történő lebonyolításának és elszámolásának koordinációja. A projekt kivitelezését műszaki ellenőr követi nyomon, aki az átadás-átvétel során igazolja a teljesítést, és azt, hogy a kivitelező betartotta a jogszabályi, és műszaki előírásokat. A projektmenedzsment feladata lesz a Pénzügyminisztérium Gazdaságfejlesztési Programok Végrehajtásáért Felelős Helyettes Államtitkárságával való kommunikáció, az elszámolások és szakmai beszámolók elkészítése és benyújtásra, az esetlegesen felmerülő változások kezelése az EPTK felületen keresztül. A projektmenedzsment szervezet rendelkezik a megfelelő kompetenciával, és releváns, Európai Uniós forrásból megvalósuló energetikai projektek lebonyolításában szerzett tapasztalatokkal. A Projekt adatlap „Projekt részletes bemutatása” funkcióban kiválasztott célterület, projektelem bemutatása karakterkorlátozás miatt külön cégszerűen aláírt nyilatkozatban került csatolásra. (Hungarian)
0 references
The preparation of the project was carried out on the basis of the criteria defined and specified in the call. As a first step, the energy expert company was selected by requesting 3 quotations based on a market survey. On the basis of the contract concluded with the successful bidder, the expert with the right to perform the call carried out an on-site visit, on the basis of which 176/2008 on the certification of the energy characteristics of the buildings was completed. (VI. 30.) an energy quality certificate in accordance with Government Decree No 30/2001 and the energy concept for development. The unpriced budget for the project, the building engineer and the architectural technical specifications were completed, which was sent to the selected bidders in the framework of the request for quotation. Based on the priced budget of the general contractor with the lowest price, the eligible cost of the project has become final. The aid application was then finalised and submitted. The project does not involve any activity subject to authorisation, so consultation with the authorising authorities is not relevant. As part of the project’s preparation costs, construction planning is also accounted for, since the building was originally built with a gas boiler heating system, and a water-cooled liquid cooler is intended to cover the cooling energy, but in the meantime the district heating system in Szarvas has been set up, in which the hotel was connected to the network, in parallel with the gas boiler heating system, and the heating system is a system with bivalent design, in which the domestic hot water needs are covered by the gas boiler. Due to the complexity of the mechanical system, we decided that the construction works should be carried out on the basis of construction plans. The company carrying out the project management activity was selected by requesting 3 quotations based on a market survey. After the decision of the sponsor, the company that gave the winning bid will be responsible for the coordination of the project’s timely implementation and accounting. The implementation of the project is monitored by a technical inspector, who certifies the performance during the handover and that the contractor has complied with the legal and technical requirements. The task of project management will be to communicate with the Deputy State Secretariat of the Ministry of Finance for the implementation of Economic Development Programmes, to prepare and submit accounts and professional reports, to manage any changes that may arise through the EPTK interface. The project management organisation has the appropriate competence and relevant experience in implementing EU-funded energy projects. Due to character limitation, the project data sheet was attached in a separate declaration signed in the “Detailed presentation of the project” function. (English)
8 February 2022
0 references
La préparation du projet a été réalisée sur la base des critères définis et spécifiés dans l’appel. Dans un premier temps, la société d’experts en énergie a été sélectionnée en demandant 3 devis sur la base d’une étude de marché. Sur la base du contrat conclu avec l’adjudicataire, l’expert ayant le droit d’exécuter l’appel a effectué une visite sur place, sur la base de laquelle 176/2008 sur la certification des caractéristiques énergétiques des bâtiments a été achevée. (VI. 30.) un certificat de qualité énergétique conformément au décret gouvernemental no 30/2001 et le concept énergétique pour le développement. Le budget non facturé pour le projet, l’ingénieur du bâtiment et les spécifications techniques architecturales ont été achevés, qui a été envoyé aux soumissionnaires sélectionnés dans le cadre de la demande de devis. Sur la base du budget de l’entrepreneur général au prix le plus bas, le coût éligible du projet est devenu définitif. La demande d’aide a ensuite été finalisée et soumise. Le projet ne comporte aucune activité soumise à autorisation, de sorte que la consultation des autorités délivratrices n’est pas pertinente. Dans le cadre des coûts de préparation du projet, la planification de la construction est également prise en compte, puisque le bâtiment a été construit à l’origine avec un système de chauffage par chaudière à gaz et qu’un refroidisseur liquide refroidi à l’eau est destiné à couvrir l’énergie de refroidissement, mais entre-temps, le système de chauffage urbain à Szarvas a été mis en place, dans lequel l’hôtel était raccordé au réseau, parallèlement au système de chauffage par chaudière à gaz, et le système de chauffage est un système bivalent, dans lequel les besoins en eau chaude domestique sont couverts par la chaudière à gaz. En raison de la complexité du système mécanique, nous avons décidé que les travaux de construction devaient être réalisés sur la base de plans de construction. La société réalisant l’activité de gestion de projet a été sélectionnée en demandant 3 devis sur la base d’une étude de marché. Après la décision du promoteur, l’entreprise qui a donné l’offre gagnante sera responsable de la coordination de la mise en œuvre et de la comptabilité du projet en temps opportun. La mise en œuvre du projet est contrôlée par un inspecteur technique, qui certifie les performances lors de la remise et que le contractant a respecté les exigences légales et techniques. La gestion du projet aura pour mission de communiquer avec le Secrétariat d’État adjoint du Ministère des finances pour la mise en œuvre des programmes de développement économique, d’établir et de présenter des comptes et des rapports professionnels, de gérer tout changement qui pourrait survenir par l’intermédiaire de l’interface EPTK. L’organisme de gestion de projet possède les compétences et l’expérience appropriées dans la mise en œuvre des projets énergétiques financés par l’UE. En raison de la limitation des caractères, la fiche technique du projet a été jointe dans une déclaration distincte signée dans la fonction «Présentation détaillée du projet». (French)
10 February 2022
0 references
Szarvas, Békés
0 references
Identifiers
GINOP-4.1.2-18-2018-00212
0 references