Energy development with the use of renewable energy at Primer-Color Kft. (Q3924924): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claims)
(‎Changed an Item: fix budget)
Property / co-financing rate
 
44.2 percent
Amount44.2 percent
Unitpercent
Property / co-financing rate: 44.2 percent / rank
 
Normal rank
Property / budget
 
18,624,736.0 forint
Amount18,624,736.0 forint
Unitforint
Property / budget: 18,624,736.0 forint / rank
 
Normal rank
Property / budget
 
52,652.13 Euro
Amount52,652.13 Euro
UnitEuro
Property / budget: 52,652.13 Euro / rank
 
Preferred rank
Property / budget: 52,652.13 Euro / qualifier
 
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
Property / budget: 52,652.13 Euro / qualifier
 
point in time: 13 February 2022
Timestamp+2022-02-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / EU contribution
 
8,231,524.0 forint
Amount8,231,524.0 forint
Unitforint
Property / EU contribution: 8,231,524.0 forint / rank
 
Normal rank
Property / EU contribution
 
23,270.52 Euro
Amount23,270.52 Euro
UnitEuro
Property / EU contribution: 23,270.52 Euro / rank
 
Preferred rank
Property / EU contribution: 23,270.52 Euro / qualifier
 
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
Property / EU contribution: 23,270.52 Euro / qualifier
 
point in time: 13 February 2022
Timestamp+2022-02-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 10:18, 13 February 2022

Project Q3924924 in Hungary
Language Label Description Also known as
English
Energy development with the use of renewable energy at Primer-Color Kft.
Project Q3924924 in Hungary

    Statements

    0 references
    0 references
    8,231,524.0 forint
    0 references
    23,270.52 Euro
    0.002827 Euro
    13 February 2022
    0 references
    18,624,736.0 forint
    0 references
    52,652.13 Euro
    0.002827 Euro
    13 February 2022
    0 references
    44.2 percent
    0 references
    12 September 2019
    0 references
    31 December 2019
    0 references
    Primer-Color Szakipari Kivitelező és Kereskedelmi Korlátolt Felelősségű Társaság
    0 references
    0 references

    46°20'54.56"N, 18°42'5.98"E
    0 references
    A fejleszteni kívánt ingatlan a Primer-Color Kft. székhelye Szekszárdon a Tartsay utca 6. szám alatt fekszik (hrsz: 4089/C/1). Az ingatlan társasházi formában működik, a fejlesztéssel érintett épület a pályázó tulajdonában van. Az ingatlan legutóbb 15 éve került felújításra, a részleges felújítás eredménye nem felel meg a mai energetikai követelményeknek. A tervezett fejlesztés nem építési engedély köteles, az ingatlan közös tulajdonú részeit nem érinti, tereprendezés, funkcióváltás nem valósul meg. Az előkészítés során elkészültek a műszaki tervek (nem engedélyköteles építési tevékenység), a statikai szakvélemény (egy nyilatkozatban igazolta a statikus az épület állékonyságát és a tető alkalmasságát a napelemrendszer fogadására), az energetikai mellékletek, a feltételes kivitelezési szerződés. A fejlesztés során az épület homlokzataira és tetőfelületére új hőszigetelés kerül, cserére kerülnek a homlokzati nyílászárók, új kondenzációs gázkazán kerül beépítésre. Megvalósulnak az épületenergetikai beavatkozásokhoz kapcsolódó munkálatok, helyreállítások és javítások. Az épület energiaigényét a fejlesztést követően a tetőre elhelyezett napelem rendszer fogja szolgáltatni. A részletes műszaki paraméterek a műszaki leírásban olvashatók, a projekt energetikai jellemzői az energetikai mellékletben olvashatók. Az ügyvezető Renczes László komoly tapasztalattal rendelkezik a beruházások megvalósításában, a pályázati elszámolásban professzionális projektmenedzser nyújt segítséget. (Hungarian)
    0 references
    The property to be developed is located at 6 Tartsay Street in Szekszárd, Primer-Color Kft. (hrsz: 4089/C/1). The property is in the form of a condominium and the building concerned by the development is owned by the applicant. The property was last renovated 15 years ago, the result of the partial renovation does not meet today’s energy requirements. The planned development is not subject to a building permit, it does not affect the jointly owned parts of the property, landscaping or change of function is not realised. During the preparation, the technical plans (construction activities not subject to authorisation), the static opinion (in a statement, the static building’s stability and the suitability of the roof for the reception of the solar panel system), the energy annexes and the conditional construction contract were completed. During the development, new thermal insulation is introduced on the facades and roof surfaces of the building, the facade doors are replaced, a new condensation gas boiler is installed. Works, refurbishments and repairs related to building energy interventions will be carried out. The energy demand of the building will be provided by the solar panel system placed on the roof after the development. The detailed technical parameters can be found in the technical specifications, and the energy characteristics of the project can be found in the energy annex. The managing director László Renczes has considerable experience in the implementation of the investments, and a professional project manager assists in the application accounting. (English)
    8 February 2022
    0 references
    La propriété à développer est située au 6 Tartsay Street à Szekszárd, Primer-Color Kft. (hrsz: 4089/C/1). Le bien est sous la forme d’une copropriété et le bâtiment concerné par l’aménagement est la propriété du demandeur. La propriété a été rénovée pour la dernière fois il y a 15 ans, le résultat de la rénovation partielle ne répond pas aux besoins énergétiques d’aujourd’hui. L’aménagement prévu n’est pas assujetti à un permis de construire, il n’a pas d’incidence sur les parties communes du bien, l’aménagement paysager ou le changement de fonction n’est pas réalisé. Au cours de la préparation, les plans techniques (activités de construction non soumises à autorisation), l’avis statique (dans une déclaration, la stabilité du bâtiment statique et l’adéquation du toit à la réception du système de panneaux solaires), les annexes énergétiques et le contrat de construction conditionnel ont été achevés. Lors du développement, une nouvelle isolation thermique est introduite sur les façades et les toitures du bâtiment, les portes de façade sont remplacées, une nouvelle chaudière à gaz de condensation est installée. Les travaux, rénovations et réparations liés aux interventions énergétiques des bâtiments seront réalisés. La demande d’énergie du bâtiment sera assurée par le système de panneaux solaires placé sur le toit après le développement. Les paramètres techniques détaillés figurent dans les spécifications techniques, et les caractéristiques énergétiques du projet figurent dans l’annexe «énergie». Le directeur général László Renczes possède une expérience considérable dans la mise en œuvre des investissements, et un chef de projet professionnel assiste dans la comptabilité d’application. (French)
    10 February 2022
    0 references
    Szekszárd, Tolna
    0 references

    Identifiers

    GINOP-4.1.1-8-4-4-16-2017-00104
    0 references