Development of the Reformed Primary School of Lajos Erőss in Püspökladány (Q3903565): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claims)
(‎Changed an Item: fix budget)
Property / co-financing rate
 
100.0 percent
Amount100.0 percent
Unitpercent
Property / co-financing rate: 100.0 percent / rank
 
Normal rank
Property / budget
 
413,803,679.0 forint
Amount413,803,679.0 forint
Unitforint
Property / budget: 413,803,679.0 forint / rank
 
Normal rank
Property / budget
 
1,169,823.0 Euro
Amount1,169,823.0 Euro
UnitEuro
Property / budget: 1,169,823.0 Euro / rank
 
Preferred rank
Property / budget: 1,169,823.0 Euro / qualifier
 
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
Property / budget: 1,169,823.0 Euro / qualifier
 
point in time: 13 February 2022
Timestamp+2022-02-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / EU contribution
 
413,803,679.0 forint
Amount413,803,679.0 forint
Unitforint
Property / EU contribution: 413,803,679.0 forint / rank
 
Normal rank
Property / EU contribution
 
1,169,823.0 Euro
Amount1,169,823.0 Euro
UnitEuro
Property / EU contribution: 1,169,823.0 Euro / rank
 
Preferred rank
Property / EU contribution: 1,169,823.0 Euro / qualifier
 
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
Property / EU contribution: 1,169,823.0 Euro / qualifier
 
point in time: 13 February 2022
Timestamp+2022-02-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 02:02, 13 February 2022

Project Q3903565 in Hungary
Language Label Description Also known as
English
Development of the Reformed Primary School of Lajos Erőss in Püspökladány
Project Q3903565 in Hungary

    Statements

    0 references
    413,803,679.0 forint
    0 references
    1,169,823.0 Euro
    0.002827 Euro
    13 February 2022
    0 references
    413,803,679.0 forint
    0 references
    1,169,823.0 Euro
    0.002827 Euro
    13 February 2022
    0 references
    100.0 percent
    0 references
    1 September 2019
    0 references
    30 November 2021
    0 references
    Püspökladányi Református Egyházközség
    0 references
    0 references

    47°18'27.94"N, 21°6'34.74"E
    0 references
    A beruházással érintett intézmény két feladatellátási helyen üzemel. Az oktatás a 4150 Püspökladány, Kálvin tér 1-3., Hrsz.: 38 alatt található telken folyik. Az egyházközség tulajdonában van egy másik, a 4150 Püspökladány, Kálvin tér 6-7., Hrsz.: 846 alatt található telek is, melyen az iskolások étkeztetésére szolgáló épület található. Az oktatási célra használt telken jelenleg több épület is található, köztük az iskola, a parókia és a gyülekezeti ház épülete, kiegészítve egy raktár- és egy melléképülettel. Ezen a feladatellátási helyen állami támogatásból fog megvalósulni az iskola szabványosításának és bővítésének első szakasza, melynek épületet jelen pályázat keretei között megvalósítottnak tekintettük. Mivel az állami támogatás összegéből a szabvány szerinti teljes helyiségigény nem kivitelezhető, valamint a telek beépítési százaléka megközelíti a megengedett felső határt, így a tervezett további bővítések a 4150 Püspökladány, Kálvin tér 6-7., Hrsz.: 846 alatt található telken történnének megépítésre, kiegészítve a jelenlegi menzaépület felújításával és bővítésével. A további bővítésre azért lenne szükség, mert a rendelkezésre bocsájtott összegből az iskola szabványosítása a mindennapos testnevelés kivételével teljessé válna. Az első feladatellátási helyen az iskola működéséhez elengedhetetlen oktatás és a mindennapos testnevelés feltételei adottak. Itt került kialakításra 16 szabvány méretű tanterem, a szintenként kötelező illemhelycsoportok, a tantestület (tantestületi szoba, tanári öltözők és illemhelyiségek) és igazgatás (igazgatói, igazgatóhelyettesei, gazdasági és ügyviteli irodák) helyiségei, a karbantartók és egyéb iskolai alkalmazottak számára kialakított öltözők, valamint egy B jelű tornaterem, a hozzá tartozó szertárral, nemenként kettő öltözőegységgel és két testnevelőtanári szobával, küzdőtéri WC egységekkel. A pályázat tárgyául szolgáló bővítés a második feladatellátási helyen, a 4150 Püspökladány, Kálvin tér 6-7., Hrsz.: 846 alatt valósulna meg. Az említett telken jelenleg 3 épület található: a menzaépület, az egykori kántorlakás és a hozzá tartozó melléképület. Az építés következtében az egykori kántorlakás melléképületét mindenképpen szükséges elbontani. A kántorlakás épülete megtartása nem indokolt, mivel állapota eléggé leromlott és átfogó felújítást igényelne. A meglévő menzaépület is teljeskörű felújítást igényel, amely magába foglalja a belső fejtést, ablakok cseréjét, hőszigetelést és tetőhéjazat cserét. Belső helyiségeit is át kell szervezni a megfelelő működtethetőség elérése érdekében. A menza jelenleg egy melegítőkonyhával üzemel, és továbbra is így fog működni, azonban nem elégíti a melegítőkonyha helyiségeivel kapcsolatban támasztott követelményeket, meglévő helyiségeinek mérete és kapcsolatai pedig nem megfelelőek. A jelenlegi helyiségei közül csupán a két étkezőtér és a konyhához tartozó illemhelyek maradnak változtatás nélkül, a többi helyiség válaszfalai elbontásra kerülnek. Az így kialakult folyosón tudják majd elérni a gyermekek a tálaló és az átadó ablakait. A konyha az épület déli oldalán kerül kialakításra egy bővítésben. A tervezett melegítőkonyha megfelel az iskola számára szükséges ételmennyiség melegítéséhez és annak felszolgálásához. A konyha áll egy átvevőből, egy a konyhai alkalmazottak számára tervezett öltözőblokkból, illemhelyiséggel és zuhanyozóval, egy raktárból, takarítószertárból, konyhatérből, átvevő- és mosogatótérből, és egy közvetlenül külső kapcsolattal rendelkező hulladék- és mosléktárolóból. A felújított menzaépülethez a terv szerint szervesen csatlakozik az oktatási infrastruktúra teljessé válásához szükséges épülettömeg. Az oktatási épületrész természetesen saját bejárattal rendelkezik. Egy szélfogón keresztül jutunk be az épület aulaterébe, melyből egy kör alakú galériára látunk fel. A földszinten található az íves lépcsőkar alatt elhelyezett porta két helyisége, a könyvtár és könyvraktár, 3 szaktanterem a hozzá tartozó szertárakkal, valamint a szintenként kötelező illemhelycsoportok. A szintek közötti akadálymentes közlekedésre egy lift ad megoldást. Az emeletre való feljutás után egy körfolyosóra érkezünk, amelyből az alsó szint mintájára nyílnak a még szükséges szaktanterek és szertáraik, a tanári szoba és teakonyha, valamint a tanári öltözők, valamint a diákok illemhelycsoportja. Az aula fölött egy kupola kerül kialakításra, felülvilágítóval, az emeleti körfolyosó megfelelő megvilágítását pedig további, a lapostetőn elhelyezett felülvilágítók biztosítják. Az épület pillérvázas, a vázkitöltő falazat a többszintes oktatási rész esetében 30 cm vastag, 10 cm EPS rendszerrel hőszigetelve, műanyag rendszerű, 70-72 cm tokvastagságú, háromrétegű üvegezéssel ellátott nyílászárókkal. A tervezett épület a szabványban leírtaknak teljes mértékben megfelel. A terv nagy hangsúlyt helyez a hatékony helykihasználásra és a funkcionális egységek megteremtésére, valamint a meglévő környezet védelmére. (Hungarian)
    0 references
    The institution concerned by the investment operates in two places of responsibility. The education of 4150 Bishops, Kálvin tér 1-3., Hrsz.: It runs on a plot under 38. The parish owns another, the 4150 Bishopladány, Kálvin tér 6-7., Hrsz.: There is also a plot of land under 846, on which the schoolchildren’s catering building is located. There are currently several buildings on the educational plot, including the school, the parish and the congregational house, together with a warehouse and an outbuilding. The first stage of standardisation and expansion of the school will be realised through state aid at this site, which was considered to have been completed within the framework of the present tender. As the total space requirement according to the standard is not feasible from the amount of the state aid, and the percentage of the construction of the plot is close to the permitted ceiling, the planned further extensions are 4150 Püspökladány, Kálvin tér 6-7., Hrsz.: It would be built on a plot of land under 846, complemented by the renovation and expansion of the current canteen building. Further enlargement would be necessary because of the amount made available to complete the standardisation of the school, with the exception of day-to-day physical education. In the first place of assignment, the education and everyday physical education conditions are essential for the operation of the school. This is where 16 standard classrooms, mandatory toilet groups per level, rooms of the teaching staff (teacher room, teacher changing rooms and toilets) and administration (directors, deputy directors, economic and administrative offices), changing rooms for maintenance and other school staff, as well as a gym “B” with a suitcase, two changing rooms per sex and two body educators’ rooms and combat toilet units were set up. The subject of the tender is the extension of the second task place, the 4150 Püspökladány, Kálvin tér 6-7., Hrsz.: It would take place in 846. There are currently 3 buildings on this plot: the canteen building, the former canopy house and the related outbuilding. As a result of the construction, it is absolutely necessary to dismantle the outbuilding of the former canopy house. It is not justified to keep the canopy building, as its condition has deteriorated enough and would require a comprehensive renovation. The existing canteen building also requires a complete renovation, which includes internal quarrying, replacement of windows, thermal insulation and roofing. Its interiors shall also be reorganised in order to achieve proper operation. The canteen currently operates with a heating kitchen and will continue to operate in this way, but it does not meet the requirements of the heating kitchen, and the size and connections of its existing rooms are inadequate. Of the current rooms, only the two dining rooms and toilets for the kitchen remain unaltered, and the partitions of the other rooms are dismantled. In this way, children will be able to access the windows of the pantry and the handover. The kitchen is designed on the south side of the building in an expansion. The planned heating kitchen is suitable for heating and serving the amount of food needed by the school. The kitchen consists of a receiver, a changing room designed for kitchen employees, a toilet and a shower, a warehouse, a cleaning room, a kitchenette, a reception and sink room, and a waste and laundry storage facility with direct external connections. The refurbished canteen building is planned to be integrated with the building mass needed to complete the educational infrastructure. The educational part of the building has its own entrance of course. We get through a windscreen into the aulater of the building, from which we can see a circular gallery. On the ground floor there are two rooms of the port located under the arched staircase, the library and bookrooms, 3 specialised rooms with the corresponding merchandise, and the mandatory toilet groups per floor. An elevator is the solution for unobstructed traffic between levels. After getting to the floor, we arrive on a round corridor, from which the remaining specialists and serpents, the teacher’s room and kitchen, the teacher’s changing rooms and the classrooms of the students open on the same lines as the lower floor. Above the aula there is a dome with an overlighter, while the upstairs circular corridor is adequately lit by additional overlights placed on the flat roof. The building has a pillar frame, the frame filler masonry for the multi-storey educational section is 30 cm thick, with 10 cm EPS system heat-insulated, plastic system, 70-72 cm case thickness, three-layer glazed windows. The planned building is in full compliance with the standard. The plan puts great emphasis on efficient use of space and the creation of functional units, as well as the protection of the existing environment. (English)
    8 February 2022
    0 references
    Das von der Investition betroffene Institut ist an zwei Verantwortlichkeiten tätig. Die Ausbildung von 4150 Bischöfen, Kálvin tér 1-3., Hrsz.: Es läuft auf einem Grundstück unter 38. Die Gemeinde besitzt einen anderen, die 4150 Bishopladány, Kálvin tér 6-7., Hrsz.: Es gibt auch ein Grundstück unter 846, auf dem sich das Haus für Schulkinder befindet. Auf dem Bildungsgrundstück befinden sich derzeit mehrere Gebäude, darunter die Schule, die Pfarrei und das Gemeindehaus, zusammen mit einem Lagerhaus und einem Nebengebäude. Die erste Stufe der Standardisierung und Erweiterung der Schule wird durch staatliche Beihilfen an diesem Standort verwirklicht, die im Rahmen der vorliegenden Ausschreibung als abgeschlossen galten. Da der Gesamtraumbedarf nach der Norm aus der Höhe der staatlichen Beihilfe nicht möglich ist und der Anteil des Baus des Grundstücks nahe der zulässigen Obergrenze liegt, sind die geplanten weiteren Erweiterungen 4150 Püspökladány, Kálvin tér 6-7., Hrsz.: Es würde auf einem Grundstück unter 846 gebaut werden, ergänzt durch die Renovierung und Erweiterung des derzeitigen Kantinengebäudes. Eine weitere Erweiterung wäre erforderlich, da der Betrag, der für die Vollendung der Standardisierung der Schule zur Verfügung gestellt wird, mit Ausnahme der täglichen körperlichen Bildung erforderlich wäre. An erster Stelle des Einsatzes sind die Bildungs- und Alltagsbedingungen für den Betrieb der Schule von wesentlicher Bedeutung. Hier wurden 16 Standard-Klassen, obligatorische Toilettengruppen pro Ebene, Räume des Lehrpersonals (Lehrerzimmer, Umkleideräume für Lehrer und Toiletten) und Verwaltung (Direktoren, stellvertretende Direktoren, Wirtschafts- und Verwaltungsbüros), Umkleideräume für Wartung und sonstiges Schulpersonal sowie ein Fitnessstudio „B“ mit Koffer, zwei Umkleideräume pro Geschlecht und zwei Körperpädagogenräume und Kampftoilitäten eingerichtet. Gegenstand des Angebots ist die Verlängerung des zweiten Aufgabenorts, der 4150 Püspökladány, Kálvin tér 6-7., Hrsz.: Sie findet im Jahr 886 statt. Es gibt derzeit 3 Gebäude auf diesem Grundstück: das Kantinengebäude, das ehemalige Baldachinhaus und das dazugehörige Nebengebäude. Als Ergebnis des Baus ist es absolut notwendig, das Nebengebäude des ehemaligen Baldachinhauses abzubauen. Es ist nicht gerechtfertigt, das Überdachungsgebäude zu erhalten, da sich der Zustand des Gebäudes verschlechtert hat und eine umfassende Renovierung erforderlich wäre. Das bestehende Kantinengebäude erfordert auch eine komplette Renovierung, einschließlich der internen Steinbrüche, des Austauschs von Fenstern, der Wärmedämmung und der Bedachung. Seine Innenräume müssen ebenfalls neu organisiert werden, um einen ordnungsgemäßen Betrieb zu erreichen. Die Kantine arbeitet derzeit mit einer Heizungsküche und wird weiterhin auf diese Weise arbeiten, aber sie erfüllt nicht die Anforderungen der Heizungsküche, und die Größe und die Verbindungen der bestehenden Räume sind unzureichend. Von den aktuellen Räumen bleiben nur die beiden Esszimmer und Toiletten für die Küche unverändert, und die Trennwände der anderen Räume werden abgebaut. Auf diese Weise können Kinder auf die Fenster der Speisekammer und die Übergabe zugreifen. Die Küche ist auf der Südseite des Gebäudes in einer Erweiterung entworfen. Die geplante Heizungsküche eignet sich zum Heizen und Servieren der Menge an Nahrungsmitteln, die von der Schule benötigt werden. Die Küche besteht aus einem Empfänger, einem Umkleideraum für Küchenangestellte, einer Toilette und einer Dusche, einem Lagerhaus, einem Reinigungsraum, einer Kochnische, einem Empfangs- und Waschbeckenraum sowie einem Abfall- und Waschraum mit direkter Außenanbindung. Das renovierte Kantinengebäude soll in die Gebäudemasse integriert werden, die zur Fertigstellung der Bildungsinfrastruktur benötigt wird. Der pädagogische Teil des Gebäudes hat natürlich einen eigenen Eingang. Wir kommen durch eine Windschutzscheibe in das Aulat des Gebäudes, von dem aus wir eine kreisförmige Galerie sehen können. Im Erdgeschoss befinden sich zwei Räume des Hafens unter der gewölbten Treppe, die Bibliothek und die Buchräume, 3 spezialisierte Zimmer mit der entsprechenden Ware und die obligatorischen WC-Gruppen pro Etage. Ein Aufzug ist die Lösung für den freien Verkehr zwischen den Ebenen. Nachdem wir auf den Boden gekommen sind, kommen wir auf einem runden Flur an, von dem die restlichen Spezialisten und Schlangen, das Zimmer und die Küche des Lehrers, die Umkleideräume des Lehrers und die Klassenräume der Schüler auf den gleichen Linien wie die untere Etage öffnen. Oberhalb der Aula befindet sich eine Kuppel mit einem Überlichter, während der obere Rundgang durch zusätzliche OverLights auf dem Flachdach ausreichend beleuchtet wird. Das Gebäude hat einen Säulenrahmen, der Rahmenfüller Mauerwerk für den mehrgeschossigen Bildungsabschnitt ist 30 cm dick, mit 10 cm EPS-System wärmeisoliert, Kunststoffsystem, 70-72 cm Gehäusedicke, dreilagige verglaste Fenster. Da... (German)
    9 February 2022
    0 references
    L’institution concernée par l’investissement opère dans deux lieux de responsabilité. L’éducation de 4150 Evêques, Kálvin tér 1-3., Hrsz.: Il fonctionne sur un terrain de moins de 38 ans. La paroisse possède une autre, le 4150 Bishopladány, Kálvin tér 6-7., Hrsz.: Il y a aussi un terrain de moins de 846, sur lequel se trouve le bâtiment de restauration des écoliers. Il y a actuellement plusieurs bâtiments sur le terrain éducatif, y compris l’école, la paroisse et la maison de congrégation, ainsi qu’un entrepôt et une dépendance. La première phase de normalisation et d’expansion de l’école sera réalisée au moyen d’une aide d’État sur ce site, qui a été considérée comme achevée dans le cadre du présent appel d’offres. Étant donné que le montant de l’aide d’État ne permet pas d’obtenir l’espace total requis conformément à la norme et que le pourcentage de la construction de la parcelle est proche du plafond autorisé, les extensions supplémentaires prévues sont de 4150 Püspökladány, Kálvin tér 6-7., Hrsz.: Il serait construit sur un terrain de moins de 846, complété par la rénovation et l’agrandissement du bâtiment actuel de la cantine. Un nouvel élargissement serait nécessaire en raison du montant mis à disposition pour achever la normalisation de l’école, à l’exception de l’éducation physique quotidienne. En premier lieu, les conditions d’éducation et d’éducation physique quotidiennes sont essentielles au fonctionnement de l’école. C’est là qu’ont été aménagées 16 salles de classe standard, des groupes de toilettes obligatoires par niveau, des salles du personnel enseignant (salle des enseignants, vestiaires et toilettes des enseignants) et de l’administration (directeurs, directeurs adjoints, bureaux économiques et administratifs), des vestiaires pour l’entretien et d’autres personnels scolaires, ainsi qu’une salle de gym «B» avec une valise, deux vestiaires par sexe et deux salles d’éducation corporelle et des toilettes de combat. L’objet de l’offre est l’extension du deuxième lieu de travail, le 4150 Püspökladány, Kálvin tér 6-7., Hrsz.: Elle aurait lieu en 846. Il y a actuellement 3 bâtiments sur ce terrain: le bâtiment de la cantine, l’ancienne canopée et la dépendance connexe. En raison de la construction, il est absolument nécessaire de démanteler la dépendance de l’ancienne maison auvent. Il n’est pas justifié de conserver le bâtiment auvent, car son état s’est suffisamment détérioré et nécessiterait une rénovation complète. Le bâtiment de cantine existant nécessite également une rénovation complète, qui comprend l’exploitation de carrières internes, le remplacement des fenêtres, l’isolation thermique et la toiture. Ses intérieurs doivent également être réorganisés afin d’assurer le bon fonctionnement. La cantine fonctionne actuellement avec une cuisine de chauffage et continuera à fonctionner de cette manière, mais elle ne répond pas aux exigences de la cuisine de chauffage, et la taille et les connexions de ses locaux existants sont inadéquats. Parmi les chambres actuelles, seules les deux salles à manger et les toilettes pour la cuisine restent inchangées, et les cloisons des autres pièces sont démontées. De cette façon, les enfants pourront accéder aux fenêtres du garde-manger et à la remise. La cuisine est conçue sur le côté sud du bâtiment dans une expansion. La cuisine de chauffage prévue convient au chauffage et au service de la quantité de nourriture nécessaire à l’école. La cuisine se compose d’un récepteur, d’un vestiaire conçu pour les employés de cuisine, d’une toilette et d’une douche, d’un entrepôt, d’une salle de nettoyage, d’une kitchenette, d’une réception et d’un lavabo, ainsi que d’un dépôt de déchets et de buanderie avec connexions externes directes. Le bâtiment rénové de la cantine devrait être intégré à la masse nécessaire à l’achèvement de l’infrastructure éducative. La partie éducative du bâtiment a sa propre entrée bien sûr. Nous traversons un pare-brise dans l’au-delà du bâtiment, d’où nous pouvons voir une galerie circulaire. Au rez-de-chaussée, il y a deux salles du port situées sous l’escalier voûté, la bibliothèque et les salles de livres, 3 salles spécialisées avec les marchandises correspondantes, et les groupes de toilettes obligatoires par étage. Un ascenseur est la solution pour le trafic libre entre les niveaux. Après être arrivés à l’étage, nous arrivons sur un couloir rond, à partir duquel les spécialistes et serpents restants, la salle de l’enseignant et la cuisine, les vestiaires de l’enseignant et les salles de classe des élèves s’ouvrent sur les mêmes lignes que l’étage inférieur. Au-dessus de l’aula il y a un dôme avec un briquet, tandis que le couloir circulaire à l’étage est suffisamment éclairé par des OverLights supplémentaires placés sur le toit plat. Le bâtiment dispose d’un cadre en piliers, la maçonnerie de remplissage de cadre pour la section éducative multi-étages est de 30 cm d’épaisseur, avec système EPS 10 cm isolé thermique, système pla... (French)
    10 February 2022
    0 references
    Püspökladány, Hajdú-Bihar
    0 references

    Identifiers

    EFOP-4.1.5-16-2017-00109
    0 references