Infrastructure development of Nyíregyháza Arany János High School and Primary School College (Q3903481): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Adding French translations) |
(Removed claims) |
||||||||||||||
Property / co-financing rate | |||||||||||||||
| |||||||||||||||
Property / co-financing rate: 84.999994 percent / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 76,637,656 forint / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 211,919.21 Euro / rank | |||||||||||||||
Property / EU contribution: 211,919.21 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 211,919.21 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 246,469.01 Euro / rank | |||||||||||||||
Property / budget: 246,469.01 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 246,469.01 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 90,161,948.235 forint / rank | |||||||||||||||
Revision as of 02:01, 13 February 2022
Project Q3903481 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Infrastructure development of Nyíregyháza Arany János High School and Primary School College |
Project Q3903481 in Hungary |
Statements
1 December 2017
0 references
31 December 2018
0 references
Nyíregyházi Tankerületi Központ
0 references
A Nyíregyházi Tankerületi Központ szakmai munkatársai közreműködésével előzetesen felmérte az épületek műszaki állapotát és felújítási programot állított össze. A projekt keretében a kollégium részleges felújítása valósulhat meg. Az ingatlanon tervezett építési tevékenység végzésével az építésügyi és építésfelügyeleti hatósági eljárásokról és ellenőrzésekről, valamint az építésügyi hatósági szolgáltatásról 312/2012. (XI. 8.) Korm. rendelet értelmében a meglévő építmény tartószerkezeti rendszerét vagy tartószerkezeti elemeit nem kell megváltoztatni, átalakítani, elbontani, kicserélni, megerősíteni, vagy változatlan formában újjáépíteni. Ezen oknál fogva a tervezett építési munkák nem építési engedély kötelesek. Cél a kollégiumok a minőségi és befogadó oktatási környezet és hatékony nevelés infrastrukturális feltételeinek megteremtése. Racionális és hatékony működést biztosító, korszerű nevelési, oktatási környezet kialakítása, különösen a tanulást segítő és közösségi terek tekintetében. Kötelezően megvalósítandó önállóan támogatható tevékenységek közül megvalósítandó: - A kollégiumi neveléshez szükséges infrastruktúra felújítása, eszközök beszerzése (tanulószobák, közösségi tanulásra alkalmas helyiség felújítása, kialakítása a meglévő infrastruktúra bővítése nélkül, lakószobák felújítása). Választható, önállóan nem támogatható tevékenységek közül megvalósítandó: - Tetőszerkezet felújítása. - Energetikai korszerűsítés - Nyílászárók cseréje, korszerű, energia hatékonyságot biztosító kivitelben. Tervezett munkálatok: 1. Főépület tetőhéjazat cseréje: A kollégium épületegyüttesének jelentős részén a korábbiakban már lecserélték a tetőhéjazatot. A még megmaradt két szárnyon a hagyományos cserépfedés több helyen hiányos, elhasználódott állapotban van, ezért cserélni szükséges. 2. Kültéri munkák: - Az udvari bejárat és mellette lévő a pincelejáró közös előtetőjén a meglévő szerkezetre új fedés készül horganyzott acél cserepeslemezzel. - Az épület déli oldalán található angolaknát fel kell újítani. A felfagyott részeket el kell bontani és újraépíteni. - Két bejárati ajtónál akadálymentes rámpa készítése, illetve a betonozás javítása. 3. Beltéri munkák: - Meglévő fa ablakok és ajtók cseréje hőszigetelt üvegezésű PVC nyílászárókra (Uw<=1,15 W/m2K), külső párkányok és belső könyöklők cseréjével, belül a tokok körül PVC szegély takarókkal. - A nyílászárók cseréje után a kávákat, és egyéb sérült felületeket ki kell javítani. - Festés teljes belső felületen diszperziós festékkel. - PVC padlóburkolatok cseréje a korábbi felújításból kimaradt helyeken. - Laminált parketta padlóburkolatok cseréje a korábbi felújításból kimaradt helyeken. (Hungarian)
0 references
With the help of the professional staff of the Nyíregyháza School District Centre, the technical state of the buildings was assessed in advance and a renovation programme was compiled. The project may involve a partial renovation of the college. By carrying out planned construction activities on the property, on the official procedures and controls in the field of construction and construction supervision and on the construction official service 312/2012. (XI. 8.) According to Government Decree No 8/2015, the supporting structure system or structural elements of an existing building need not be altered, modified, demolished, replaced, reinforced or rebuilt in the unaltered form. For that reason, the planned construction works are not subject to a building permit. The aim is to create the infrastructure conditions for a quality and inclusive educational environment and effective education. The development of a modern educational and educational environment ensuring rational and efficient operation, in particular as regards learning and community spaces. Of the self-eligible activities to be carried out on a compulsory basis: — Refurbishment of the infrastructure necessary for college education, purchase of equipment (renovation of learning rooms, room suitable for community learning, development without extension of existing infrastructure, renovation of living rooms). Of optional, ineligible actions to be implemented: — Refurbishment of roof structure. — Energy modernisation — Replacement of opening lockers in modern, energy efficient design. Planned works: 1. Main building roofing replacement: A significant part of the dorm building complex has previously been replaced. On the remaining two wings, the traditional tile cover is deficient and worn out in several places, so it is necessary to replace it. 2. Outdoor work: — On the common roof of the yard entrance and the cellar next to it, a new cover for the existing structure is made with galvanised steel tiles. — The eel mine on the south side of the building needs to be renovated. The frozen parts must be dismantled and rebuilt. — The creation of a barrier-free ramp at two entrance doors and the improvement of concrete. 3. Indoor work: — Replacement of existing wooden windows and doors for thermally insulated PVC doors and windows (Uw<=1,15 W/m2K), replacement of outer sills and interior elbows, inside the enclosures with PVC border blankets. — After replacement of doors and windows, the coats and other damaged surfaces must be repaired. — Painting on the whole inner surface with dispersion paint. — Replacement of PVC floor coverings in places not included in previous renovation. — Laminated parquet flooring replacement in places that were omitted from previous renovation. (English)
8 February 2022
0 references
Mit Hilfe des professionellen Personals des Schulbezirkszentrums Nyíregyháza wurde der technische Zustand der Gebäude im Voraus bewertet und ein Renovierungsprogramm erstellt. Das Projekt kann eine teilweise Renovierung des Kollegiums umfassen. Durch die Durchführung geplanter Bautätigkeiten auf dem Grundstück, der amtlichen Verfahren und Kontrollen im Bereich der Bau- und Bauaufsicht und des öffentlichen Baudienstes 312/2012. (XI. 8.) Nach Regierungsdekret Nr. 8/2015 müssen das Tragwerkssystem oder die Strukturelemente eines bestehenden Gebäudes nicht verändert, verändert, abgerissen, ersetzt, verstärkt oder in unveränderter Form wieder aufgebaut werden. Aus diesem Grund unterliegen die geplanten Bauarbeiten keiner Baugenehmigung. Ziel ist es, die Infrastrukturbedingungen für ein hochwertiges und inklusives Bildungsumfeld und eine effektive Bildung zu schaffen. Entwicklung eines modernen Bildungs- und Bildungsumfelds, das einen rationellen und effizienten Betrieb gewährleistet, insbesondere in Bezug auf Lern- und Gemeinschaftsräume. Der obligatorischen Durchführung der selbst förderfähigen Tätigkeiten: — Renovierung der für die Hochschulausbildung erforderlichen Infrastruktur, Anschaffung von Ausrüstung (Renovierung von Lernräumen, Raum für das Lernen der Gemeinschaft, Entwicklung ohne Erweiterung der bestehenden Infrastruktur, Renovierung von Wohnzimmern). Fakultative, nicht förderfähige Maßnahmen, die durchzuführen sind: — Renovierung der Dachkonstruktion. — Energiemodernisierung – Ersetzen von Öffnungsfächern in modernem, energieeffizientem Design. Geplante Arbeiten: 1. Ersatz des Hauptgebäudes: Ein erheblicher Teil des Wohnheimgebäudes wurde zuvor ersetzt. Auf den restlichen zwei Flügeln ist die traditionelle Fliesenabdeckung mangelhaft und an mehreren Stellen abgenutzt, so ist es notwendig, sie zu ersetzen. 2. Außenarbeit: — Auf dem gemeinsamen Dach des Hofeingangs und des Kellers daneben wird eine neue Abdeckung für die bestehende Struktur mit verzinkten Stahlfliesen hergestellt. — Die Aalmine auf der Südseite des Gebäudes muss renoviert werden. Die gefrorenen Teile müssen zerlegt und wieder aufgebaut werden. — Die Schaffung einer barrierefreien Rampe an zwei Eingangstüren und die Verbesserung des Betons. 3. Innenarbeit: — Ersatz vorhandener Holzfenster und Türen für thermisch isolierte PVC-Türen und Fenster (Uw<=1,15 W/m2K), Ersatz von Außenschwellen und Innenellenbogen, innerhalb der Gehäuse mit PVC-Grenzdecken. — Nach dem Austausch von Türen und Fenstern müssen die Mäntel und andere beschädigte Oberflächen repariert werden. — Malerei auf der gesamten Innenfläche mit Dispersionsfarbe. — Ersatz von PVC-Bodenbelägen an Orten, die nicht in der vorherigen Renovierung enthalten sind. — Laminierter Parkettwechsel an Stellen, die bei der vorherigen Renovierung weggelassen wurden. (German)
9 February 2022
0 references
Avec l’aide du personnel professionnel du centre scolaire de Nyíregyháza, l’état technique des bâtiments a été évalué à l’avance et un programme de rénovation a été élaboré. Le projet peut comporter une rénovation partielle du collège. En réalisant des activités de construction planifiées sur le bien, sur les procédures et contrôles officiels dans le domaine de la construction et de la supervision de la construction et sur le service officiel de construction 312/2012. (XI. 8.) En vertu du décret gouvernemental no 8/2015, il n’est pas nécessaire de modifier, de modifier, de démouler, de remplacer, de renforcer ou de reconstruire le système de structure ou les éléments structuraux d’un bâtiment existant. Pour cette raison, les travaux de construction prévus ne sont pas soumis à un permis de construire. L’objectif est de créer les conditions de l’infrastructure pour un environnement éducatif de qualité et inclusif et une éducation efficace. Le développement d’un environnement éducatif et éducatif moderne assurant un fonctionnement rationnel et efficace, notamment en ce qui concerne les espaces d’apprentissage et les espaces communautaires. Des activités auto-éligibles devant être exercées sur une base obligatoire: — Remise en état des infrastructures nécessaires à l’enseignement collégial, achat d’équipements (rénovation des salles d’apprentissage, salle adaptée à l’apprentissage communautaire, développement sans extension des infrastructures existantes, rénovation des salles de séjour). D’actions facultatives et inéligibles à mettre en œuvre: — Remise à neuf de la structure du toit. — Modernisation de l’énergie — Remplacement des casiers d’ouverture dans un design moderne et économe en énergie. Travaux prévus: 1. Remplacement de la toiture du bâtiment principal: Une partie importante du complexe du dortoir a déjà été remplacée. Sur les deux ailes restantes, la couverture traditionnelle est déficiente et usée à plusieurs endroits, il est donc nécessaire de la remplacer. 2. Travaux à l’extérieur: — Sur le toit commun de l’entrée de la cour et de la cave à côté, un nouveau couvercle pour la structure existante est réalisé avec des tuiles en acier galvanisé. — La mine d’anguilles du côté sud du bâtiment doit être rénovée. Les pièces congelées doivent être démontées et reconstruites. — La création d’une rampe sans barrière à deux portes d’entrée et l’amélioration du béton. 3. Travaux à l’intérieur: — Remplacement des fenêtres et des portes en bois existantes pour portes et fenêtres en PVC à isolation thermique (Uw<=1,15 W/m2K), remplacement des seuils extérieurs et coudes intérieurs, à l’intérieur des enceintes par des couvertures de bordure en PVC. — Après le remplacement des portes et des fenêtres, les revêtements et autres surfaces endommagées doivent être réparés. — Peinture sur toute la surface intérieure avec de la peinture à dispersion. — Remplacement des revêtements de sol en PVC dans des endroits non inclus dans la rénovation précédente. — Remplacement des parquets stratifiés dans des endroits qui ont été omis lors de la rénovation précédente. (French)
10 February 2022
0 references
Nyíregyháza, Szabolcs-Szatmár-Bereg
0 references
Identifiers
EFOP-4.1.3-17-2017-00454
0 references