Renewal of the infrastructure of the Utassy József Primary School (Q3902714): Difference between revisions
Jump to navigation
Jump to search
(Removed claims) |
(Changed an Item: fix budget) |
||||||||||||||
Property / co-financing rate | |||||||||||||||
100.0 percent
| |||||||||||||||
Property / co-financing rate: 100.0 percent / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
29,544,910.0 forint
| |||||||||||||||
Property / budget: 29,544,910.0 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
83,523.46 Euro
| |||||||||||||||
Property / budget: 83,523.46 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / budget: 83,523.46 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / budget: 83,523.46 Euro / qualifier | |||||||||||||||
point in time: 13 February 2022
| |||||||||||||||
Property / EU contribution | |||||||||||||||
29,544,910.0 forint
| |||||||||||||||
Property / EU contribution: 29,544,910.0 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
83,523.46 Euro
| |||||||||||||||
Property / EU contribution: 83,523.46 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 83,523.46 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / EU contribution: 83,523.46 Euro / qualifier | |||||||||||||||
point in time: 13 February 2022
|
Revision as of 01:56, 13 February 2022
Project Q3902714 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Renewal of the infrastructure of the Utassy József Primary School |
Project Q3902714 in Hungary |
Statements
29,544,910.0 forint
0 references
29,544,910.0 forint
0 references
100.0 percent
0 references
1 January 2018
0 references
30 November 2018
0 references
Hatvani Tankerületi Központ
0 references
Az Utassy József Általános Iskola felújítandó épületének jelenlegi állapota az oktatási céloknak nem megfelelő, azt raktárnak használják. Az épület helyzeténél fogva felújítás után alkalmassá válhat a zenei-, művészeti nevelés színhelyévé, könyvtári helyiség kialakításával jól kiegészítheti a mellette található iskolaépület funkcióit. Jelenleg az épületben megtalálható helyiségek nem felelnek meg a jogszabályban megfogalmazott követelményeknek. A tervezett átalakítás után, belső válaszfalak áthelyezésével megfelelő méretű termek alakíthatók ki. Az épület jelenlegi állapotában nem energiahatékony, nem akadálymentes. A belső burkolatok elhasználódtak, elkoptak, a mosdó helyiségek nagyon leromlott állapotban vannak. A csempék, a padlóburkolók több mint 25 évesek. Az épület fűtési rendszere elavult, nem korszerű, nem hatékony. A projekt az alábbi tevékenységek megvalósulását tartalmazza: 1. Az épület belső padlóburkolatainak cseréje Válaszfalak áthelyezésével 4 terem kialakítása, melyek a művészeti oktatási termek és könyvtár helyiség kialakítását teszik lehetővé. Az épületben található mosdók korszerűsítése, akadálymentessé tétele. A mosdó, termek, közlekedők burkolatának bontása 135 m2-en. Új padlóburkolatok lefektetése mázas kerámialapok, a termek meleg vagy félmeleg burkolatok kialakítása összesen 135 m2 területen. A mosdókban oldalfali csempék lerakása megközelítőleg 52 m2-en. 2. Épületgépészeti, villamos munkák Az egész épületen belül a villamos hálózat korszerűsítése, armatúrák cseréje, kapcsolók, dugaljak cseréje. Az épület fűtési rendszerének korszerűsítése, a kazán cseréje, a hőleadói oldal (radiátorok) cseréje. A mosdókban a vízvezeték szerelési munkák, a szaniterek cseréje. 3. Belső felületek festése Az épületen belüli falfelületek festése, 568 m2-en. Belső felületek előkészítése, két rétegben fehér vagy gyárilag színezett festékkel. 4. Szigetelés és vakolás, festés Az épület padlásfödémének és külső oldalainak hőszigetelése. 156 m2-en elhelyezett födém hőszigetelés, és 180 m2-nyi külső oldali hőszigetelés normál homlokzati EPS lapokkal, üveg szövetháló erősítéssel. A homlokzat festése egyrétegű színezett nemesvakolattal 180 m2-en, a lábazat festése műgyantás kötőanyagú vakolatréteggel 28 m2-en. 5. Nyílászárók cseréje A régi, korszerűtlen fa nyílászáró szerkezetek bontása legalább 2 m2-ig. Az épületen belül 4 db beltéri kazettás ajtó cseréje, beépítése, az ajtó mérete: 75*210 cm. Továbbá 5 db 100*210 cm-es méretű fa beltéri MDF vagy keményhéjszerkezetes ajtó elhelyezése előre kihagyott fanyílásba. Műanyag kültéri nyílászárók, hőszigetelt, fokozott légzárású ablakok elhelyezése előre kihagyott fanyílásba. 2 db 0,90*0,60 méter, 6 db 2,40*1,50 és 1 db 1,20*1,50 méretű ablak beépítése. Tovább 2 db 1,00*2,10 méter és 1 db 1,40*2,40 méter méretű ajtó cseréje. 6. Egyéb feladatok Állványozás, törmelék elszállítás, takarítás, javítási munkák. A projektarányos akadálymentesítés megvalósul. Az épületen akadálymentes bejárat és mosdó kialakításra kerül, megvalósul az infokommunikációs akadálymentesítés is, vezetősávok, csúszásmentes burkolatok kialakításával. 7. Eszközbeszerzés Az eszközbeszerzés hozzájárul a magas színvonalú tanulási környezetet biztosításához, az informatikai eszközök beszerzése pedig a digitális szemléletmód tantermekbe integrálásához. (Hungarian)
0 references
The current state of the building to be renovated at Utassy József Primary School is not suitable for educational purposes, it is used as a warehouse. Due to the position of the building, it can become a place for music and art education after renovation, and it can complement the functions of the school building next to it by creating a library room. At present, the premises in the building do not comply with the requirements laid down in the legislation. After the planned conversion, rooms of a suitable size can be constructed by moving internal bulkheads. The current state of the building is not energy efficient and unobstructed. The interior linings are worn out, the washrooms are in a very degraded state. Tiles, floor coverings are over 25 years old. The building’s heating system is outdated, not up to date, inefficient. The project involves the implementation of the following activities: 1. Replacement of the interior floor coverings of the building by moving partitions into 4 rooms, which allow the creation of an art educational room and a library room. Modernisation and accessibility of toilets in the building. Demolition of the washbasin, rooms, roadblocks on 135 m². Laying new floor coverings with glazed ceramic tiles, rooms with hot or semi-hot coverings in a total area of 135 m². Laying of sidewall tiles in toilets on approximately 52 m². 2. Modernisation of the electrical network within the whole building, replacement of armatures, switches, plugs. Modernisation of the building’s heating system, replacement of the boiler, replacement of the heat output side (radiators). In the washrooms, plumbing work, replacement of sanitary facilities. 3. Inner surfaces Painting of wall surfaces inside the building, on 568 m². Preparation of inner surfaces with white or factory-coloured paint in two layers. 4. Insulation and plastering, painting The thermal insulation of the attic slab and outer sides of the building. Wall insulation on 156 m² and 180 m² of external thermal insulation with standard facade EPS sheets with glass mesh reinforcement. Painting of the facade with a single layer of colored noble plaster on 180 m², painting of the plinth with resin bonded plaster layer on 28 m². 5. Demolition of old, outdated wooden doors and windows up to at least 2 m². Replacement and installation of 4 indoor cassette doors within the building, size of the door: 75*210 cm. In addition, 5 wooden doors of 100*210 cm sized indoor MDF or hard shell structure are placed in a pre-missed wooden aperture. Plastic outdoor doors and windows, insulated, enhanced air-tight windows in pre-missed wooden openings. Installation of 2 windows of 0.90*0.60 meters, 6 2,40*1,50 and 1 1.20*1.50 windows. Replace 2 pcs 1.00*2,10 meters and 1 pcs 1.40*2,40 meters in size. 6. Other tasks Recruitment, removal of debris, cleaning and repair work. Accessibility in proportion to the project will be implemented. The building is equipped with a barrier-free entrance and washbasin. Infocommunication accessibility is also achieved, with the development of guide lanes and non-slip coverings. 7. Equipment Procurement contributes to ensuring a high-quality learning environment and the acquisition of IT tools to integrate the digital approach into classrooms. (English)
8 February 2022
0 references
Der derzeitige Zustand des Gebäudes, das in der Utassy József Primary School renoviert werden soll, ist nicht für Bildungszwecke geeignet, es wird als Lager genutzt. Aufgrund der Lage des Gebäudes kann es nach der Renovierung zu einem Ort für Musik und Kunsterziehung werden und kann die Funktionen des daneben liegenden Schulgebäudes durch die Schaffung eines Bibliotheksraums ergänzen. Derzeit entsprechen die Räumlichkeiten des Gebäudes nicht den in den Rechtsvorschriften festgelegten Anforderungen. Nach dem geplanten Umbau können Räume in geeigneter Größe durch Bewegen interner Schotte errichtet werden. Der derzeitige Zustand des Gebäudes ist nicht energieeffizient und ungehindert. Die Innenfutter sind abgenutzt, die Waschräume sind in einem sehr degradierten Zustand. Fliesen, Bodenbeläge sind über 25 Jahre alt. Die Heizung des Gebäudes ist veraltet, nicht auf dem neuesten Stand, ineffizient. Das Projekt umfasst die Durchführung folgender Maßnahmen: 1. Ersatz der Innenbodenbeläge des Gebäudes durch Verschieben von Trennwänden in 4 Räume, die die Schaffung eines Kunstunterrichtsraums und eines Bibliotheksraums ermöglichen. Modernisierung und Zugänglichkeit von Toiletten im Gebäude. Abriss des Waschbeckens, Zimmer, Straßensperren auf 135 m². Legen neue Bodenbeläge mit glasierten Keramikfliesen, Räume mit warmen oder halbheißen Belägen auf einer Gesamtfläche von 135 m². Verlegung von Seitenwandfliesen in Toiletten auf ca. 52 m². 2. Modernisierung des elektrischen Netzes im gesamten Gebäude, Austausch von Armaturen, Schaltern, Steckern. Modernisierung des Heizsystems des Gebäudes, Austausch des Kessels, Austausch der Wärmeleistungsseite (Radiatoren). In den Waschräumen, Sanitärarbeiten, Ersatz der Sanitäranlagen. 3. Innenflächen Malerei von Wandflächen im Inneren des Gebäudes, auf 568 m². Vorbereitung der Innenflächen mit weißer oder werksfarbener Farbe in zwei Schichten. 4. Isolierung und Verputzen, Malerei Die Wärmedämmung der Dachplatte und der Außenseiten des Gebäudes. Wanddämmung auf 156 m² und 180 m² Außenwärmedämmung mit Standardfassade EPS Platten mit Glasmaschenverstärkung. Malerei der Fassade mit einer einzigen Schicht von farbigem Edelputz auf 180 m², Malerei des Sockels mit Harz verklebter Gipsschicht auf 28 m². 5. Abriss von alten, veralteten Holztüren und Fenstern bis zu mindestens 2 m². Ersatz und Einbau von 4 Innenkassettentüren innerhalb des Gebäudes, Größe der Tür: 75*210 cm. Darüber hinaus werden 5 Holztüren mit 100*210 cm großen Innen-MDF- oder Hartschalenstruktur in einer vorverlegten Holzöffnung platziert. Außentüren und Fenster aus Kunststoff, isolierte, verbesserte luftdichte Fenster in vorvermissten Holzöffnungen. Installation von 2 Fenstern von 0,90*0,60 Metern, 6 2,40*1,50 und 1 1,20*1.50 Fenster. Ersetzen Sie 2 Stück 1,00*2,10 Meter und 1 Stück 1.40*2,40 Meter groß. 6. Andere Aufgaben Rekrutierung, Beseitigung von Trümmern, Reinigungs- und Reparaturarbeiten. Im Verhältnis zum Projekt wird die Zugänglichkeit umgesetzt. Das Gebäude ist mit einem barrierefreien Eingang und Waschbecken ausgestattet. Die Infokommunikation wird ebenfalls erreicht, mit der Entwicklung von Führungsspuren und rutschfesten Belägen. 7. Die Beschaffung von Ausrüstungen trägt dazu bei, ein hochwertiges Lernumfeld und den Erwerb von IT-Tools zur Integration des digitalen Ansatzes in Klassenräume zu gewährleisten. (German)
9 February 2022
0 references
L’état actuel du bâtiment à rénover à l’école primaire Utassy József n’est pas adapté à des fins éducatives, il est utilisé comme entrepôt. En raison de la position du bâtiment, il peut devenir un lieu pour l’éducation musicale et artistique après rénovation, et il peut compléter les fonctions du bâtiment de l’école à côté en créant une salle de bibliothèque. À l’heure actuelle, les locaux du bâtiment ne sont pas conformes aux exigences prévues par la législation. Après la transformation prévue, des pièces d’une taille appropriée peuvent être construites en déplaçant des cloisons internes. L’état actuel du bâtiment n’est ni économe en énergie ni obstrué. Les doublures intérieures sont usées, les toilettes sont dans un état très dégradé. Tuiles, revêtements de sol ont plus de 25 ans. Le système de chauffage du bâtiment est désuète, pas à jour, inefficace. Le projet comprend la mise en œuvre des activités suivantes: 1. Remplacement des revêtements de sol intérieurs du bâtiment en déplaçant les cloisons en 4 pièces, ce qui permet la création d’une salle d’enseignement artistique et d’une salle de bibliothèque. Modernisation et accessibilité des toilettes dans le bâtiment. Démolition du lavabo, chambres, barrages routiers sur 135 m². Pose de nouveaux revêtements de sol avec carreaux de céramique vitrés, chambres avec revêtements chauds ou semi-chauds sur une superficie totale de 135 m². Pose de tuiles latérales dans les toilettes sur environ 52 m². 2. Modernisation du réseau électrique dans l’ensemble du bâtiment, remplacement des armatures, interrupteurs, prises. Modernisation du système de chauffage du bâtiment, remplacement de la chaudière, remplacement du côté puissance thermique (radiateurs). Dans les toilettes, travaux de plomberie, remplacement des installations sanitaires. 3. Surfaces intérieures Peinture des surfaces murales à l’intérieur du bâtiment, sur 568 m². Préparation des surfaces intérieures avec de la peinture blanche ou de couleur usine en deux couches. 4. Isolation et plâtrage, peinture L’isolation thermique de la dalle du grenier et des côtés extérieurs du bâtiment. Isolation murale sur 156 m² et 180 m² d’isolation thermique externe avec des feuilles de façade standard EPS avec renfort en maille de verre. Peinture de la façade avec une seule couche de plâtre noble coloré sur 180 m², peinture du socle avec couche de plâtre collé résine sur 28 m². 5. Démolition de vieilles portes et fenêtres en bois dépassées d’au moins 2 m². Remplacement et installation de 4 portes à cassettes intérieures à l’intérieur du bâtiment, taille de la porte: 75 * 210 cm. En outre, 5 portes en bois de 100 * 210 cm de taille MDF intérieure ou structure de coque dure sont placées dans une ouverture en bois pré-missée. Portes et fenêtres extérieures en plastique, isolées et renforcées fenêtres étanches à l’air dans des ouvertures en bois pré-missées. Installation de 2 fenêtres de 0,90*0,60 mètres, 6 2,40*1,50 et 1 1,20*1.50 fenêtres. Remplacez 2 pcs 1.00 * 2,10 mètres et 1 pcs 1.40 * 2,40 mètres en taille. 6. Autres tâches Recrutement, enlèvement des débris, travaux de nettoyage et de réparation. L’accessibilité sera mise en œuvre proportionnellement au projet. Le bâtiment est équipé d’une entrée et d’un lavabo sans barrière. L’accessibilité à l’infocommunication est également assurée, avec le développement de voies de guidage et de revêtements antidérapants. 7. L’approvisionnement en matériel contribue à garantir un environnement d’apprentissage de haute qualité et l’acquisition d’outils informatiques pour intégrer l’approche numérique dans les salles de classe. (French)
10 February 2022
0 references
Tarnalelesz, Heves
0 references
Identifiers
EFOP-4.1.3-17-2017-00220
0 references