INSTALLATION FOR ENERGY EFFICIENCY IN MOLINI SPIGADORO SPA OF: TWO PHOTOVOLTAIC SYSTEMS WITH A POWER OF 300WP ON TWO SEPARATE BUILDINGS: BUILDING 1 N 66 PANELS 19,8KWP, BUILDING 2 N 264 PANELS 79,2KWP. (Q4279786): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: The budget was changed)
(‎Removed claims)
Property / budget
43,864.18 Euro
Amount43,864.18 Euro
UnitEuro
 
Property / budget: 43,864.18 Euro / rank
Normal rank
 
Property / EU contribution
0.0 Euro
Amount0.0 Euro
UnitEuro
 
Property / EU contribution: 0.0 Euro / rank
Normal rank
 
Property / co-financing rate
0.0 percent
Amount0.0 percent
Unitpercent
 
Property / co-financing rate: 0.0 percent / rank
Normal rank
 

Revision as of 17:33, 12 February 2022

Project Q4279786 in Italy
Language Label Description Also known as
English
INSTALLATION FOR ENERGY EFFICIENCY IN MOLINI SPIGADORO SPA OF: TWO PHOTOVOLTAIC SYSTEMS WITH A POWER OF 300WP ON TWO SEPARATE BUILDINGS: BUILDING 1 N 66 PANELS 19,8KWP, BUILDING 2 N 264 PANELS 79,2KWP.
Project Q4279786 in Italy

    Statements

    0 references
    MOLINI SPIGADORO S.P.A.
    0 references
    0 references
    0 references

    43°4'3.94"N, 12°32'58.49"E
    0 references
    INSTALLAZIONE AI FINI DELL 'EFFICIENTAMENTO ENERGETICO IN MOLINI SPIGADORO SPA DI: DUE IMPIANTI FOTOVOLTAICI CON UNA POTENZA DI 300WP SU DUE DISTINTI EDIFICI: EDIFICIO 1 N 66 PANNELLI 19,8KWP, EDIFICIO 2 N 264 PANNELLI 79,2KWP. (Italian)
    0 references
    INSTALLATION FOR ENERGY EFFICIENCY IN MOLINI SPIGADORO SPA OF: TWO PHOTOVOLTAIC SYSTEMS WITH A POWER OF 300WP ON TWO SEPARATE BUILDINGS: BUILDING 1 N 66 PANELS 19,8KWP, BUILDING 2 N 264 PANELS 79,2KWP. (English)
    2 February 2022
    0 references
    INSTALLATION POUR L’EFFICACITÉ ÉNERGÉTIQUE À MOLINI SPIGADORO SPA DE: DEUX SYSTÈMES PHOTOVOLTAÏQUES D’UNE PUISSANCE DE 300WP SUR DEUX BÂTIMENTS DISTINCTS: BÂTIMENT 1 N 66 PANNEAUX 19,8KWP, BÂTIMENT 2 N 264 PANNEAUX 79,2KWP. (French)
    3 February 2022
    0 references
    INSTALLATION FÜR ENERGIEEFFIZIENZ IM MOLINI SPIGADORO SPA VON: ZWEI PHOTOVOLTAIKANLAGEN MIT EINER LEISTUNG VON 300WP AN ZWEI GETRENNTEN GEBÄUDEN: GEBÄUDE 1 N 66 PLATTEN 19,8KWP, GEBÄUDE 2 N 264 PLATTEN 79,2KWP. (German)
    4 February 2022
    0 references
    INSTALLATIE VOOR ENERGIE-EFFICIËNTIE IN MOLINI SPIGADORO SPA VAN: TWEE FOTOVOLTAÏSCHE SYSTEMEN MET EEN VERMOGEN VAN 300WP OP TWEE AFZONDERLIJKE GEBOUWEN: GEBOUW 1 N 66 PANELEN 19,8KWP, GEBOUW 2 N 264 PANELEN 79,2KWP. (Dutch)
    4 February 2022
    0 references
    INSTALACIÓN PARA EFICIENCIA ENERGÉTICA EN EL SPA MOLINI SPIGADORO DE: DOS SISTEMAS FOTOVOLTAICOS CON UNA POTENCIA DE 300WP EN DOS EDIFICIOS SEPARADOS: EDIFICIO 1 N 66 PANELES 19,8KWP, EDIFICIO 2 N 264 PANELES 79,2KWP. (Spanish)
    4 February 2022
    0 references
    BASTIA UMBRA
    0 references

    Identifiers