Property / budget | |||||||
| |||||||
Property / budget: 968,490.82 Euro / rank | |||||||
Property / EU contribution | |||||||
| |||||||
Property / EU contribution: 0.0 Euro / rank | |||||||
Property / co-financing rate | |||||||
| |||||||
Property / co-financing rate: 0.0 percent / rank | |||||||
Revision as of 15:47, 12 February 2022
Project Q2023822 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | THE JOINT PLACE OF GLUES SANNITA — ‘THE CLEAN-UP OF THE MUNICIPAL LANDFILL IN LOCALITING’ WATER WILL BE REMOVED.’ |
Project Q2023822 in Italy |
Statements
1 June 2012
0 references
14 November 2018
0 references
27 April 2018
0 references
COMUNE DI COLLE SANNITA
0 references
IL PROGETTO PREVEDE LE ATTIVITÃ DI SEGUITO INDICATE:- RIPULITURA MANTO ERBACEO ED ARBOREO COMPRENSIVA DI ERADICAZIONE INTEGRALE,- RIPROFILATURA DEL CORPO DI DISCARICA,- CAPPING (COPERTURA DEFINITIVA DELLA DISCARICA),- REGIMAZIONE ACQUE METEORICHE,- REALIZZAZIONE MURO DI CONTENIMENTO NEL SETTORE DI VALLE,- REALIZZAZIONE POZZI DI EMUNGIMENTO DELLE ACQUE DI DISCARICA (BARRIERA IDRAULICA),- REALIZZAZIONE DIAFRAMMI IMPERMEABILI,- CONDIZIONAMENTO PIEZOMETRI,- RIPRISTINO AMBIENTALE. (Italian)
0 references
THE PROJECT WILL PROVIDE FOR THE FOLLOWING ACTIVITIES: — GREEN AND WOODED GREEN COVER INCLUDING FULL ERADICATION, -REPROFILING OF THE LANDFILL BODY, — CAPPING (FINAL COVERAGE OF THE LANDFILL SITE), — RAIN WATER MANAGEMENT, — PRODUCTION WALL CONTAINMENT IN THE DOWNSTREAM SECTOR, AND THE PRODUCTION OF WELLS IN THE DOWNSTREAM WATER AND TO THE CONSTRUCTION OF A WATER BARRIER, -, AND WATER-CONDITIONING, AND PIEZOMETERS, TO RESTORE THE ENVIRONMENT. (English)
0 references
LE PROJET PRÉVOIT LES ACTIVITÉS SUIVANTES:- NETTOYAGE DU MANTEAU HERBACÉ ET ARBORÉ, Y COMPRIS ÉRADICATION INTÉGRALE,- REMISE EN ÉTAT DE L’ORGANISME DE MISE EN DÉCHARGE,- PLAFONNEMENT (COUVERTURE FINALE DE LA DÉCHARGE),- RÈGLEMENT SUR L’EAU DE PLUIE,- CONSTRUCTION D’UN MUR DE CONFINEMENT DANS LE SECTEUR DE LA VALLÉE,- CONSTRUCTION DE PUITS EMLONGATION D’EAU DE DÉCHARGE (BARRIÈRE HYDRAULIQUE),- CONSTRUCTION DE DIAPHRAGMES IMPERMÉABLES,- CONDITIONNEMENT DU PIÉZOMÈTRE,- RESTAURATION DE L’ENVIRONNEMENT. (French)
14 December 2021
0 references
HET PROJECT VOORZIET IN DE VOLGENDE ACTIVITEITEN:- SCHOONMAKEN VAN KRUIDACHTIGE EN ARBOREAL MANTEL MET INBEGRIP VAN INTEGRALE UITROEIING,- HERPROFILERING VAN DE STORTPLAATS,- AFDEKKEN (EINDBEDEKKING VAN DE STORTPLAATS),- REGENWATERVERORDENING,- BOUW VAN INSLUITINGSMUUR IN DE VALLEISECTOR,- BOUW VAN STORTPLAATSWATER EMLONGATIEPUTTEN (HYDRAULISCHE BARRIÈRE),- BOUW VAN WATERDICHTE DIAFRAGMA’S,- PIËZOMETERCONDITIONERING,- MILIEUHERSTEL. (Dutch)
23 December 2021
0 references
DAS PROJEKT SIEHT FOLGENDE TÄTIGKEITEN VOR:- REINIGUNG VON KRAUTIGEN UND ARBOREALEN MANTEL EINSCHLIESSLICH INTEGRALER AUSROTTUNG,- NEUPROFILIERUNG DES DEPONIEKÖRPERS,- DECKELUNG (ENDUMMANTELUNG DER DEPONIE),- REGENWASSERREGULIERUNG,- BAU VON STAUMAUERN IM TALSEKTOR,- BAU VON DEPONIEWASSER EMLONGATION BRUNNEN (HYDRAULISCHE BARRIERE),- BAU WASSERDICHTER MEMBRANEN,- PIEZOMETERKONDITIONIERUNG,- UMWELTSANIERUNG. (German)
24 December 2021
0 references
EL PROYECTO PREVÉ LAS SIGUIENTES ACTIVIDADES:- LIMPIEZA DEL MANTO HERBÁCEO Y ARBÓREO, INCLUIDA LA ERRADICACIÓN INTEGRAL,- REPROFILADO DEL CUERPO DEL VERTEDERO,- TAPONAMIENTO (CUBIERTA FINAL DEL VERTEDERO),- REGULACIÓN DEL AGUA DE LLUVIA,- CONSTRUCCIÓN DE MUROS DE CONTENCIÓN EN EL SECTOR DEL VALLE,- CONSTRUCCIÓN DE POZOS DE AGUA DE VERTEDERO (BARRERA HIDRÁULICA),- CONSTRUCCIÓN DE DIAFRAGMAS IMPERMEABLES,- ACONDICIONAMIENTO PIEZÓMETRO,- RESTAURACIÓN DEL MEDIO AMBIENTE. (Spanish)