TO BE LINKED AT ALL TIMES (Q1874359): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claims)
(‎Changed an Item: The budget was changed)
Property / budget
 
7,500.0 Euro
Amount7,500.0 Euro
UnitEuro
Property / budget: 7,500.0 Euro / rank
 
Normal rank
Property / EU contribution
 
3,750.0 Euro
Amount3,750.0 Euro
UnitEuro
Property / EU contribution: 3,750.0 Euro / rank
 
Normal rank
Property / co-financing rate
 
50.0 percent
Amount50.0 percent
Unitpercent
Property / co-financing rate: 50.0 percent / rank
 
Normal rank

Revision as of 16:41, 11 February 2022

Project Q1874359 in Italy
Language Label Description Also known as
English
TO BE LINKED AT ALL TIMES
Project Q1874359 in Italy

    Statements

    0 references
    3,750.0 Euro
    0 references
    7,500.0 Euro
    0 references
    50.0 percent
    0 references
    26 January 2016
    0 references
    14 December 2016
    0 references
    14 December 2016
    0 references
    " ATERNO - MANTHONE' "
    0 references

    42°28'10.60"N, 14°12'21.35"E
    0 references
    IL PROGETTO PREVEDE LA REALIZZAZIONE DI 1 CABLAGGIO IN CAT 6 COMPLETO DI RACK 19 POLLICI E 20 POSTAZIONI NEL LABORATORIO GEOMETRI DEL SECONDO PIANO DELLA PALAZZINA VICE PRESIDENZA 2 NUOVE DORSALI GIGABIT DAL CENTRO STELLA ESISTENTE VERSO I 6 LABORATORI DEL 2 PIANO VERSO IL LABORATORIO DEL 1 PIANO ED AL PIANO TERRA IN AULA MAGNA E LABORATORIO DI SOSTEGNO 3 NUOVE DORSALI NELLEDIFICIO PRESIDENZA DAL CENTRO STELLA DEL PIANO TERRA VERSO LAULA MAGNA ED IL RACK DEL SECONDO PIANO 4 DORSALE DAL RACK 2 PIANO ALLAULA 5 REALIZZAZIONE DEL CABLAGGIO STRUTTURATO APPARATI PASSIVI IL DIMENSIONAMENTO DEL PROGETTO E LE CARATTERISTICHE DELLA SOLUZIONE SARANNO TALI DA ASSICURARE UNA ELEVATA SCALABILIT E FLESSIBILIT CHE TENGA CONTO DELLEVOLUZIONE PRESUNTA SUL CARICO DI LAVORO DELLAMMINISTRAZIONE NELLA FASE DI PROGETTAZIONE SI TENUTO CONTO DELLE POSSIBILI OTTIMIZZAZIONI IN TERMINI DI EFFICIENZA E DI RISPARMIO ENERGETICO DELLA RETE LOCALE E DELLE INFRASTRUTTURE COLLEGATE O FORNITURA DI MATERIALI ED ATTREZZAG (Italian)
    0 references
    THE PROJECT INVOLVES THE CONSTRUCTION OF 1 CABLING IN CAT 6 COMPLETE RACK-19 INCHES AND 20 LOCATIONS IN THE SURVEYORS OF THE SECOND FLOOR OF THE PALAZZINA VICE-PRESIDENT FOR THE 2-FLOOR OF THE 6-FLOOR AND THE 2 GROUND FLOOR FOR NEW BACKBONE NETWORKS IN THE 1 FLOOR AND TO THE GROUND FLOOR IN THE FLOOR IN THE CENTRE OF THE GROUND FLOOR AND THE RACK OF THE SECOND FLOOR 3 BACKBONE PLAN FOR MAGNA AND THE RACK OF THE SECOND FLOOR 4 FLOOR 2 ALLAAWU, 5 THE DESIGN OF THE STRUCTURED SYSTEM CABLING AND THE CHARACTERISTICS OF THE SOLUTION WILL BE SUCH AS TO ENSURE A HIGH SCALE OF EFFICIENCY AND ENERGY SAVING OF THE LOCAL NETWORK AND OF THE INFRASTRUCTURE CONNECTED WITH, OR SUPPLY OF, MATERIALS AND INFRASTRUCTURE (English)
    0 references
    LE PROJET IMPLIQUE LA RÉALISATION DE 1 CABLAGGIO EN CAT 6 COMPLET AVEC RACK 19 POUCES ET 20 STATIONS DANS LE LABORATOIRE DES GÉOMÈTRES DU DEUXIÈME ÉTAGE DU VICE-PRÉSIDENT BÂTIMENT 2 NOUVELLES DORSALES GIGABIT DU CENTRE ÉTOILE EXISTANT VERS LES 6 LABORATOIRES DE L’ÉTAGE 2ND VERS LE LABORATOIRE DU 1ST ÉTAGE ET AU REZ-DE-CHAUSSÉE À AULA MAGNA ET LE LABORATOIRE DE SOUTIEN 3 NOUVELLES DORSALES DANS LE BÂTIMENT DE LA PRÉSIDENCE DU CENTRE DE L’ÉTOILE AU REZ-DE-CHAUSSÉE VERS LAULA MAGNA ET LE RACK DU DEUXIÈME ÉTAGE 4 ARRIÈRE DU RACK 2 ÉTAGE À HALL 5 LA RÉALISATION DES DISPOSITIFS PASSIFS DE CÂBLAGE STRUCTURÉ LE DIMENSIONNEMENT DU PROJET ET LES CARACTÉRISTIQUES DE LA SOLUTION SERONT DE NATURE À ASSURER UNE ÉVOLUTIVITÉ ET UNE FLEXIBILITÉ ÉLEVÉES EN TENANT COMPTE DE L’ÉVOLUTION SUPPOSÉE DE LA CHARGE DE TRAVAIL DE L’ADMINISTRATION AU COURS DE LA PHASE DE CONCEPTION EN TENANT COMPTE DES OPTIMISATIONS POSSIBLES EN TERMES D’EFFICACITÉ ET D’ÉCONOMIE D’ÉNERGIE DU RÉSEAU LOCAL ET DES INFRASTRUCTURES CONNEXES OU DE LA FOURNITURE DE MATÉRIAUX ET D’ÉQUIPEMENTS (French)
    10 December 2021
    0 references
    HET PROJECT OMVAT DE REALISATIE VAN 1 CABLAGGIO IN KAT 6 COMPLEET MET RACK 19 INCH EN 20 STATIONS IN DE LABORATORIUMONDERZOEKERS VAN DE TWEEDE VERDIEPING VAN HET VICE PRESIDENT GEBOUW 2 NIEUWE GIGABIT DORSALS VAN HET BESTAANDE STERCENTRUM NAAR DE 6 LABORATORIA VAN DE 2ND VERDIEPING NAAR HET LABORATORIUM VAN DE 1ST VERDIEPING EN OP DE BEGANE GROND IN AULA MAGNA EN ONDERSTEUNING LABORATORIUM 3 NIEUWE DORSALS IN HET PRESIDIUM GEBOUW VANUIT HET CENTRUM VAN DE STER OP DE BEGANE GROND RICHTING LAULA MAGNA EN HET REK VAN DE TWEEDE VERDIEPING 4 TERUG VAN DE REK 2 VERDIEPING NAAR HAL 5 REALISATIE VAN DE GESTRUCTUREERDE BEDRADING PASSIEVE APPARATEN DE GROOTTE VAN HET PROJECT EN DE KENMERKEN VAN DE OPLOSSING ZAL ZODANIG ZIJN DAT EEN HOGE SCHAALBAARHEID EN FLEXIBILITEIT, REKENING HOUDEND MET DE VERONDERSTELDE ONTWIKKELING VAN DE WERKLAST VAN DE ADMINISTRATIE TIJDENS DE ONTWERPFASE, REKENING HOUDEND MET DE MOGELIJKE OPTIMALISATIES OP HET GEBIED VAN EFFICIËNTIE EN ENERGIEBESPARING VAN HET LOKALE NETWERK EN DE BIJBEHORENDE INFRASTRUCTUUR OF LEVERING VAN MATERIALEN EN APPARATUUR (Dutch)
    22 December 2021
    0 references
    DAS PROJEKT BEINHALTET DIE REALISIERUNG VON 1 CABLAGGIO IN KATZE 6 KOMPLETT MIT RACK 19 ZOLL UND 20 STATIONEN IN DEN LABORVERMESSERN IM ZWEITEN STOCK DES VICE PRESIDENT GEBÄUDES 2 NEUE GIGABIT DORSALS AUS DEM BESTEHENDEN STERNZENTRUM IN RICHTUNG DER 6 LABORE DES 2ND-BODENS IN RICHTUNG DES LABORS DER 1ST ETAGE UND IM ERDGESCHOSS IN AULA MAGNA UND UNTERSTÜTZEN LABOR 3 NEUE DORSALS IM PRÄSIDENTSCHAFTSGEBÄUDE VOM ZENTRUM DES STERNS IM ERDGESCHOSS IN RICHTUNG LAULA MAGNA UND DEM RACK DES ZWEITEN STOCKES 4 ZURÜCK VOM RACK 2 STOCK BIS HALLE 5 DIE REALISIERUNG DER STRUKTURIERTEN PASSIVEN VERDRAHTUNGSGERÄTE, DIE DIE GRÖSSE DES PROJEKTS UND DIE MERKMALE DER LÖSUNG ERMÖGLICHEN, WIRD EINE HOHE SKALIERBARKEIT UND FLEXIBILITÄT GEWÄHRLEISTEN, WOBEI DIE ANGENOMMENE ENTWICKLUNG DER ARBEITSBELASTUNG DER VERWALTUNG WÄHREND DER PLANUNGSPHASE UNTER BERÜCKSICHTIGUNG DER MÖGLICHEN OPTIMIERUNGEN IN BEZUG AUF EFFIZIENZ UND ENERGIEEINSPARUNG DES LOKALEN NETZES UND DER DAMIT VERBUNDENEN INFRASTRUKTUR ODER DER VERSORGUNG MIT MATERIALIEN UND AUSRÜSTUNGEN ZU BERÜCKSICHTIGEN IST. (German)
    23 December 2021
    0 references
    EL PROYECTO IMPLICA LA REALIZACIÓN DE 1 CABLAGGIO EN GATO 6 COMPLETO CON RACK 19 PULGADAS Y 20 ESTACIONES EN LOS TOPÓGRAFOS DE LABORATORIO DE LA SEGUNDA PLANTA DEL EDIFICIO VICEPRESIDENTE 2 NUEVOS DORSALES GIGABIT DEL CENTRO ESTELAR EXISTENTE HACIA LOS 6 LABORATORIOS DEL PISO 2ND HACIA EL LABORATORIO DE LA PLANTA 1ST Y EN LA PLANTA BAJA EN AULA MAGNA Y LABORATORIO DE APOYO 3 NUEVOS DORSALES EN EL EDIFICIO DE PRESIDENCIA DESDE EL CENTRO DE LA ESTRELLA EN LA PLANTA BAJA HACIA LAULA MAGNA Y EL ESTANTE DE LA SEGUNDA PLANTA 4 DETRÁS DEL ESTANTE 2 PISO AL PABELLÓN 5 LA REALIZACIÓN DE LOS DISPOSITIVOS PASIVOS DE CABLEADO ESTRUCTURADO EL TAMAÑO DEL PROYECTO Y LAS CARACTERÍSTICAS DE LA SOLUCIÓN SERÁN TALES QUE GARANTICEN UNA ALTA ESCALABILIDAD Y FLEXIBILIDAD, TENIENDO EN CUENTA LA SUPUESTA EVOLUCIÓN DE LA CARGA DE TRABAJO DE LA ADMINISTRACIÓN DURANTE LA FASE DE DISEÑO, TENIENDO EN CUENTA LAS POSIBLES OPTIMIZACIONES EN TÉRMINOS DE EFICIENCIA Y AHORRO ENERGÉTICO DE LA RED LOCAL Y DE LA INFRAESTRUCTURA RELACIONADA O SUMINISTRO DE MATERIALES Y EQUIPOS. (Spanish)
    23 January 2022
    0 references
    PESCARA
    0 references

    Identifiers