URGENT WORK TO SECURE, RESTORE AND CONSOLIDATE AS A RESULT OF AN EMERGENCY RESPONSE TO EMERGENCY CIVIL PROTECTION — S.P. 430 MUNICIPALITY OF AGROPOLI FROM KM 100 + 400 TO 100 + 500 (Q2023232): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in es, and other parts: Adding Spanish translations) |
(Changed an Item: import item from Italy) |
||
Property / location (string) | |||
AGROPOLI | |||
Property / location (string): AGROPOLI / rank | |||
Normal rank |
Revision as of 12:58, 10 February 2022
Project Q2023232 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | URGENT WORK TO SECURE, RESTORE AND CONSOLIDATE AS A RESULT OF AN EMERGENCY RESPONSE TO EMERGENCY CIVIL PROTECTION — S.P. 430 MUNICIPALITY OF AGROPOLI FROM KM 100 + 400 TO 100 + 500 |
Project Q2023232 in Italy |
Statements
525,000.0 Euro
0 references
700,000.0 Euro
0 references
75.0 percent
0 references
3 October 2016
0 references
30 September 2018
0 references
PROVINCIA DI SALERNO
0 references
MESSA IN SICUREZZA DI UNA PORZIONE DI TRACCIATO STRADALE INTERVENENDO SULLA STABILITÃ GLOBALE DELLA CARREGGIATA STRADALE CHE SI SVILUPPA A MEZZA COSTA DELIMITATA A MONTE E A VALLE DA SCARPATE IN LIEVE PENDENZA. REALIZZAZIONE DI OPERE DI CONSOLIDAMENTO DELLA CARREGGIATA IN FRANA, RIPRISTINO E STABILIZZAZIONE DEL PIANO CARRABILE DELLA S.P. 430 NEL TRATTO DAL KM 100+400 AL 100+500. (Italian)
0 references
THE ROAD SECTION IS SECURED BY TAKING ACTION ON THE OVERALL ROAD THAT TAKES PLACE IN HALF THE COAST, WHICH IS DELIMITED UPSTREAM AND DOWNSTREAM FROM SLOPES OF SLOPES WITH A SLIGHT SLOPE. WORK TO CONSOLIDATE THE ROAD IN LANDSLIDE, REHABILITATION AND STABILISATION OF THE ROAD MAP OF S.P. 430 IN THE STRETCH FROM KM 100 + 400 TO 100 + 500. (English)
0 references
SÉCURISER UNE PARTIE DU SENTIER ROUTIER EN INTERVENANT SUR LA STABILITÉ GÉNÉRALE DE LA ROUTE QUI SE DÉVELOPPE SUR LA MOITIÉ DE LA CÔTE DÉLIMITÉE À MONTE ET EN AVAL PAR DES PENTES SUR UNE LÉGÈRE PENTE. CONSTRUCTION DE TRAVAUX DE CONSOLIDATION DE ROUTES DE GLISSEMENT DE TERRAIN, RESTAURATION ET STABILISATION DU PLAN ROUTIER S.P. 430 SUR LE TRONÇON DE 100+ 400 À 100+ 500. (French)
14 December 2021
0 references
HET VASTZETTEN VAN EEN DEEL VAN HET WEGPAD DOOR TE INTERVENIËREN OP DE ALGEMENE STABILITEIT VAN DE WEG DIE ZICH ONTWIKKELT OP DE HALVE KUST BEGRENSD BIJ MONTE EN STROOMAFWAARTS DOOR HELLINGEN OP EEN LICHTE HELLING. BOUW VAN GRONDVERSCHUIVINGSWERKZAAMHEDEN, HERSTEL EN STABILISATIE VAN HET WEGENPLAN S.P. 430 IN HET TRAJECT VAN KM 100+ 400 TOT 100+ 500. (Dutch)
23 December 2021
0 references
SICHERUNG EINES TEILS DES WEGES DURCH EINGREIFEN AUF DIE GESAMTSTABILITÄT DER FAHRBAHN, DIE SICH AN DER HALBEN KÜSTE, DIE AN MONTE UND FLUSSABWÄRTS VON HÄNGEN AUF EINEM LEICHTEN HANG BEGRENZT WIRD, ENTWICKELT. BAU VON STRASSENBEFESTIGUNGSARBEITEN, SANIERUNG UND STABILISIERUNG DES STRASSENPLANS S.P. 430 IN DER STRECKE VON KM 100+ 400 BIS 100+ 500. (German)
24 December 2021
0 references
ASEGURAR UNA PARTE DE LA SENDA DE CARRETERA INTERVINIENDO SOBRE LA ESTABILIDAD GENERAL DE LA CARRETERA QUE SE DESARROLLA EN LA MITAD DE LA COSTA DELIMITADA POR MONTE Y AGUAS ABAJO POR LADERAS EN UNA LIGERA PENDIENTE. CONSTRUCCIÓN DE OBRAS DE CONSOLIDACIÓN DE CARRETERAS DESPRENDIDAS, RESTAURACIÓN Y ESTABILIZACIÓN DEL PLAN DE CARRETERAS S.P. 430 EN EL TRAMO DESDE EL KM 100+ 400 HASTA 100+ 500. (Spanish)
24 January 2022
0 references
AGROPOLI
0 references
Identifiers
H87H15002360006
0 references